W DOC AIRBUS | AMM A320F

Removal of the Center-Tank Defuel/Transfer Valve-Actuator


TASK 28-25-53-000-001-A
Removal of the Center-Tank Defuel/Transfer Valve-Actuator


FIN: 11QU
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
AR
CAP - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
192MB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
3. Job Set-up
Subtask 28-25-53-941-051-A
A. Make sure that on the refuel/defuel control panel 800VU:
  • the REFUEL switch is in the OFF position,
  • the OPEN light is off.
Subtask 28-25-53-865-050-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUFUEL/RFL/DFL/SPLY2QUL24
121VUFUEL/RFL/DFL/XFR/DEFUEL/VALVE1QUL23
** ON A/C NOT FOR ALL
121VUFUEL/RFL/DFL/SPLY2QUL23
121VUFUEL/RFL/DFL/XFR/DEFUEL/VALVE1QUL22
Subtask 28-25-53-010-051-A
C. Get Access
   (1) Open the MLG doors (Ref. AMM TASK 32-12-00-010-001).
   (2) Open the access door 192MB to get access to the refuel/defuel panel 800VU.
   (3) Put the ACCESS PLATFORM 2M (6 FT) in position at the main landing-gear door.
4. Procedure
Subtask 28-25-53-020-052-A
A. Removal of the Defuel/Transfer Valve-Actuator (11QU)
   (1) Disconnect the electrical connector (6) from the defuel/transfer valve-actuator (5).
   (2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (3) Release the screw and remove the V-clamp (3) which attaches the defuel/transfer valve-actuator (5) to the mounting flange (1).
   (4) Remove the defuel/transfer valve-actuator (5).
   (5) Remove and discard the O-ring (2) from the mounting flange (1).
   (6) Put a blanking cap on the mounting flange (1) and on the defuel/transfer valve actuator (5).
[Rev.10 from 2021] 2026.04.02 07:03:12 UTC