W DOC AIRBUS | AMM A320F

Manually Operate the Transfer System Discharge Check Valve on RIB1 and Check For Full and Free Movement


TASK 28-26-00-210-001-A
Manually Operate the Transfer System Discharge Check Valve on RIB1 and Check For Full and Free Movement


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
ZONE: 540
ZONE: 640
1. Reason for the Job
Refer to the MPD TASK: 282600-01
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
No specific
AR
SAFETY BARRIER(S)
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
98D57004014000
2
HOOK-COVER (RIB2-SURGE DOORS)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
540
FUEL TANK
640
FUEL TANK
540AB, 540BZ, 640AB, 640BZ
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 12-11-28-650-003-A
Pressure Refuel with Automatic Control
TASK 28-00-00-000-001-A
Removal of the Fuel Pipes
TASK 28-00-00-400-001-A
Installation of the Fuel Pipes
TASK 28-10-00-910-001-A
Safety Procedures When You Do Work in a Fuel Tank
TASK 28-10-00-910-002-A
Access to the Fuel Tanks and the Work Areas
TASK 28-25-00-650-001-A
Pressure Defuel
TASK 28-25-00-650-003-A
To Drain Remaining Fuel from the Wing Tanks and the Center Tank
TASK 28-25-00-650-003-A-01
To Drain Remaining Fuel from the Wing Tanks and the Center Tank
TASK 28-25-00-869-001-A
Fuel Transfer
TASK 28-42-15-000-005-A
Removal of the Wing Tank Fuel-Quantity Probes
TASK 28-42-15-400-005-A
Installation of the Fuel-Quantity-Probes
TASK 57-27-11-000-001-A
Removal of the Access Panel
TASK 57-27-11-400-001-A
Installation of the Access Panel
TASK 28-26-44-000-001-A
Removal of the Main-Transfer-System Clack Valve (for corrective action)
TASK 28-26-44-400-001-A
Installation of the Main-Transfer-System Clack Valve (for corrective action)
3. Job Set-up
Subtask 28-26-00-941-050-A ** ON A/C NOT FOR ALL
A. Safety Precautions
WARNING: OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK.
   (1) You must obey the fuel safety procedures (Ref. AMM TASK 28-10-00-910-001) when you do work in a fuel tank.
   (2) Put the SAFETY BARRIER(S) in position.
Subtask 28-26-00-650-052-A ** ON A/C NOT FOR ALL
B. Fuel Configuration
   (1) Defuel the applicable wing tank and the center tank (Ref. AMM TASK 28-25-00-650-001).
   (2) Drain the remaining fuel from the applicable wing tank (Ref. AMM TASK 28-25-00-650-003).
Subtask 28-26-00-865-051-A ** ON A/C NOT FOR ALL
C. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUFUEL/L WING TK/PUMP2 SPLY7QAN26
121VUFUEL/L WING TK/PUMP1 SPLY1QAN23
121VUFUEL/R WING TK/PUMP2 SPLY8QAQ26
121VUFUEL/R WING TK/PUMP1 SPLY2QAQ23
121VUFUEL/CTR TK/L&R XFR/CTL & IND2QLR26
121VUFUEL/CTR TK/L&R XFR/CTL & IND1QLR25
123VUL WING TK/PUMP 1/STBY SPLY11QAAD12
123VUR WING TK/PUMP 1/STBY SPLY12QAAE12
Subtask 28-26-00-010-050-A ** ON A/C NOT FOR ALL
D. Get Access
   (1) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE below the applicable access panel 540AB(640AB).
   (2) Remove the applicable access panels 540AB 640AB (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-27-11-000-001).
   (3) Safety open the applicable spring-loaded surge-door 540BZ 640BZ with the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS).
   (4) If necessary, remove the applicable Fuel Quantity Indicating (FQI) probe 54QT1(54QT2) (Ref. AMM TASK 28-42-15-000-005):
   (5) Remove the fuel pipes, as necessary, to get access to the applicable discharge check valve (Ref. AMM TASK 28-00-00-000-001).
4. Procedure
Subtask 28-26-00-210-050-A ** ON A/C NOT FOR ALL
A. Inspection of the Transfer-System Discharge-Check-Valve
   (1) Manually operate the transfer-system discharge-check-valve. Make sure that the check valve moves fully and freely.
   (2) If necessary, replace the transfer-system discharge-check-valve (Ref. AMM TASK 28-26-44-000-001) and (Ref. AMM TASK 28-26-44-400-001).
5. Close-up
Subtask 28-26-00-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the fuel pipes that you removed (Ref. AMM TASK 28-00-00-400-001).
   (3) If necessary, install the applicable FQI probe 54QT1(54QT2) (Ref. AMM TASK 28-42-15-400-005):
   (4) Remove the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) and carefully close the applicable spring-loaded surge-door 540BZ 640BZ.
   (5) Install the applicable access panels 540AB 640AB (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-27-11-400-001).
Subtask 28-26-00-865-052-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUFUEL/L WING TK/PUMP2 SPLY7QAN26
121VUFUEL/L WING TK/PUMP1 SPLY1QAN23
121VUFUEL/R WING TK/PUMP2 SPLY8QAQ26
121VUFUEL/R WING TK/PUMP1 SPLY2QAQ23
121VUFUEL/CTR TK/L&R XFR/CTL & IND2QLR26
121VUFUEL/CTR TK/L&R XFR/CTL & IND1QLR25
123VUL WING TK/PUMP 1/STBY SPLY11QAAD12
123VUR WING TK/PUMP 1/STBY SPLY12QAAE12
Subtask 28-26-00-650-053-A ** ON A/C NOT FOR ALL
C. Fuel Configuration
   (1) Refuel, defuel or transfer fuel as necessary (Ref. AMM TASK 12-11-28-650-003), (Ref. AMM TASK 28-25-00-650-001) or (Ref. AMM TASK 28-25-00-869-001).
Subtask 28-26-00-942-051-A ** ON A/C NOT FOR ALL
D. Removal of Equipment
   (1) Remove the safety barriers.
   (2) Remove the WARNING NOTICE(S).
   (3) Remove the access platform(s).
   (4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.