Leak Test of ACT Vent/Transfer Pipe-Shrouds and Cavity Drain Lines
TASK 28-28-00-790-005-A
Leak Test of ACT Vent/Transfer Pipe-Shrouds and Cavity Drain Lines
To make sure that the ACT pipe-shrouds and cavity drain lines are in good condition before the installation of the ACT.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 28-28-00-860-186-A ** ON A/C NOT FOR ALL
Subtask 28-28-00-480-052-A ** ON A/C NOT FOR ALL
(1) After the flow test:
(a) Install a PLUG - BLANKING (4) on the open line end of the ACT1 drain-line hose (3).
(b) Make sure that all line ends of the cavity drain-line system are closed with PLUG - BLANKING before you continue with the next follow leak test.
Subtask 28-28-00-790-055-A ** ON A/C NOT FOR ALL
Subtask 28-28-00-080-052-A ** ON A/C NOT FOR ALL
(1) After the flow test:
(a) On the aft section of the ACT cavity-drain line, install a PLUG - BLANKING on line end of the hose of ACT AFT1.
(b) On the forward section of the ACT cavity-drain line, install a PLUG - BLANKING line end of the hose of ACT FWD.
(c) Make sure that all line ends of the ACT cavity-drain line system are close with PLUG - BLANKING before you continue with the next follow leak test.
Subtask 28-28-00-790-055-B ** ON A/C NOT FOR ALL
Subtask 28-28-00-080-052-E ** ON A/C NOT FOR ALL
Subtask 28-28-00-410-076-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:08:49 UTC
Leak Test of ACT Vent/Transfer Pipe-Shrouds and Cavity Drain Lines
WARNING:
OBEY THE FUEL SAFETY PROCEDURES.
1. Reason for the JobTo make sure that the ACT pipe-shrouds and cavity drain lines are in good condition before the installation of the ACT.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 1M(3 FT) |
| No specific | 2 | ADAPTER - EXTENSION, FILLING SYSTEM, DRY AIR |
| No specific | AR | AIR SOURCE 2 BAR (30 PSI) - REGULATED, FILTERED, DRY |
| No specific | 2 | CAP - BLANKING |
| No specific | AR | GAGE 5 BAR (75 PSI) - PRESSURE |
| No specific | AR | PLUG - BLANKING |
| No specific | 1 | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 3.33 and 3.0 m.daN (24.56 and 22.12 lbf.ft ) ![]() | |
| 98D28108563000 | 4 | COVER, FUEL VENT-ACT |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 134AR, 154AR, 195BB, 197AB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 28-00-00-910-001-A | Fuel Safety Procedures |
| TASK 28-11-27-000-001-A | Removal of the Additional Center Tank (ACT) |
| TASK 28-28-53-000-001-A | Removal of the ACT Transfer-Valve Actuator |
| TASK 28-28-53-400-001-A | Installation of the ACT Transfer-Valve Actuator |
| TASK 28-28-71-000-001-A | Removal of the ACT Isolation-Valve Actuator |
| TASK 28-28-71-400-001-A | Installation of the ACT Isolation-Valve Actuator |
| TASK 28-28-72-000-001-A | Removal of the ACT Vent-Valve Actuator |
| TASK 28-28-72-400-001-A | Installation of the ACT Vent-Valve Actuator |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 28-28-00-860-186-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) Open refuel/defuel panel 800VU and 801VU and make sure that:
(3) Make sure that a WARNING NOTICE(S) is(are) in position on these panels to tell persons not to operate the refuel/defuel system:
Subtask 28-28-00-010-096-A ** ON A/C NOT FOR ALL (1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) Open refuel/defuel panel 800VU and 801VU and make sure that:
- The "MODE SELECT" switch is in "OFF" position,
- All "REFUEL VALVE" switches are in the "NORM" position.
(3) Make sure that a WARNING NOTICE(S) is(are) in position on these panels to tell persons not to operate the refuel/defuel system:
- Refuel/defuel panel 800VU 801VU
- Fuel panel 40VU
- Fuel panel 28VU.
B. Get Access
(1) Open the main gear doors (Ref. AMM TASK 32-12-00-010-001) to get access:
(2) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(3) Make sure that the Additional Center Tanks (ACT)s are removed from the aft cargo-compartment (Ref. AMM TASK 28-11-27-000-001).
Subtask 28-28-00-010-096-C ** ON A/C NOT FOR ALL (1) Open the main gear doors (Ref. AMM TASK 32-12-00-010-001) to get access:
- to the ACT Transfer-Valve Actuator (6QH)
- to the ACT cavity drain-line in the Main Landing Gear (MLG) bay.
(2) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(3) Make sure that the Additional Center Tanks (ACT)s are removed from the aft cargo-compartment (Ref. AMM TASK 28-11-27-000-001).
B. Get Access
(1) Open the main gear doors (Ref. AMM TASK 32-12-00-010-001) to get access:
(2) Open access door 195BB to get access to the ACT vent-valve actuator (91QH).
(3) Open the forward and aft cargo-compartment doors (Ref. AMM TASK 52-30-00-860-001).
(4) For the ACT(s) installed on the lower fuselage, get access to the ACT cavity drain-lines below the applicable ACT(s).
4. Procedure(1) Open the main gear doors (Ref. AMM TASK 32-12-00-010-001) to get access:
- To the ACT transfer-valve actuator (6QH)
- To the ACT forward-isolation-valve actuator (92QH)
- To the ACT cavity drain-line in the Main-Landing Gear (MLG) bay.
(2) Open access door 195BB to get access to the ACT vent-valve actuator (91QH).
(3) Open the forward and aft cargo-compartment doors (Ref. AMM TASK 52-30-00-860-001).
(4) For the ACT(s) installed on the lower fuselage, get access to the ACT cavity drain-lines below the applicable ACT(s).
NOTE: Removal of the access panel(s) is only necessary if the applicable ACT(s) is(are) installed and to be tested.
(a) Remove the access panels from the lower fuselage: Subtask 28-28-00-480-052-A ** ON A/C NOT FOR ALL
A. Installation of the Test Tool
(1) Check the openings of the ACT cavity drain-line system:
(a) Make sure that the PLUG - BLANKING (4) is removed from the line-end of the hose connection (3) of ACT1.
(2) In the aft cargo-compartment, make sure that the 98D28108563000 COVER, FUEL VENT-ACT is installed on the ACT Vent/Transfer Pipe Shroud connections.
(3) Open the ACT transfer-valve:
(a) Remove the ACT transfer-valve actuator (6QH) (Ref. AMM TASK 28-28-53-000-001).
(4) On the right site of the MLG bay, install the Test Tool on the ACT cavity drain-line:
(a) Loosen the nut (5) and disconnect the elbow (7) from the T-connection.
(b) Put a CAP - BLANKING on the T-connection.
(c) Loosen the nut (6) of the aft cavity drain-line and remove the elbow (7).
(d) Connect an AIR SOURCE 2 BAR (30 PSI) - REGULATED, FILTERED, DRY and a GAGE 5 BAR (75 PSI) - PRESSURE with the applicable ADAPTER - EXTENSION, FILLING SYSTEM, DRY AIR to the cavity drain-line.
Subtask 28-28-00-790-056-A ** ON A/C NOT FOR ALL (1) Check the openings of the ACT cavity drain-line system:
(a) Make sure that the PLUG - BLANKING (4) is removed from the line-end of the hose connection (3) of ACT1.
NOTE: This line-end connection must stay open at begin of the first starting flow test.
(b) Make sure that remaining line-end connections of the ACT cavity drain-line system are closed with PLUG - BLANKING. (2) In the aft cargo-compartment, make sure that the 98D28108563000 COVER, FUEL VENT-ACT is installed on the ACT Vent/Transfer Pipe Shroud connections.
(3) Open the ACT transfer-valve:
(a) Remove the ACT transfer-valve actuator (6QH) (Ref. AMM TASK 28-28-53-000-001).
NOTE: It is sufficient, to remove temporary only the actuator, so that you can open the valve manually.
The given removal of the valve mounting flange is not necessary.
(b) Open the ACT Transfer-Valve (165QM) manually with a screwdriver. The given removal of the valve mounting flange is not necessary.
(4) On the right site of the MLG bay, install the Test Tool on the ACT cavity drain-line:
(a) Loosen the nut (5) and disconnect the elbow (7) from the T-connection.
(b) Put a CAP - BLANKING on the T-connection.
(c) Loosen the nut (6) of the aft cavity drain-line and remove the elbow (7).
(d) Connect an AIR SOURCE 2 BAR (30 PSI) - REGULATED, FILTERED, DRY and a GAGE 5 BAR (75 PSI) - PRESSURE with the applicable ADAPTER - EXTENSION, FILLING SYSTEM, DRY AIR to the cavity drain-line.
WARNING:
WHEN YOU USE COMPRESSED AIR:
B. Flow Test on the ACT cavity drain-line. - USE THE CORRECT PROTECTION (FACE SHIELD OR GOGGLES)
- DO NOT POINT THE AIRFLOW AT YOURSELF OR OTHER PERSONS.
| ACTION | RESULT |
|---|---|
In the MLG bay, at the ACT cavity drain-line connection:
| On the GPG pressure gage:
|
At the open line end of the ACT drain-line hose (3):
| At the open line end:
|
If no air comes out of the line end, or if the air-flow is too weak:
| |
In the MLG bay, at the ACT cavity drain-line connection:
| On the GPG pressure gage:
|
(a) Install a PLUG - BLANKING (4) on the open line end of the ACT1 drain-line hose (3).
(b) Make sure that all line ends of the cavity drain-line system are closed with PLUG - BLANKING before you continue with the next follow leak test.
WARNING:
WHEN YOU USE COMPRESSED AIR:
C. Leak Test of the ACT Vent/Transfer Pipe Shroud - USE THE CORRECT PROTECTION (FACE SHIELD OR GOGGLES)
- DO NOT POINT THE AIRFLOW AT YOURSELF OR OTHER PERSONS.
| ACTION | RESULT |
|---|---|
1.In the MLG bay, on the ACT cavity drain-line:
| On the ground-pressure-generator pressure gage:
|
| 2.Close the ground-pressure-generator shutoff valve. | On the ground-pressure-generator pressure gage:
|
3.If the pressure at the ACT cavity drain-line does not stay constant for 15 minutes, find leak(s):
| On the ACT vent/transfer pipe-shrouds and the ACT cavity drain-line:
NOTE: Leaks are not permitted.
|
4.In the MLG bay, on the ACT cavity drain-line:
| On the ground-pressure-generator pressure gage:
|
D. Removal of the Test Tool
(1) On the right site of the MLG bay, remove the Test Tool from the ACT cavity drain-line:
(a) Disconnect the Test Tool from the ACT cavity drain-line.
(b) Remove the PLUG-BLANKING from each disconnected line end.
(c) Clean the component interfaces and the adjacent area.
(d) Do an inspection of the component interfaces and the adjacent area.
(2) Assemble the ACT cavity drain-line:
(a) Connect the elbow (7) to the ACT cavity drain-line and tighten the nut (6).
(b) Connect the elbow (7) to the T-connection and tighten the nut (5).
(3) Close the ACT Transfer-Valve:
(a) Close the ACT Transfer-Valve (165QM) manually with a screwdriver.
(b) Install the ACT Transfer-Valve Actuator (6QH) (Ref. AMM TASK 28-28-53-400-001).
Subtask 28-28-00-480-052-E ** ON A/C NOT FOR ALL (1) On the right site of the MLG bay, remove the Test Tool from the ACT cavity drain-line:
(a) Disconnect the Test Tool from the ACT cavity drain-line.
(b) Remove the PLUG-BLANKING from each disconnected line end.
(c) Clean the component interfaces and the adjacent area.
(d) Do an inspection of the component interfaces and the adjacent area.
(2) Assemble the ACT cavity drain-line:
(a) Connect the elbow (7) to the ACT cavity drain-line and tighten the nut (6).
(b) Connect the elbow (7) to the T-connection and tighten the nut (5).
(3) Close the ACT Transfer-Valve:
(a) Close the ACT Transfer-Valve (165QM) manually with a screwdriver.
(b) Install the ACT Transfer-Valve Actuator (6QH) (Ref. AMM TASK 28-28-53-400-001).
E. Installation of the Test Tool
(1) Check the openings on the forward and aft section of ACT cavity-drain line system:
(a) On the lower fuselage, get access to the applicable cavity drain lines on the installed ACT(s):
1 Disconnect the hose (3) from the drain fitting (1).
2 Put a CAP - BLANKING on the drain fitting (1) on the ACT.
(b) On the aft section:
(2) If ACTs have been removed in the forward or aft cargo compartment, make sure that:
(a) Remove the ACT transfer-valve actuator (6QH) (Ref. AMM TASK 28-28-53-000-001).
(4) Make sure that the indication for the ACT forward-isolation-valve actuator (92QH) shows the open position.
(a) If the ACT forward-isolation valve (236QM) is closed, remove the ACT forward isolation-valve-actuator (92QH) (Ref. AMM TASK 28-28-71-000-001) and open the valve manually.
(5) In the blue hydraulic compartment, make sure that the indication for the ACT vent-valve actuator (91QH) shows the open position.
(a) If the ACT vent valve (234QM) is closed, remove the ACT vent-valve actuator (91QH) (Ref. AMM TASK 28-28-72-000-001) and open the valve manually.
(6) On the right side of the MLG bay, install the test tools on the forward and aft ACT cavity-drain line:
(b) Put a CAP - BLANKING on the T-connection.
(c) Loosen the nut (6) of the ACT cavity-drain line and remove the elbow (7).
(d) Connect an AIR SOURCE 2 BAR (30 PSI) - REGULATED, FILTERED, DRY and a GAGE 5 BAR (75 PSI) - PRESSURE with the applicable ADAPTER - EXTENSION, FILLING SYSTEM, DRY AIR on the forward and aft cavity-drain line.
Subtask 28-28-00-790-056-E ** ON A/C NOT FOR ALL (1) Check the openings on the forward and aft section of ACT cavity-drain line system:
(a) On the lower fuselage, get access to the applicable cavity drain lines on the installed ACT(s):
1 Disconnect the hose (3) from the drain fitting (1).
2 Put a CAP - BLANKING on the drain fitting (1) on the ACT.
(b) On the aft section:
- Make sure that the PLUG - BLANKING (4) is removed from the line end of the hose connection (3) of ACT AFT1.
- Make sure that the PLUG - BLANKING (4) is removed from the line end of the hose connection (3) of ACT FWD.
NOTE: These line end connections must stay open at starting of flow test.
(d) Make sure that remaining line end connections of ACT AFT2 and ACT AFT3 are closed with PLUG - BLANKING. (2) If ACTs have been removed in the forward or aft cargo compartment, make sure that:
- The 98D28108563000 COVER, FUEL VENT-ACT is installed on the ACT vent/transfer pipe-shroud-connections.
(a) Remove the ACT transfer-valve actuator (6QH) (Ref. AMM TASK 28-28-53-000-001).
NOTE: It is necessary to remove the actuator, so that you can open the valve manually.
The given procedure for removal of the valve mounting flange is not necessary.
(b) Open the ACT transfer valve (165QM) manually with a screwdriver. The given procedure for removal of the valve mounting flange is not necessary.
(4) Make sure that the indication for the ACT forward-isolation-valve actuator (92QH) shows the open position.
(a) If the ACT forward-isolation valve (236QM) is closed, remove the ACT forward isolation-valve-actuator (92QH) (Ref. AMM TASK 28-28-71-000-001) and open the valve manually.
(5) In the blue hydraulic compartment, make sure that the indication for the ACT vent-valve actuator (91QH) shows the open position.
(a) If the ACT vent valve (234QM) is closed, remove the ACT vent-valve actuator (91QH) (Ref. AMM TASK 28-28-72-000-001) and open the valve manually.
(6) On the right side of the MLG bay, install the test tools on the forward and aft ACT cavity-drain line:
NOTE: If there is only one test tool available, do the leak test of the ACT vent/transfer pipe-shroud to the aft cargo compartment first.
(a) Disconnect the ACT cavity-drain line from the T-connection. (b) Put a CAP - BLANKING on the T-connection.
(c) Loosen the nut (6) of the ACT cavity-drain line and remove the elbow (7).
(d) Connect an AIR SOURCE 2 BAR (30 PSI) - REGULATED, FILTERED, DRY and a GAGE 5 BAR (75 PSI) - PRESSURE with the applicable ADAPTER - EXTENSION, FILLING SYSTEM, DRY AIR on the forward and aft cavity-drain line.
WARNING:
WHEN YOU USE COMPRESSED AIR:
F. Flow Test on the ACT cavity-drain line. - USE THE CORRECT PROTECTION (FACE SHIELD OR GOGGLES)
- DO NOT POINT THE AIRFLOW AT YOURSELF OR OTHER PERSONS.
NOTE: This flow test is divided in two separate test work steps.
| ACTION | RESULT |
|---|---|
| Flow Test on the aft section of the ACT cavity-drain line. | |
In the MLG bay, at the aft drain line connection:
| On the GPG pressure gage:
|
At the open line end of the drain line hose (3) of ACT AFT1:
| At the open line end:
|
If no air comes out of the line end, or if the airflow is too weak:
| |
In the MLG bay, at the aft drain-line connection:
| On The GPG pressure gage:
|
| Flow test on the forward section of the ACT cavity-drain line. | |
In the MLG bay, at the forward drain-line connection:
| On the GPG pressure gage:
|
At the open line end of the drain line hose of ACT FWD:
| At the open line end:
|
If no air comes out of the line end, or if the airflow is too weak:
| |
In the MLG bay, at the forward drain-line connection:
| On the GPG pressure gage:
|
(a) On the aft section of the ACT cavity-drain line, install a PLUG - BLANKING on line end of the hose of ACT AFT1.
(b) On the forward section of the ACT cavity-drain line, install a PLUG - BLANKING line end of the hose of ACT FWD.
(c) Make sure that all line ends of the ACT cavity-drain line system are close with PLUG - BLANKING before you continue with the next follow leak test.
WARNING:
WHEN YOU USE COMPRESSED AIR:
G. Leak Test of the ACT Vent/Transfer Pipe Shroud - USE THE CORRECT PROTECTION (FACE SHIELD OR GOGGLES)
- DO NOT POINT THE AIRFLOW AT YOURSELF OR OTHER PERSONS.
NOTE: This procedure shows the leak test of the forward and aft ACT-vent/transfer pipe-shroud connections at the same time.
| ACTION | RESULT |
|---|---|
1.In the MLG bay, on the forward and aft ACT cavity drain-line:
| On the ground-pressure-generator pressure gage:
|
| 2.Close the ground-pressure-generator shutoff valve. | On the ground-pressure-generator pressure gage:
|
3.If the pressure at the ACT cavity drain-line does not stay constant for 15 minutes, find leak(s):
| On the ACT vent/transfer pipe-shrouds and the ACT cavity drain-line:
NOTE: Leaks are not permitted.
|
4.In the MLG bay, on the ACT cavity-drain line:
| On the ground-pressure-generator pressure gage:
|
H. Removal of the Test Tool
(1) On the right side of the MLG bay, disconnect the test tools from the ACT cavity-drain line:
(a) Remove the PLUG-BLANKING from each disconnected line end.
(b) Clean the component interfaces and the adjacent area.
(c) Do an inspection of the component interfaces and the adjacent area.
(d) Assemble the forward and aft ACT-cavity-drain line.
(2) Close the ACT transfer valve:
(a) Close the ACT transfer valve (165QM) manually with a screwdriver.
(b) Install the ACT transfer-valve actuator (6QH) (Ref. AMM TASK 28-28-53-400-001).
(3) If removed for the test, install the ACT forward-isolation-valve actuator (92QH) (Ref. AMM TASK 28-28-71-400-001).
(4) If removed for the test, install the ACT vent-valve actuator (91QH) (Ref. AMM TASK 28-28-72-400-001).
(5) On the lower fuselage, at the ACT cavity drains of the installed ACT(s):
(a) Remove the PLUG-BLANKING from each disconnected line end.
(b) Remove the cap blanking from the drain fitting of the ACT.
(c) Clean the component interfaces and the adjacent area.
(d) Do an inspection of the component interfaces and the adjacent area.
(e) Connect the ACT cavity-drain lines to the ACT(s).
(f) Install the hose (3) on the drain fitting (1) with the nut (2).
.
5. Close-up(1) On the right side of the MLG bay, disconnect the test tools from the ACT cavity-drain line:
(a) Remove the PLUG-BLANKING from each disconnected line end.
(b) Clean the component interfaces and the adjacent area.
(c) Do an inspection of the component interfaces and the adjacent area.
(d) Assemble the forward and aft ACT-cavity-drain line.
(2) Close the ACT transfer valve:
(a) Close the ACT transfer valve (165QM) manually with a screwdriver.
(b) Install the ACT transfer-valve actuator (6QH) (Ref. AMM TASK 28-28-53-400-001).
(3) If removed for the test, install the ACT forward-isolation-valve actuator (92QH) (Ref. AMM TASK 28-28-71-400-001).
(4) If removed for the test, install the ACT vent-valve actuator (91QH) (Ref. AMM TASK 28-28-72-400-001).
(5) On the lower fuselage, at the ACT cavity drains of the installed ACT(s):
(a) Remove the PLUG-BLANKING from each disconnected line end.
(b) Remove the cap blanking from the drain fitting of the ACT.
(c) Clean the component interfaces and the adjacent area.
(d) Do an inspection of the component interfaces and the adjacent area.
(e) Connect the ACT cavity-drain lines to the ACT(s).
(f) Install the hose (3) on the drain fitting (1) with the nut (2).
CAUTION:
MAKE SURE THAT THE FLEXIBLE HOSES ARE NOT TWISTED OR PULLED TIGHT. IF THE HOSES ARE TWISTED OR PULLED TIGHT, THE CONNECTIONS WILL BREAK AND CAUSE A LEAK.
(g) TORQUE the nut (2) to between 3.33 and 3.0 m.daN (24.56 and 22.12 lbf.ft )
. Subtask 28-28-00-410-076-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Remove the access platform(s).
(2) Close the main gear doors (Ref. AMM TASK 32-12-00-410-001).
(3) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
Subtask 28-28-00-410-076-C ** ON A/C NOT FOR ALL (1) Remove the access platform(s).
(2) Close the main gear doors (Ref. AMM TASK 32-12-00-410-001).
(3) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
A. Close Access
(1) Remove the access platform(s).
(2) Close access door 195BB.
(3) Close the main gear doors (Ref. AMM TASK 32-12-00-410-001).
(4) Close the forward and aft cargo-compartment doors (Ref. AMM TASK 52-30-00-860-002).
(5) On the lower fuselage, install the applicable access panels of the ACT cavity-drain:
Subtask 28-28-00-860-187-A ** ON A/C NOT FOR ALL (1) Remove the access platform(s).
(2) Close access door 195BB.
(3) Close the main gear doors (Ref. AMM TASK 32-12-00-410-001).
(4) Close the forward and aft cargo-compartment doors (Ref. AMM TASK 52-30-00-860-002).
(5) On the lower fuselage, install the applicable access panels of the ACT cavity-drain:
B. Put the aircraft back to its initial configuration.
(1) Remove the WARNING NOTICE(S).
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(3) Make sure that the work area is clean and clear of tools and other items.
(1) Remove the WARNING NOTICE(S).
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(3) Make sure that the work area is clean and clear of tools and other items.
ACT Cavity Drain Connection