Installation of the Center Tank Jet Pump
TASK 28-26-41-400-001-A
Installation of the Center Tank Jet Pump
Self Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 28-26-41-941-052-A ** ON A/C NOT FOR ALL
Subtask 28-26-41-420-051-A ** ON A/C NOT FOR ALL
Subtask 28-26-41-942-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:17:45 UTC
Installation of the Center Tank Jet Pump
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
WARNING:
MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
1. Reason for the JobSelf Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | SAFETY BARRIER(S) |
| No specific | AR | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.01ABA1) | Turbine Fuel-- Kerosene - |
| (Material No.03FAB1) | Mineral Oil base Grease-- Vaseline or Petrolatum - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [157QM] (JET PUMP-L, CENTER TANK) | |
| 147AZ | |
| FOR [158QM] (JET PUMP-R, CENTER TANK) | |
| 148AZ | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 2 | O-RING | AIPC 28-26-05-04-040 |
| 13 | O-RING | AIPC 28-26-05-04-120 |
| 2 | O-RING | AIPC 28-26-85-04-030 |
| 13 | O-RING | AIPC 28-26-85-04-110 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-11-28-650-003-A | Pressure Refuel with Automatic Control |
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 28-10-00-910-001-A | Safety Procedures When You Do Work in a Fuel Tank |
| TASK 28-10-00-910-002-A | Access to the Fuel Tanks and the Work Areas |
| TASK 28-25-00-650-001-A | Pressure Defuel |
| TASK 28-25-00-650-003-A | To Drain Remaining Fuel from the Wing Tanks and the Center Tank |
| TASK 28-25-00-650-003-A-01 | To Drain Remaining Fuel from the Wing Tanks and the Center Tank |
| TASK 28-25-00-869-001-A | Fuel Transfer |
| TASK 28-26-00-710-001-A | Operational Test of the Main Transfer System |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
| TASK 57-17-11-000-001-A | Removal of Access Cover 147AZ(148AZ) |
| TASK 57-17-11-000-001-B | Removal of Access Cover 148AZ or/and the ACT-Equipment Support Door |
| TASK 57-17-11-400-001-A | Installation of Access Cover 147AZ(148AZ) |
| TASK 57-17-11-400-001-B | Installation of Access Cover 148AZ or/and the ACT-Equipment Support-Door |
Subtask 28-26-41-941-052-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(2) Make sure that the SAFETY BARRIER(S) are in position.
(3) Make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the MLG doors.
Subtask 28-26-41-860-050-A ** ON A/C NOT FOR ALL WARNING:
BEFORE YOU DO WORK IN OR NEAR A FUEL TANK, MAKE SURE THAT YOU OBEY ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT.
(1) You must obey the fuel safety procedures when you do work in a fuel tank (Ref. AMM TASK 28-10-00-910-001). (2) Make sure that the SAFETY BARRIER(S) are in position.
(3) Make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the MLG doors.
B. Aircraft Maintenance Configuration
(1) Make sure that the center tank is defueled (Ref. AMM TASK 28-25-00-650-001).
(2) Make sure that the remaining fuel has been drained from the center tank (Ref. AMM TASK 28-25-00-650-003).
(3) Make sure that the applicable MLG door is open (Ref. AMM TASK 32-12-00-010-001).
(4) Make sure that the 460005835 SLEEVE - GROUND LOCK is installed on the applicable MLG door actuating-cylinder.
(5) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is below the applicable access panel 147AZ (148AZ).
(6) Make sure that the applicable access panel 147AZ (148AZ) is removed (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-17-11-000-001).
Subtask 28-26-41-860-050-B ** ON A/C NOT FOR ALL (1) Make sure that the center tank is defueled (Ref. AMM TASK 28-25-00-650-001).
(2) Make sure that the remaining fuel has been drained from the center tank (Ref. AMM TASK 28-25-00-650-003).
(3) Make sure that the applicable MLG door is open (Ref. AMM TASK 32-12-00-010-001).
(4) Make sure that the 460005835 SLEEVE - GROUND LOCK is installed on the applicable MLG door actuating-cylinder.
(5) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is below the applicable access panel 147AZ (148AZ).
(6) Make sure that the applicable access panel 147AZ (148AZ) is removed (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-17-11-000-001).
B. Aircraft Maintenance Configuration
(1) Make sure that the center tank is defueled (Ref. AMM TASK 28-25-00-650-001).
(2) Make sure that the remaining fuel has been drained from the center tank (Ref. AMM TASK 28-25-00-650-003).
(3) Make sure that the applicable MLG door is open (Ref. AMM TASK 32-12-00-010-001).
(4) Make sure that the 460005835 SLEEVE - GROUND LOCK is installed on the applicable MLG door actuating-cylinder.
(5) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is below the ACT-Equipment Support Door or access panel 148AZ.
(6) Make sure that the ACT-Equipment Support Door or access panel 148AZ is removed (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-17-11-000-001).
Subtask 28-26-41-865-052-A ** ON A/C NOT FOR ALL (1) Make sure that the center tank is defueled (Ref. AMM TASK 28-25-00-650-001).
(2) Make sure that the remaining fuel has been drained from the center tank (Ref. AMM TASK 28-25-00-650-003).
(3) Make sure that the applicable MLG door is open (Ref. AMM TASK 32-12-00-010-001).
(4) Make sure that the 460005835 SLEEVE - GROUND LOCK is installed on the applicable MLG door actuating-cylinder.
(5) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is below the ACT-Equipment Support Door or access panel 148AZ.
(6) Make sure that the ACT-Equipment Support Door or access panel 148AZ is removed (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-17-11-000-001).
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/CTR TK/AUTO/CTL | 3QL | R27 |
| 121VU | FUEL/CTR TK/L&R XFR/CTL & IND | 2QL | R26 |
| 121VU | FUEL/CTR TK/L&R XFR/CTL & IND | 1QL | R25 |
Subtask 28-26-41-420-051-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
(1) Clean the component interfaces and the adjacent areas with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 28-26-41-420-050-A ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent areas with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
B. Installation of the Center Tank Jet Pump 157QM (158QM)
(1) Remove the blanking caps from the jet pump (1).
(2) Install the jet pump (1) with the washers (9) and the bolts (8).
(3) Remove the blanking cap from the pipe (4).
(4) Lubricate the new AIPC 28-26-05-04-040 O-RING (2) or AIPC 28-26-85-04-030 O-RING (2) with Turbine Fuel-- Kerosene - (Material No.01ABA1) or Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) .
(5) Install the new O-ring (2) on the pipe (4).
(6) Install the pipe (4) into the jet pump (1).
(7) Tighten the nut (3).
(8) Remove the blanking cap from the pipe (16).
(9) Put the nut (14) on the jet pump (1).
(10) Install the retaining ring (15) on the jet pump (1).
(11) Lubricate the new AIPC 28-26-05-04-120 O-RING (13) or AIPC 28-26-85-04-110 O-RING (13) with Turbine Fuel-- Kerosene - (Material No.01ABA1) or Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) .
(12) Install the new O-ring (13) on the jet pump (1).
(13) Install the pipe (16) onto the jet pump (1).
(14) Tighten the nut (14).
(15) Install the bonding lead (6) with the bolt (5) and the nut (7) (Ref. AMM TASK 20-28-00-912-802).
(16) Install the bonding lead (10) with the bolt (11) and the nut (12) (Ref. AMM TASK 20-28-00-912-802).
Subtask 28-26-41-410-050-A ** ON A/C NOT FOR ALL (1) Remove the blanking caps from the jet pump (1).
(2) Install the jet pump (1) with the washers (9) and the bolts (8).
(3) Remove the blanking cap from the pipe (4).
(4) Lubricate the new AIPC 28-26-05-04-040 O-RING (2) or AIPC 28-26-85-04-030 O-RING (2) with Turbine Fuel-- Kerosene - (Material No.01ABA1) or Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) .
(5) Install the new O-ring (2) on the pipe (4).
(6) Install the pipe (4) into the jet pump (1).
(7) Tighten the nut (3).
(8) Remove the blanking cap from the pipe (16).
(9) Put the nut (14) on the jet pump (1).
(10) Install the retaining ring (15) on the jet pump (1).
(11) Lubricate the new AIPC 28-26-05-04-120 O-RING (13) or AIPC 28-26-85-04-110 O-RING (13) with Turbine Fuel-- Kerosene - (Material No.01ABA1) or Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) .
(12) Install the new O-ring (13) on the jet pump (1).
(13) Install the pipe (16) onto the jet pump (1).
(14) Tighten the nut (14).
(15) Install the bonding lead (6) with the bolt (5) and the nut (7) (Ref. AMM TASK 20-28-00-912-802).
(16) Install the bonding lead (10) with the bolt (11) and the nut (12) (Ref. AMM TASK 20-28-00-912-802).
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the applicable access panel (Ref. AMM TASK 57-17-11-400-001):
(a) FOR [157QM] (JET PUMP-L, CENTER TANK)
install 147AZ
(b) FOR [158QM] (JET PUMP-R, CENTER TANK)
install 148AZ.
(3) Remove the access platform(s).
(4) Close the applicable MLG door (Ref. AMM TASK 32-12-00-410-001).
Subtask 28-26-41-410-050-B ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the applicable access panel (Ref. AMM TASK 57-17-11-400-001):
(a) FOR [157QM] (JET PUMP-L, CENTER TANK)
install 147AZ
(b) FOR [158QM] (JET PUMP-R, CENTER TANK)
install 148AZ.
(3) Remove the access platform(s).
(4) Close the applicable MLG door (Ref. AMM TASK 32-12-00-410-001).
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the applicable access panel (Ref. AMM TASK 57-17-11-400-001):
(a) FOR [157QM] (JET PUMP-L, CENTER TANK)
install the ACT-Equipment Support Door
(b) FOR [158QM] (JET PUMP-R, CENTER TANK)
install 148AZ.
(3) Remove the access platform(s).
(4) Close the applicable MLG door (Ref. AMM TASK 32-12-00-410-001).
Subtask 28-26-41-865-053-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the applicable access panel (Ref. AMM TASK 57-17-11-400-001):
(a) FOR [157QM] (JET PUMP-L, CENTER TANK)
install the ACT-Equipment Support Door
(b) FOR [158QM] (JET PUMP-R, CENTER TANK)
install 148AZ.
(3) Remove the access platform(s).
(4) Close the applicable MLG door (Ref. AMM TASK 32-12-00-410-001).
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 28-26-41-710-050-A ** ON A/C NOT FOR ALL Subtask 28-26-41-650-052-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/CTR TK/AUTO/CTL | 3QL | R27 |
| 121VU | FUEL/CTR TK/L&R XFR/CTL & IND | 2QL | R26 |
| 121VU | FUEL/CTR TK/L&R XFR/CTL & IND | 1QL | R25 |
F. Fuel Configuration
(1) Refuel, defuel or transfer fuel as necessary (Ref. AMM TASK 12-11-28-650-003), (Ref. AMM TASK 28-25-00-650-001) or (Ref. AMM TASK 28-25-00-869-001).
5. Close-up(1) Refuel, defuel or transfer fuel as necessary (Ref. AMM TASK 12-11-28-650-003), (Ref. AMM TASK 28-25-00-650-001) or (Ref. AMM TASK 28-25-00-869-001).
Subtask 28-26-41-942-050-A ** ON A/C NOT FOR ALL
A. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the WARNING NOTICE(S).
(3) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Remove the safety barriers.
(2) Remove the WARNING NOTICE(S).
(3) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Center Tank Jet Pump 157 QM (158 QM)