Special Detailed Inspection (HFEC) of Additional Center Tank (ACT), External Surface, in Area of Tankplate Profiles
TASK 28-28-00-200-008-A
Special Detailed Inspection (HFEC) of Additional Center Tank (ACT), External Surface, in Area of Tankplate Profiles
Refer to the MPD TASK: 282803-01
SPECIAL DETAILED INSPECTION (HFEC) OF ADDITIONAL CENTER TANK (ACT), EXTERNAL SURFACE, IN AREA OF TANKPLATE PROFILES
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 28-28-00-860-158-A ** ON A/C NOT FOR ALL
Subtask 28-28-00-750-051-A ** ON A/C NOT FOR ALL
Subtask 28-28-00-410-073-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:17:55 UTC
Special Detailed Inspection (HFEC) of Additional Center Tank (ACT), External Surface, in Area of Tankplate Profiles
WARNING:
OBEY THE FUEL SAFETY PROCEDURES.
1. Reason for the JobRefer to the MPD TASK: 282803-01
SPECIAL DETAILED INSPECTION (HFEC) OF ADDITIONAL CENTER TANK (ACT), EXTERNAL SURFACE, IN AREA OF TANKPLATE PROFILES
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 28-00-00-910-001-A | Fuel Safety Procedures |
| TASK 28-11-27-000-001-A | Removal of the Additional Center Tank (ACT) |
| TASK 28-11-27-000-002-A | Removal of Additional Center Tank No.1 (ACT AFT1) |
| TASK 28-11-27-000-003-A | Removal of the Additional Center Tank No.2 (ACT AFT2) |
| TASK 28-11-27-400-001-A | Installation of the Additional Center Tank (ACT) |
| TASK 28-11-27-400-002-A | Installation of Additional Center Tank No.1 (ACT AFT1) |
| TASK 28-11-27-400-003-A | Installation of the Additional Center Tank No.2 (ACT AFT2) |
| TASK 28-11-49-000-001-A | Removal of the ACT Integrated Impact Wall |
| TASK 28-11-49-400-001-A | Installation of the ACT Integrated Impact Wall |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| NTM 282803 | |
Subtask 28-28-00-860-158-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
(3) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(4) Put an ACCESS PLATFORM 2M (6 FT) in position at the opening of the aft cargo-compartment door.
Subtask 28-28-00-010-082-A ** ON A/C NOT FOR ALL (1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
(3) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(4) Put an ACCESS PLATFORM 2M (6 FT) in position at the opening of the aft cargo-compartment door.
B. Get Access
(1) Remove the integrated impact wall from the ACT (Ref. AMM TASK 28-11-49-000-001).
(2) Remove the applicable ACT from the aft cargo compartment (Ref. AMM TASK 28-11-27-000-001).
Subtask 28-28-00-010-137-B ** ON A/C NOT FOR ALL (1) Remove the integrated impact wall from the ACT (Ref. AMM TASK 28-11-49-000-001).
(2) Remove the applicable ACT from the aft cargo compartment (Ref. AMM TASK 28-11-27-000-001).
C. Get Access
(1) Remove the applicable ACT(s) from the aft cargo compartment:
(a) Remove ACT AFT 2 (Ref. AMM TASK 28-11-27-000-003).
(b) Remove ACT AFT1 (Ref. AMM TASK 28-11-27-000-002).
4. Procedure(1) Remove the applicable ACT(s) from the aft cargo compartment:
(a) Remove ACT AFT 2 (Ref. AMM TASK 28-11-27-000-003).
(b) Remove ACT AFT1 (Ref. AMM TASK 28-11-27-000-002).
Subtask 28-28-00-750-051-A ** ON A/C NOT FOR ALL
A. Inspection
(1) Do the special detailed inspection of the ACT external surface, in area of tank plate profiles, refer to NTM 282803.
5. Close-up(1) Do the special detailed inspection of the ACT external surface, in area of tank plate profiles, refer to NTM 282803.
Subtask 28-28-00-410-073-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Install the ACT in the aft cargo compartment (Ref. AMM TASK 28-11-27-400-001).
(2) Install the integrated impact wall (Ref. AMM TASK 28-11-49-400-001).
Subtask 28-28-00-410-101-B ** ON A/C NOT FOR ALL (1) Install the ACT in the aft cargo compartment (Ref. AMM TASK 28-11-27-400-001).
(2) Install the integrated impact wall (Ref. AMM TASK 28-11-49-400-001).
B. Close Access
(1) Install the applicable ACT(s) in the aft cargo compartment:
(a) Install ACT AFT1 (Ref. AMM TASK 28-11-27-400-002).
(b) Install ACT AFT2 (Ref. AMM TASK 28-11-27-400-003).
Subtask 28-28-00-860-159-A ** ON A/C NOT FOR ALL (1) Install the applicable ACT(s) in the aft cargo compartment:
(a) Install ACT AFT1 (Ref. AMM TASK 28-11-27-400-002).
(b) Install ACT AFT2 (Ref. AMM TASK 28-11-27-400-003).
C. Put the aircraft back to the serviceable condition.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(3) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(4) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(3) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(4) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
ACT External Surface Tankplate Profiles