Operational Check of ACT FWD (4.1) Overpressure Protector
TASK 28-28-00-710-802-A
Operational Check of ACT FWD (4.1) Overpressure Protector
Refer to the MPD TASK: 282800-21
OPERATIONAL CHECK OF ACT FWD (4.1) OVERPRESSURE PROTECTOR
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 28-28-00-860-237-A ** ON A/C NOT FOR ALL
Subtask 28-28-00-710-078-A ** ON A/C NOT FOR ALL
Subtask 28-28-00-410-083-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:17:54 UTC
Operational Check of ACT FWD (4.1) Overpressure Protector
WARNING:
OBEY THE FUEL SAFETY PROCEDURES.
1. Reason for the JobRefer to the MPD TASK: 282800-21
OPERATIONAL CHECK OF ACT FWD (4.1) OVERPRESSURE PROTECTOR
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | AIR SOURCE 0,3 BAR (4,38 PSI) |
| No specific | 1 | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 28-00-00-910-001-A | Fuel Safety Procedures |
Subtask 28-28-00-860-237-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) Put a WARNING NOTICE(S) in position on:
Subtask 28-28-00-010-122-A ** ON A/C NOT FOR ALL 4. Procedure(1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) Put a WARNING NOTICE(S) in position on:
- Refuel/defuel panel 800VU,
- Fuel panels 28VU and 40VU,
to tell persons not to operate the refuel/defuel system.
Subtask 28-28-00-710-078-A ** ON A/C NOT FOR ALL
A. Operational Check of ACT FWD (4.1) Overpressure Protector
(1) Install a blank cap with a test connector on the aft opening of the vent-line of ACT4.1.
(2) Connect a regulated AIR SOURCE 0,3 BAR (4,38 PSI) to the test connector.
(3) If necessary, remove the blank cap from the forward opening of the vent-line.
(4) Do this test:
5. Close-up(1) Install a blank cap with a test connector on the aft opening of the vent-line of ACT4.1.
(2) Connect a regulated AIR SOURCE 0,3 BAR (4,38 PSI) to the test connector.
(3) If necessary, remove the blank cap from the forward opening of the vent-line.
(4) Do this test:
| ACTION | RESULT |
|---|---|
1.On ACT4.1:
| |
2.On the air source:
| On the ACT:
NOTE: If air flows out of the forward opening of the vent-line, it is necessary to do the applicable repair procedure. |
3.On the air source:
| |
4.On ACT4.1:
| |
Subtask 28-28-00-410-083-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(2) Install ACT4.1 in the forward cargo compartment (Ref. AMM D/O 28-11-27-40).
Subtask 28-28-00-860-238-A ** ON A/C NOT FOR ALL (1) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(2) Install ACT4.1 in the forward cargo compartment (Ref. AMM D/O 28-11-27-40).
B. Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the WARNING NOTICE(S).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the WARNING NOTICE(S).