Operational Test of the Additional Center Tank (ACT) Automatic Transfer System
TASK 28-28-00-710-005-A
Operational Test of the Additional Center Tank (ACT) Automatic Transfer System
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 28-28-00-860-087-B ** ON A/C NOT FOR ALL
Subtask 28-28-00-860-088-B ** ON A/C NOT FOR ALL
(1) Do the functional (BITE) test (Ref. AMM TASK 28-46-00-740-001) and the status report (BITE) (Ref. AMM TASK 28-42-00-740-001) to do the check of the correct function of the FQIC after the computer reset.
Subtask 28-28-00-080-057-A ** ON A/C NOT FOR ALL
Subtask 28-28-00-865-195-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:17:50 UTC
Operational Test of the Additional Center Tank (ACT) Automatic Transfer System
WARNING:
OBEY THE FUEL SAFETY PROCEDURES.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | AIR SOURCE 2 BAR (30 PSI) - REGULATED, FILTERED, DRY |
| No specific | 1 | GAGE 5 BAR (75 PSI) - PRESSURE |
| No specific | AR | ROD - NON METALLIC |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 1 | STEPLADDER 2.0 M (6.6 FT) |
| 98D28108658000 | 1 | TOOL-PRESSURE TEST,ACT |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 150 | AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT |
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| 151NC, 826 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-55-11-000-002-A | Removal of the Ceiling Panels in the Aft Cargo-Compartment - FR47/FR59 |
| TASK 25-55-11-400-002-A | Installation of the Ceiling Panels in the Aft Cargo-Compartment - FR47/FR59 |
| TASK 28-00-00-910-001-A | Fuel Safety Procedures |
| TASK 28-42-00-740-001-A | Status Report (BITE) |
| TASK 28-46-00-710-002-A | Test of the Additional Center Tank (ACT) High-Level-Sensing System |
| TASK 28-46-00-740-001-A | Functional (BITE) Test |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 32-00-00-860-001-A | Flight Configuration Precautions with Electrical Power |
| TASK 32-00-00-860-001-A-01 | Flight Configuration Precautions without Electrical Power |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
| TASK 32-22-00-010-001-A | Nose Gear Doors - Ground Doors Opening |
| TASK 32-22-00-410-001-A | Nose Gear Doors - Ground Doors Closing |
| TASK 32-69-00-860-802-A | Simulation of Flight with False Targets (With Aircraft on Ground) |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 28-28-00-860-087-B ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) Prepare to start with an isolated task, the simulation of flight (with aircraft on ground) (Ref. AMM TASK 32-69-00-860-802).
(3) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(4) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(5) In the cockpit, on the ECAM control panel:
(a) Push the FUEL pushbutton switch.
(6) In the cockpit, on the lower ECAM Display Unit (DU):
(a) The FUEL page comes into view.
(b) Make sure that the fuel quantity:
(a) Make sure that these pushbutton switches are in the OFF position:
(8) In the cockpit, on the ECAM panel:
(a) Make sure that the fuel quantity in each installed ACT is 400 kg (882 lb).
(9) In the cockpit, on ACT control-panel 28VU:
(a) Make sure that the ACT XFR rotary switch is in the OFF position.
(b) Make sure that the FWD ACT OVRD pushbutton switch is released.
(c) Make sure that the FWD ACT FAULT indication is OFF.
(d) Make sure that the MAN light in the MODE SEL pushbutton switch is OFF.
(10) Do the high-level sensing test (Ref. AMM TASK 28-46-00-710-002).
(11) Open aft cargo-compartment-door 826 (Ref. AMM TASK 52-30-00-860-001).
(12) Open the Main Landing Gear (MLG) doors (Ref. AMM TASK 32-12-00-010-001).
(13) Open the Nose Landing Gear (NLG) doors (Ref. AMM TASK 32-22-00-010-001).
Subtask 28-28-00-865-074-A ** ON A/C NOT FOR ALL (1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) Prepare to start with an isolated task, the simulation of flight (with aircraft on ground) (Ref. AMM TASK 32-69-00-860-802).
(3) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(4) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(5) In the cockpit, on the ECAM control panel:
(a) Push the FUEL pushbutton switch.
(6) In the cockpit, on the lower ECAM Display Unit (DU):
(a) The FUEL page comes into view.
(b) Make sure that the fuel quantity:
- In the center tank is 4300 kg (9480 lb)
- In the wing tanks is full.
NOTE: When you have all the necessary fuel quantities for the test:
(7) In the cockpit, on fuel control-panel 40VU: - On the ECAM display, the message FUEL ACT XFR FAULT comes into view
- The ACT XFR mode pushbutton-fault-light illuminates on overhead panel 28VU.
(a) Make sure that these pushbutton switches are in the OFF position:
- L TK PUMP 1
- L TK PUMP 2
- R TK PUMP 1
- R TK PUMP 2
- CTR TK L XFR
- CTR TK R XFR.
(8) In the cockpit, on the ECAM panel:
(a) Make sure that the fuel quantity in each installed ACT is 400 kg (882 lb).
(9) In the cockpit, on ACT control-panel 28VU:
(a) Make sure that the ACT XFR rotary switch is in the OFF position.
(b) Make sure that the FWD ACT OVRD pushbutton switch is released.
(c) Make sure that the FWD ACT FAULT indication is OFF.
(d) Make sure that the MAN light in the MODE SEL pushbutton switch is OFF.
(10) Do the high-level sensing test (Ref. AMM TASK 28-46-00-710-002).
(11) Open aft cargo-compartment-door 826 (Ref. AMM TASK 52-30-00-860-001).
(12) Open the Main Landing Gear (MLG) doors (Ref. AMM TASK 32-12-00-010-001).
(13) Open the Nose Landing Gear (NLG) doors (Ref. AMM TASK 32-22-00-010-001).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 28-28-00-865-078-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FUEL/FQI/CHAN/1 | 1QT | A13 |
| 49VU | ALSCU SPLY | 66QJ | B10 |
| 49VU | AFMC SPLY | 3QN | B08 |
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| 121VU | FUEL/ACT AIR SOV/MAN/SPLY | 64QH | J20 |
| 121VU | FUEL/ACT AIR SOV/AUTO/SPLY | 63QH | J19 |
| 121VU | FUEL/ACT XFR VLV/MOT2 | 66QH | J18 |
| 121VU | FUEL/ACT XFR VLV/MOT1 | 65QH | J17 |
| 121VU | FUEL/ALSCU/HI LEVEL/SPLY | 64QJ | K21 |
| 121VU | FUEL/ALSCU/SPLY | 65QJ | K20 |
| 121VU | FUEL/AFMC/SPLY | 4QN | K19 |
| 121VU | FUEL/INLET VLV MOT2 AUTO SP AFT 2 | 44QH2 | K16 |
| 121VU | FUEL/INLET VLV MOT2 AUTO SP AFT 1 | 44QH1 | K15 |
| 121VU | FUEL/INLET VLV/MOT1/AFT 2 | 84QH | L29 |
| 121VU | FUEL/INLET VLV/MOT1/MAN SPLY/AFT 1 | 46QH | L28 |
| 121VU | FUEL/FQI/CHANNEL/1 AND 2 | 8QT | L25 |
| 121VU | FUEL/HI/LVL/SPLY | 1QJ | L24 |
| 121VU | FUEL/ACT VENT VLV/MAN/SPLY | 62QH | L21 |
| 121VU | FUEL/ACT VENT VLV/AUTO/SPLY | 61QH | L20 |
| 121VU | FUEL/INLET VLV MAN CTL SPLY AFT 2 | 81QH | L16 |
| 121VU | FUEL/INLET VLV MAN CTL SPLY AFT 1 | 45QH | L15 |
| 121VU | FUEL/FQI/CHAN/2 | 2QT | M27 |
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
C. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/ACT/FUEL PUMP/SPLY | 25QH | Q29 |
Subtask 28-28-00-860-088-B ** ON A/C NOT FOR ALL
A. Preparation for the Test
Test Tool Arrangement ACT ** ON A/C NOT FOR ALL
Access to Test Ports T1 and T2 ** ON A/C NOT FOR ALL
(1) In the aft cargo compartment, remove ceiling panel 151NC to get access to the test ports of the ACT pressurization system (Ref. AMM TASK 25-55-11-000-002).
(2) Connect a AIR SOURCE 2 BAR (30 PSI) - REGULATED, FILTERED, DRY maximum pressure to test port T1.
(3) Connect a GAGE 5 BAR (75 PSI) - PRESSURE maximum to test port T2.
(5) Do the flight-configuration precaution procedure (Ref. AMM TASK 32-00-00-860-001).
Subtask 28-28-00-710-058-C ** ON A/C NOT FOR ALL
Test Tool Arrangement ACT ** ON A/C NOT FOR ALL
Access to Test Ports T1 and T2 ** ON A/C NOT FOR ALL (2) Connect a AIR SOURCE 2 BAR (30 PSI) - REGULATED, FILTERED, DRY maximum pressure to test port T1.
(3) Connect a GAGE 5 BAR (75 PSI) - PRESSURE maximum to test port T2.
NOTE: You can use 98D28108658000 TOOL-PRESSURE TEST,ACT as an alternative tool and connect it to test ports T1 and T2.
(4) On the refuel/defuel control-panel 800/801VU, make sure that the access door of the panel is closed. (5) Do the flight-configuration precaution procedure (Ref. AMM TASK 32-00-00-860-001).
WARNING:
WHEN YOU USE COMPRESSED AIR:
B. Test - USE THE CORRECT PROTECTION (FACE SHIELD OR GOGGLES)
- DO NOT POINT THE AIRFLOW AT YOURSELF OR OTHER PERSONS.
NOTE: Airbus recommends you to keep the fuel transfer rate of approximately 74 -10 kg.min or +10 kg.min (163 -22 lb.min or +22 lb.min), with an ACT pressurization of 450 mbar (6.53 psi) and an aircraft pitch of 2 deg (2 deg).
The highest fuel transfer rate, with a maximum positive gravity-head, is calculated from these parameters:
The highest fuel transfer rate, with a maximum positive gravity-head, is calculated from these parameters:
- A temperature of approximately 40 DEG.C (104 DEG.F)
- The fuel quantity in ACT(s) is 2992 l (790 USgal)
- The center tank is almost empty.
- A temperature of approximately -40 DEG.C (-40 DEG.F)
- The ACT(s) is (are) almost empty
- The fuel quantity in the center tank is 8250 l (2179 USgal).
| ACTION | RESULT |
|---|---|
1.On the ground pressure generator:
| On the pressure gauge at test port T1:
|
WARNING:
DO NOT PUT YOUR FINGERS IN THE UPLOCK MECHANISM. THIS IS DANGEROUS. Use a ROD - NON METALLIC (or an equivalent tool) to move the right MLG uplock hook to the closed and locked position. | |
| 3.Record the time when the aircraft is in the simulated flight mode. | |
| 4.Set the aircraft to the simulated flight mode while you do the test of the automatic transfer system (Ref. AMM TASK 32-69-00-860-802). NOTE: Transfer starts after 30 minutes due to time relay 113QH. | On the pressure gauge at test port T2:
NOTE: It is necessary to wait for some minutes to get the necessary air pressure at test port T2. On the FUEL page of the lower ECAM-system DU:
NOTE: The FUEL indication on the DU shows no data when the aircraft is in the simulated flight mode while you do this test. |
| 5.If XXXX comes into view as an alternative to numbers on ECAM fuel page: Do a reset of the Fuel Quantity Indication Computer (FQIC). Open and close these circuit breakers at the same time:
| |
| 6.Look at the FUEL page of the lower ECAM-system DU. | On the FUEL page of the lower ECAM-system DU:
NOTE: The automatic fuel transfer from the ACT(s) to the center tank starts in a sequence. When the first ACT is empty of fuel, then the fuel transfer goes on with the adjacent ACT(s). NOTE: If the aircraft has ACT fuel-flow-sequence configuration B, then all the fuel will be removed from the ACT(s) by the flow sequence:
|
7.On panel 110VU:
NOTE: You can use a STEPLADDER 2.0 M (6.6 FT) to get the access of uplock hooks.
| |
| 8.Stop the isolated task related to the simulation of flight (with aircraft on ground) (Ref. AMM TASK 32-69-00-860-802). | |
9.On the ground pressure generator:
| On the pressure gauges at test ports T1 and T2:
|
(1) Do the functional (BITE) test (Ref. AMM TASK 28-46-00-740-001) and the status report (BITE) (Ref. AMM TASK 28-42-00-740-001) to do the check of the correct function of the FQIC after the computer reset.
C. Removal of the Tool
(1) Disconnect and remove the AIR SOURCE 2 BAR (30 PSI) - REGULATED, FILTERED, DRY pressure maximum from test port T1.
(2) Disconnect and remove the GAGE 5 BAR (75 PSI) - PRESSURE pressure maximum from test port T2.
(3) If connected, disconnect and remove the 98D28108658000 TOOL-PRESSURE TEST,ACT from test port T1 and T2.
5. Close-up(1) Disconnect and remove the AIR SOURCE 2 BAR (30 PSI) - REGULATED, FILTERED, DRY pressure maximum from test port T1.
(2) Disconnect and remove the GAGE 5 BAR (75 PSI) - PRESSURE pressure maximum from test port T2.
(3) If connected, disconnect and remove the 98D28108658000 TOOL-PRESSURE TEST,ACT from test port T1 and T2.
Subtask 28-28-00-865-195-A ** ON A/C NOT FOR ALL
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 28-28-00-860-094-B ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/ACT/FUEL PUMP/SPLY | 25QH | Q29 |
B. Put the aircraft back to its initial configuration.
(1) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install ceiling panel 151NC (Ref. AMM TASK 25-55-11-400-002).
(4) Close the aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
(5) Close the NLG doors (Ref. AMM TASK 32-22-00-410-001).
(6) Close the MLG doors (Ref. AMM TASK 32-12-00-410-001).
(7) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(8) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install ceiling panel 151NC (Ref. AMM TASK 25-55-11-400-002).
(4) Close the aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
(5) Close the NLG doors (Ref. AMM TASK 32-22-00-410-001).
(6) Close the MLG doors (Ref. AMM TASK 32-12-00-410-001).
(7) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(8) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).