Operational Check of Forward ACT Isolation Valve
TASK 28-28-00-710-012-A
Operational Check of Forward ACT Isolation Valve
Refer to the MPD TASK: 282800-64
OPERATIONAL CHECK OF FORWARD ACT ISOLATION VALVE
This MPD task is applicable only when the ACT is installed.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 28-28-00-860-108-A ** ON A/C NOT FOR ALL
Subtask 28-28-00-710-065-B ** ON A/C NOT FOR ALL
Subtask 28-28-00-410-079-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:17:51 UTC
Operational Check of Forward ACT Isolation Valve
WARNING:
OBEY THE FUEL SAFETY PROCEDURES.
1. Reason for the JobRefer to the MPD TASK: 282800-64
OPERATIONAL CHECK OF FORWARD ACT ISOLATION VALVE
This MPD task is applicable only when the ACT is installed.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 1M(3 FT) |
| No specific | 1 | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 28-00-00-910-001-A | Fuel Safety Procedures |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
Subtask 28-28-00-860-108-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(3) Put the WARNING NOTICE(S) in position on:
Subtask 28-28-00-010-117-A ** ON A/C NOT FOR ALL (1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(3) Put the WARNING NOTICE(S) in position on:
- Refuel/Defuel panel 800VU
- Fueling panels 28VU and 40VU
to tell persons not to operate the refuel/defuel system.
B. Get Access
(1) Open the main gear doors for access (Ref. AMM TASK 32-12-00-010-001).
(2) Put an ACCESS PLATFORM 1M(3 FT) in position in the left main gear bay.
Subtask 28-28-00-865-083-A ** ON A/C NOT FOR ALL (1) Open the main gear doors for access (Ref. AMM TASK 32-12-00-010-001).
(2) Put an ACCESS PLATFORM 1M(3 FT) in position in the left main gear bay.
C. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AFMC SPLY | 3QN | B08 |
| 121VU | FUEL/ACT XFR VLV/MOT2 | 66QH | J18 |
| 121VU | FUEL/ACT XFR VLV/MOT1 | 65QH | J17 |
| 121VU | FUEL/AFMC/SPLY | 4QN | K19 |
| 121VU | FUEL/ACT/FUEL PUMP/SPLY | 25QH | Q29 |
| 121VU | FUEL/RFL/ON BAT | 5QN | R30 |
Subtask 28-28-00-710-065-B ** ON A/C NOT FOR ALL
A. Operational Check of Forward ACT Isolation Valve
5. Close-up| ACTION | RESULT |
|---|---|
1.In the main gear bay, on isolation valve actuator (92QH):
NOTE: Airbus recommends you to do the test on motor No.2 of the isolation valve actuator. | |
| 2.Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002). | In the main gear bay, on the isolation valve actuator:
|
3.In the cockpit, on ACT control panel 28VU, make sure that:
| |
4.In the cockpit, set the Auxiliary Fuel Management Computer (AFMC):
| |
5.After a minimum of 10 seconds:
| In the main gear bay, on the isolation valve actuator:
|
| 6.De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002). 7.In the main gear bay, on the isolation valve actuator:
NOTE: Airbus recommends you to do the test on motor No.1 of the isolation valve actuator. 8.Energize the aircraft electrical circuits(Ref. AMM TASK 24-41-00-861-002). | |
| 9.Do steps 3., 4. and 5. again. | In the main gear bay, on the isolation valve actuator:
|
| 10.De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002). 11.In the main gear bay, on the isolation valve actuator:
| |
Subtask 28-28-00-410-079-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(3) Close the main gear doors after access (Ref. AMM TASK 32-12-00-410-001).
Subtask 28-28-00-860-109-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(3) Close the main gear doors after access (Ref. AMM TASK 32-12-00-410-001).
B. Put the aircraft back to its initial configuration.
(1) Remove the WARNING NOTICE(S).
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Remove the WARNING NOTICE(S).
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.