W DOC AIRBUS | AMM A320F

Removal of the ACT Transfer Check-Valve


TASK 28-28-41-000-001-A
Removal of the ACT Transfer Check-Valve


WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING: OBEY THE FUEL SAFETY PROCEDURES.
ZONE: 141
ZONE: 142
FIN: 176QM ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
AR
CAP - BLANKING
No specific
AR
CONTAINER 3 L(3/4 USGAL)
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
1
SCRAPER - NON METALLIC
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
141
WING CENTER BOX
142
WING CENTER BOX
148AZ
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 28-00-00-910-001-A
Fuel Safety Procedures
TASK 28-10-00-910-002-A
Access to the Fuel Tanks and the Work Areas
TASK 28-25-00-650-001-A
Pressure Defuel
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
TASK 57-17-11-000-001-B
Removal of Access Cover 148AZ or/and the ACT-Equipment Support Door
F ACT Transfer Check-Valve ** ON A/C NOT FOR ALL
F ACT Transfer Check-Valve ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 28-28-41-941-050-A ** ON A/C NOT FOR ALL
A. Safety Precautions
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
   (2) On the APU section of overhead panel 25VU, make sure that the APU/MASTER SW pushbutton switch is released (the ON legend is off).
   (3) On the FUEL section of overhead panel 40VU, make sure that all the L TK PUMPS and R TK PUMPS pushbutton switches are released (the OFF legends are on).
   (4) Put the WARNING NOTICE(S) in position:
  • On the APU section of overhead panel 25VU to tell persons not to operate the APU/MASTER SW pushbutton switch
  • On the FUEL section of panel 40VU to tell persons not to operate the fuel system
  • On ACT control panel 28VU to tell persons not to operate the control system
  • On ENG/APU FIRE panel 1WD installed overhead panel 20VU to tell persons not to operate the fire extinguishing system.
   (5) You must obey the fuel safety procedures when you do work on the fuel system (Ref. AMM TASK 28-00-00-910-001).
   (6) Put a WARNING NOTICE(S) in position to tell persons not to operate the Main Landing Gear (MLG) doors.
Subtask 28-28-41-650-050-A ** ON A/C NOT FOR ALL
B. Defuel the center tank (Ref. AMM TASK 28-25-00-650-001).
Subtask 28-28-41-865-050-A ** ON A/C NOT FOR ALL
C. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUFUEL/RFL/DFL/SPLY2QUL24
121VUFUEL/RFL/DFL/XFR/DEFUEL/VALVE1QUL23
** ON A/C NOT FOR ALL
121VUFUEL/RFL/DFL/SPLY2QUL23
121VUFUEL/RFL/DFL/XFR/DEFUEL/VALVE1QUL22
Subtask 28-28-41-010-050-A ** ON A/C NOT FOR ALL
D. Get Access
   (1) Open the right MLG door (Ref. AMM TASK 32-12-00-010-001).
   (2) Put an ACCESS PLATFORM 2M (6 FT) in position at the right MLG door.
   (3) Get access to the fuel center tank (Ref. AMM TASK 28-10-00-910-002).
4. Procedure
Subtask 28-28-41-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the Check Valve
F ACT Transfer Check-Valve ** ON A/C NOT FOR ALL
   (1) To remove the sealant/paint:
     (a) Use a SCRAPER - NON METALLIC to remove the sealant/paint from all the applicable fasteners.
   (2) Put a CONTAINER 3 L(3/4 USGAL) below the check valve (21) and the connections between the pipe (27) and the machined tee (18).
   (3) Remove the bolt (9), the washer (10) and the nut (15) from the check valve (21).
   (4) Remove the bonding straps (11) and (12) from the check valve (21).
   (5) Remove the bolt (13), the washer (14) and the nut (17) from the flange (20).
   (6) Remove the bonding strap (12) and (16) from the flange (20).
   (7) Remove the bolts (25) and the washers (26).
   (8) Remove the bolts (23) and the nuts (24).
   (9) Remove the nut (8) of the end pipe (5).
   (10) Disconnect the end pipe (5) from the check valve (21).
   (11) Remove the retaining ring (7)
   (12) Remove and discard the O-ring (6).
   (13) Install a CAP - BLANKING on the end pipe (5).
   (14) Remove the bolts (22) and the nuts (19).
   (15) Remove the check valve (21) and the flange (20) from the machined tee (18).
   (16) Remove the restrictor (2) from the check valve (21).
   (17) Remove and discard the O-ring (3) from the flange (20).
   (18) Put the PLUG-BLANKING in each disconnected line end.
Subtask 28-28-41-020-050-C ** ON A/C NOT FOR ALL
A. Removal of the ACT Transfer Check-Valve
F ACT Transfer Check-Valve ** ON A/C NOT FOR ALL
   (1) To remove the sealant/paint:
     (a) Use a SCRAPER - NON METALLIC to remove the sealant/paint from all the applicable fasteners.
   (2) Put a CONTAINER 3 L(3/4 USGAL) below the ACT transfer check-valve (7) and the connections between the pipe (29) and the machined tee (1).
   (3) Remove the bolt (12), the washer (13) and the nut (16) from the ACT transfer check-valve (7).
   (4) Remove the bonding leads (14) and (15) from the ACT transfer check-valve (7).
   (5) Remove the bolt (17), the washer (18) and the nut (20) from the flange (5).
   (6) Remove the bonding leads (15) and (19) from the flange (5).
   (7) Remove the bolt (25) and the washer (24).
   (8) Remove the bolt (26) and the washer (27).
   (9) Remove the bolt (22) and the nut (23).
   (10) Remove the nut (9) from the end pipe (21).
   (11) Disconnect the end pipe (21) from the ACT transfer check-valve (7).
   (12) Remove the retaining ring (10).
   (13) Remove and discard the O-ring (11).
   (14) Install a CAP - BLANKING on the end pipe (21).
   (15) Remove the bolts (8) and the nuts (2).
   (16) Remove the ACT transfer check-valve (7) and the flange (5) from the machined tee (1).
   (17) Remove the restrictor (4) from the flange (5).
   (18) Remove and discard the O-ring (6) from the flange (5).
   (19) Remove and discard the O-ring (3) from the machined tee (1).
   (20) Put the PLUG-BLANKING in each disconnected line end.