Removal of the Air Inlet Check Valve
TASK 28-28-37-000-001-A
Removal of the Air Inlet Check Valve
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 28-28-37-860-057-A ** ON A/C NOT FOR ALL
Subtask 28-28-37-020-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:17:56 UTC
Removal of the Air Inlet Check Valve
WARNING:
OBEY THE FUEL SAFETY PROCEDURES.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 1 | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 28-00-00-910-001-A | Fuel Safety Procedures |
| TASK 28-11-27-000-001-A | Removal of the Additional Center Tank (ACT) |
| TASK 28-11-49-000-001-A | Removal of the ACT Integrated Impact Wall |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 28-28-37-860-057-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
(3) Put a WARNING NOTICE(S) in position on:
Subtask 28-28-37-010-054-A ** ON A/C NOT FOR ALL (1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
(3) Put a WARNING NOTICE(S) in position on:
- the refuel/defuel panel 801VU,
- the fuel panel 40VU,
to tell persons not to operate the refuel/defuel system.
B. Get Access
(1) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(2) Put an ACCESS PLATFORM 2M (6 FT) in position at the opening of the aft cargo-compartment.
(3) Remove the Integrated Impact Wall from the aft cargo-compartment (Ref. AMM TASK 28-11-49-000-001).
Subtask 28-28-37-010-054-B ** ON A/C NOT FOR ALL (1) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(2) Put an ACCESS PLATFORM 2M (6 FT) in position at the opening of the aft cargo-compartment.
(3) Remove the Integrated Impact Wall from the aft cargo-compartment (Ref. AMM TASK 28-11-49-000-001).
B. Get Access
(1) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(2) Put an ACCESS PLATFORM 2M (6 FT) in position at the opening of the aft cargo-compartment.
(3) For the Check Valve 177QM2, remove the Integrated Impact Wall from the aft cargo-compartment (Ref. AMM TASK 28-11-49-000-001).
(4) For the Check Valve 177QM1, remove the Additional Center Tank No.2 (ACT2) from the aft cargo-compartment (Ref. AMM TASK 28-11-27-000-001).
Subtask 28-28-37-865-058-A ** ON A/C NOT FOR ALL (1) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(2) Put an ACCESS PLATFORM 2M (6 FT) in position at the opening of the aft cargo-compartment.
(3) For the Check Valve 177QM2, remove the Integrated Impact Wall from the aft cargo-compartment (Ref. AMM TASK 28-11-49-000-001).
(4) For the Check Valve 177QM1, remove the Additional Center Tank No.2 (ACT2) from the aft cargo-compartment (Ref. AMM TASK 28-11-27-000-001).
C. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | ACT1/REFUEL & SPLY | 33QU | L29 |
| 121VU | FUEL/HI/LVL/SPLY | 1QJ | L25 |
| 121VU | FUEL/RFL/DFL/SPLY | 2QU | L24 |
| 121VU | FUEL/RFL/DFL/XFR/DEFUEL/VALVE | 1QU | L23 |
| 121VU | ACT XFR VALVE MAN CTL | 30QH | N29 |
| 121VU | ACT1/CTL & SPLY | 9QH | P29 |
| 121VU | ACT PUMP SUPPLY | 25QH | Q29 |
Subtask 28-28-37-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the Check Valve
(1) Loosen the union nut (8) and disconnect the pressure line (7) from the check valve (4).
(2) Remove the screws (6) and the washers (5) from the check valve (4).
(3) Remove the check valve (4) from the receptacle (1).
(4) Remove and discard the O-rings (2) and (3).
(5) Put the PLUG-BLANKING in each disconnected line end.
(1) Loosen the union nut (8) and disconnect the pressure line (7) from the check valve (4).
(2) Remove the screws (6) and the washers (5) from the check valve (4).
(3) Remove the check valve (4) from the receptacle (1).
(4) Remove and discard the O-rings (2) and (3).
(5) Put the PLUG-BLANKING in each disconnected line end.
Air Inlet Check Valve