W DOC AIRBUS | AMM A320F

Removal of the ACT Pressure Reducing Valve


TASK 28-28-42-000-002-A
Removal of the ACT Pressure Reducing Valve


WARNING: OBEY THE FUEL SAFETY PROCEDURES.
WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
ZONE: 150
FIN: 171QM ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
150
AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT
151BC, 826
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 25-55-11-000-002-A
Removal of the Ceiling Panels in the Aft Cargo-Compartment - FR47/FR59
TASK 28-00-00-910-001-A
Fuel Safety Procedures
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
3. Job Set-up
Subtask 28-28-42-860-053-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
   (2) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
   (3) On refuel/defuel control panels 801VU and 800VU, fuel control panel 40VU and Additional Center Tank (ACT) control panel 28VU:
     (a) Put the WARNING NOTICE(S) in position to tell persons not to operate the refuel/defuel system.
Subtask 28-28-42-865-056-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUFUEL/ACT AIR SOV/MAN/SPLY64QHJ20
121VUFUEL/ACT AIR SOV/AUTO/SPLY63QHJ19
121VUFUEL/ACT XFR VLV/MOT266QHJ18
121VUFUEL/ACT XFR VLV/MOT165QHJ17
121VUFUEL/HI/LVL/SPLY1QJL24
121VUFUEL/RFL/DFL/SPLY2QUL23
121VUFUEL/RFL/DFL/XFR/DEFUEL/VALVE1QUL22
121VUFUEL/ACT VENT VLV/MAN/SPLY62QHL21
121VUFUEL/ACT VENT VLV/AUTO/SPLY61QHL20
121VUFUEL/ACT/FUEL PUMP/SPLY25QHQ29
Subtask 28-28-42-010-051-B ** ON A/C NOT FOR ALL
C. Get Access
   (1) Put an ACCESS PLATFORM 2M (6 FT) in position at aft cargo-compartment door 826.
   (2) Open aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001).
   (3) Set CARGO COMPT LIGHT switch 8LU to the ON position.
   (4) Remove ceiling panel 151BC in the aft cargo compartment (Ref. AMM TASK 25-55-11-000-002).
4. Procedure
Subtask 28-28-42-020-051-B ** ON A/C NOT FOR ALL
A. Removal of the Pressure Reducing Valve
CAUTION: USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT EQUIPMENT FROM FLEXIBLE HOSES AND RIGID TUBING. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL CAUSE DAMAGE TO THE HOSES AND TUBES.
   (1) Loosen the union nuts (1), (2) and (3) and disconnect them from the ports of the pressure reducing valve (4).
   (2) Remove the nuts (8), the washers (7) and the screws (5).
   (3) Remove the pressure reducing valve (4) from the support bracket (6).
   (4) Put the PLUG-BLANKING in each disconnected line end.
[Rev.10 from 2021] 2026.04.02 06:17:58 UTC