Installation of the ACT Pressure Reducing Valve
TASK 28-28-42-400-002-A
Installation of the ACT Pressure Reducing Valve
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 28-28-42-860-054-B ** ON A/C NOT FOR ALL
Subtask 28-28-42-420-051-B ** ON A/C NOT FOR ALL
Subtask 28-28-42-410-050-B ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:17:58 UTC
Installation of the ACT Pressure Reducing Valve
WARNING:
OBEY THE FUEL SAFETY PROCEDURES.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
1. Reason for the Job- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 150 | AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT |
| 151BC, 826 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-55-11-000-002-A | Removal of the Ceiling Panels in the Aft Cargo-Compartment - FR47/FR59 |
| TASK 25-55-11-400-002-A | Installation of the Ceiling Panels in the Aft Cargo-Compartment - FR47/FR59 |
| TASK 28-00-00-910-001-A | Fuel Safety Procedures |
| TASK 28-25-00-710-002-A | Operational Test of the Defuel System |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 28-28-42-860-054-B ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) Make sure that the aircraft electrical circuits are energized.
(Ref. AMM TASK 24-41-00-861-002).
(3) Make sure that the ACCESS PLATFORM 2M (6 FT) is below aft cargo compartment 826.
(4) Make sure that aft cargo-compartment door 826 is open (Ref. AMM TASK 52-30-00-860-001).
(5) Make sure that CARGO COMPT LIGHT switch 8LU is in the ON position.
(6) On refuel/defuel control panels 801VU and 800VU, on fuel control panel 40VU and Additional Center Tank (ACT) control panel 28VU:
(a) Make sure that the warning notices are in position to tell persons not to operate the refuel/defuel system.
(7) Make sure that ceiling panel 151BC is removed (Ref. AMM TASK 25-55-11-000-002).
Subtask 28-28-42-865-057-A ** ON A/C NOT FOR ALL (1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) Make sure that the aircraft electrical circuits are energized.
(Ref. AMM TASK 24-41-00-861-002).
(3) Make sure that the ACCESS PLATFORM 2M (6 FT) is below aft cargo compartment 826.
(4) Make sure that aft cargo-compartment door 826 is open (Ref. AMM TASK 52-30-00-860-001).
(5) Make sure that CARGO COMPT LIGHT switch 8LU is in the ON position.
(6) On refuel/defuel control panels 801VU and 800VU, on fuel control panel 40VU and Additional Center Tank (ACT) control panel 28VU:
(a) Make sure that the warning notices are in position to tell persons not to operate the refuel/defuel system.
(7) Make sure that ceiling panel 151BC is removed (Ref. AMM TASK 25-55-11-000-002).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/ACT AIR SOV/MAN/SPLY | 64QH | J20 |
| 121VU | FUEL/ACT AIR SOV/AUTO/SPLY | 63QH | J19 |
| 121VU | FUEL/ACT XFR VLV/MOT2 | 66QH | J18 |
| 121VU | FUEL/ACT XFR VLV/MOT1 | 65QH | J17 |
| 121VU | FUEL/HI/LVL/SPLY | 1QJ | L24 |
| 121VU | FUEL/RFL/DFL/SPLY | 2QU | L23 |
| 121VU | FUEL/RFL/DFL/XFR/DEFUEL/VALVE | 1QU | L22 |
| 121VU | FUEL/ACT VENT VLV/MAN/SPLY | 62QH | L21 |
| 121VU | FUEL/ACT VENT VLV/AUTO/SPLY | 61QH | L20 |
| 121VU | FUEL/ACT/FUEL PUMP/SPLY | 25QH | Q29 |
Subtask 28-28-42-420-051-B ** ON A/C NOT FOR ALL
A. Installation of the Pressure Reducing Valve
(1) Remove the PLUG-BLANKING from each disconnected line end.
(2) Clean the component interfaces and the adjacent area.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
(5) Prepare equipment for electrical bonding (Ref. AMM TASK 20-28-00-912-802).
(6) Put the pressure reducing valve (4) in position at the support bracket (6).
(7) Put the screws (5) in position and install the washers (7) and the nuts (8).
(8) Tighten the nuts (8).
(9) Apply surface protection to the bonding screw (5) (Ref. AMM TASK 20-28-00-912-802).
(10) Loosely install the union nuts (1), (2) and (3) on their related ports of the pressure reducing valve (4).
Subtask 28-28-42-865-058-A ** ON A/C NOT FOR ALL (1) Remove the PLUG-BLANKING from each disconnected line end.
(2) Clean the component interfaces and the adjacent area.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
(5) Prepare equipment for electrical bonding (Ref. AMM TASK 20-28-00-912-802).
(6) Put the pressure reducing valve (4) in position at the support bracket (6).
(7) Put the screws (5) in position and install the washers (7) and the nuts (8).
(8) Tighten the nuts (8).
(9) Apply surface protection to the bonding screw (5) (Ref. AMM TASK 20-28-00-912-802).
(10) Loosely install the union nuts (1), (2) and (3) on their related ports of the pressure reducing valve (4).
CAUTION:
USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT EQUIPMENT FROM FLEXIBLE HOSES AND RIGID TUBING.
IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL CAUSE DAMAGE TO THE HOSES AND TUBES.
(11) Tighten the union nuts (1), (2) and (3). B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 28-28-42-710-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/ACT AIR SOV/MAN/SPLY | 64QH | J20 |
| 121VU | FUEL/ACT AIR SOV/AUTO/SPLY | 63QH | J19 |
| 121VU | FUEL/ACT XFR VLV/MOT2 | 66QH | J18 |
| 121VU | FUEL/ACT XFR VLV/MOT1 | 65QH | J17 |
| 121VU | FUEL/HI/LVL/SPLY | 1QJ | L24 |
| 121VU | FUEL/RFL/DFL/SPLY | 2QU | L23 |
| 121VU | FUEL/RFL/DFL/XFR/DEFUEL/VALVE | 1QU | L22 |
| 121VU | FUEL/ACT VENT VLV/MAN/SPLY | 62QH | L21 |
| 121VU | FUEL/ACT VENT VLV/AUTO/SPLY | 61QH | L20 |
| 121VU | FUEL/ACT/FUEL PUMP/SPLY | 25QH | Q29 |
C. Test(s)
(1) Do the operational test of the pressure reducing valve (Ref. AMM TASK 28-25-00-710-002).
5. Close-up(1) Do the operational test of the pressure reducing valve (Ref. AMM TASK 28-25-00-710-002).
Subtask 28-28-42-410-050-B ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install ceiling panel 151BC in the aft cargo compartment (Ref. AMM TASK 25-55-11-400-002).
(3) Set CARGO COMPT LIGHT switch 8LU to the OFF position.
(4) Close aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
(5) Remove the access platform(s).
Subtask 28-28-42-860-055-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install ceiling panel 151BC in the aft cargo compartment (Ref. AMM TASK 25-55-11-400-002).
(3) Set CARGO COMPT LIGHT switch 8LU to the OFF position.
(4) Close aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
(5) Remove the access platform(s).
B. Put the aircraft back to the serviceable condition.
(1) From refuel/defuel control panels 801VU and 800VU, fuel control panel 40VU and Additional Center Tank (ACT) control panel 28VU:
(a) Remove the WARNING NOTICE(S).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) From refuel/defuel control panels 801VU and 800VU, fuel control panel 40VU and Additional Center Tank (ACT) control panel 28VU:
(a) Remove the WARNING NOTICE(S).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Pressure Reducing Valve 171QM