Installation of the Additional Center Tank (ACT) Refuel-Valve Canister
TASK 28-25-52-400-003-A
Installation of the Additional Center Tank (ACT) Refuel-Valve Canister
Self Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 28-25-52-941-056-A ** ON A/C NOT FOR ALL
Subtask 28-25-52-420-056-A ** ON A/C NOT FOR ALL
Subtask 28-25-52-650-056-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:07:05 UTC
Installation of the Additional Center Tank (ACT) Refuel-Valve Canister
WARNING:
THIS PROCEDURE USES A FUEL SYSTEM ITEM THAT IS IN A CATEGORY KNOWN AS A CRITICAL DESIGN CONFIGURATION CONTROL LIMITATION (CDCCL). CDCCL IDENTIFIES AN ITEM THAT CAN BE THE SOURCE OF A POSSIBLE FUEL TANK IGNITION. YOU MUST KEEP ALL CDCCL ITEMS IN THE APPROVED CONFIGURATION. DAMAGE, WEAR OR CHANGES TO A CDCCL ITEM CAN CAUSE A POSSIBLE FUEL TANK EXPLOSION.
WARNING:
MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 164QM ** ON A/C NOT FOR ALL
1. Reason for the JobSelf Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.01ABA1) | Turbine Fuel-- Kerosene - |
| (Material No.03FAB1) | Mineral Oil base Grease-- Vaseline or Petrolatum - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 11 | O-RING | AIPC 28-25-05-02-230 |
| 15 | O-RING | AIPC 28-25-05-02-230 |
| 11 | O-RING | AIPC 28-25-85-02-040 |
| 15 | O-RING | AIPC 28-25-85-02-040 |
| 13 | ORING | AIPC 28-28-05-02-020 |
| 13 | ORING | AIPC 28-28-85-02-020 |
| 11 | O-RING | AIPC 28-28-85-12-040 |
| 15 | O-RING | AIPC 28-28-85-13-040 |
| 16 | RESTRICTOR | AIPC 28-28-85-13-050 |
| 15 | ORING | AIPC 28-28-85-29-060 |
| 16 | RESTRCTR | AIPC 28-28-85-29-070 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-11-28-650-003-A | Pressure Refuel with Automatic Control |
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 28-10-00-910-001-A | Safety Procedures When You Do Work in a Fuel Tank |
| TASK 28-25-00-650-001-A | Pressure Defuel |
| TASK 28-25-00-650-003-A | To Drain Remaining Fuel from the Wing Tanks and the Center Tank |
| TASK 28-25-00-650-003-A-01 | To Drain Remaining Fuel from the Wing Tanks and the Center Tank |
| TASK 28-25-00-869-001-A | Fuel Transfer |
| TASK 28-25-51-000-004-A | Removal of the Refuel Valve |
| TASK 28-25-51-400-004-A | Installation of the Additional Center Tank (ACT) Refuel Valve |
| TASK 28-42-00-740-001-A | Status Report (BITE) |
| TASK 28-46-00-740-001-A | Functional (BITE) Test |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
| TASK 57-17-11-000-003-A | Removal of the Protective Cover of the ACT-Equipment Support Door |
| TASK 57-17-11-400-003-A | Installation of the Protective Cover of the ACT-Equipment Support Door |
Subtask 28-25-52-941-056-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(2) Make sure that the SAFETY BARRIER(S) is (are) in position.
(3) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to operate the MLG doors.
Subtask 28-25-52-860-054-A ** ON A/C NOT FOR ALL WARNING:
BEFORE YOU DO WORK IN OR NEAR A FUEL TANK, MAKE SURE THAT YOU OBEY ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT.
(1) You must obey the fuel safety procedures (Ref. AMM TASK 28-10-00-910-001) when you do work in a fuel tank. (2) Make sure that the SAFETY BARRIER(S) is (are) in position.
(3) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to operate the MLG doors.
B. Aircraft Maintenance Configuration
(1) Make sure that the center tank is defueled (Ref. AMM TASK 28-25-00-650-001).
(2) Make sure that the remaining fuel has been drained from the center tank (Ref. AMM TASK 28-25-00-650-003).
(3) Make sure that the LH MLG door is open (Ref. AMM TASK 32-12-00-010-001).
(4) Make sure that the 460005835 SLEEVE - GROUND LOCK is installed on the LH MLG door actuating-cylinder.
(5) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position at zone 148.
(6) Make sure that the protective cover of the ACT-equipment support door is removed (Ref. AMM TASK 57-17-11-000-003).
(7) Make sure that the refuel valve 41QU has been removed (Ref. AMM TASK 28-25-51-000-004).
Subtask 28-25-52-865-053-A ** ON A/C NOT FOR ALL (1) Make sure that the center tank is defueled (Ref. AMM TASK 28-25-00-650-001).
(2) Make sure that the remaining fuel has been drained from the center tank (Ref. AMM TASK 28-25-00-650-003).
(3) Make sure that the LH MLG door is open (Ref. AMM TASK 32-12-00-010-001).
(4) Make sure that the 460005835 SLEEVE - GROUND LOCK is installed on the LH MLG door actuating-cylinder.
(5) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position at zone 148.
(6) Make sure that the protective cover of the ACT-equipment support door is removed (Ref. AMM TASK 57-17-11-000-003).
(7) Make sure that the refuel valve 41QU has been removed (Ref. AMM TASK 28-25-51-000-004).
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | ACT1/REFUEL & SPLY | 33QU | L29 |
| 121VU | FUEL/RFL/DFL/SPLY | 2QU | L24 |
| 121VU | FUEL/RFL/DFL/XFR/DEFUEL/VALVE | 1QU | L23 |
| 121VU | ACT XFR VALVE MAN CTL | 30QH | N29 |
| 121VU | ACT1/CTL & SPLY | 9QH | P29 |
| 121VU | ACT PUMP SUPPLY | 25QH | Q29 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/ACT XFR VLV/MOT2 | 66QH | J18 |
| 121VU | FUEL/ACT XFR VLV/MOT1 | 65QH | J17 |
| 121VU | FUEL/RFL/DFL/SPLY | 2QU | L23 |
| 121VU | FUEL/RFL/DFL/XFR/DEFUEL/VALVE | 1QU | L22 |
| 121VU | FUEL/ACT/FUEL PUMP/SPLY | 25QH | Q29 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | ACT2/REFUEL & SPLY | 34QU | L28 |
| 121VU | ACT2/CTL & SPLY | 10QH | P28 |
Subtask 28-25-52-420-056-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(2) Lubricate the new parts that follow with Turbine Fuel-- Kerosene - (Material No.01ABA1) or Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) :
Subtask 28-25-52-420-057-A ** ON A/C NOT FOR ALL (1) Clean the component interface and/or the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(2) Lubricate the new parts that follow with Turbine Fuel-- Kerosene - (Material No.01ABA1) or Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) :
- The O-ring (11)
- The O-ring (13)
- The O-ring (15).
B. Installation of the Refuel Valve Canister 164QM
(1) Install the refuel valve canister (12) in position.
(2) Install the screws (14).
(3) Bonding check:
(4) Remove the blanking plugs from the disconnected line ends.
(5) Install the AIPC 28-25-05-02-230 O-RING (15) or AIPC 28-25-85-02-040 O-RING (15) in the groove in the adaptor (2).
(6) Connect the adaptor (2) to the refuel valve canister (12) with the bolts (1) and the washers (16).
(7) Install the AIPC 28-25-05-02-230 O-RING (11) or AIPC 28-25-85-02-040 O-RING (11) in the groove in the elbow (10).
(8) Connect the elbow (10) to the refuel valve canister (12) with the bolts (8) and the washers (9).
(9) Put the bonding straps (3) and (4) in position on the refuel valve canister (12).
(10) Install the screw (5), the washer (6) and the nut (7) (Ref. AMM TASK 20-28-00-912-802).
(11) Make sure that the bonding straps (3) and (4) are correctly bonded:
(a) Do a bonding check between the bonding straps (3) and (4) and the canister (12) (Ref. AMM TASK 20-28-00-912-802). The bonding resistance must be less than 10 milliohms.
Subtask 28-25-52-420-057-B ** ON A/C NOT FOR ALL (1) Install the refuel valve canister (12) in position.
(2) Install the screws (14).
(3) Bonding check:
WARNING:
THIS INSTRUCTION IS APPLICABLE TO A CRITICAL DESIGN CONFIGURATION CONTROL LIMITATION (CDCCL) ITEM. CAREFULLY OBEY ALL GIVEN INSTRUCTIONS WHEN YOU DO THIS STEP. IF YOU DO NOT OBEY THESE INSTRUCTIONS, A DANGEROUS CONDITION CAN OCCUR THAT CAN CAUSE A POSSIBLE FUEL TANK EXPLOSION.
(a) Do a bonding check of screws (14) (Ref. AMM TASK 20-28-00-912-802). (4) Remove the blanking plugs from the disconnected line ends.
(5) Install the AIPC 28-25-05-02-230 O-RING (15) or AIPC 28-25-85-02-040 O-RING (15) in the groove in the adaptor (2).
(6) Connect the adaptor (2) to the refuel valve canister (12) with the bolts (1) and the washers (16).
(7) Install the AIPC 28-25-05-02-230 O-RING (11) or AIPC 28-25-85-02-040 O-RING (11) in the groove in the elbow (10).
(8) Connect the elbow (10) to the refuel valve canister (12) with the bolts (8) and the washers (9).
(9) Put the bonding straps (3) and (4) in position on the refuel valve canister (12).
(10) Install the screw (5), the washer (6) and the nut (7) (Ref. AMM TASK 20-28-00-912-802).
(11) Make sure that the bonding straps (3) and (4) are correctly bonded:
(a) Do a bonding check between the bonding straps (3) and (4) and the canister (12) (Ref. AMM TASK 20-28-00-912-802). The bonding resistance must be less than 10 milliohms.
B. Installation of Refuel Valve Canister 164QM
(1) Install the refuel valve canister (12) in position.
(2) Install and tighten the screws (14).
(3) Bonding check:
(4) Remove the PLUG-BLANKING from each disconnected line end.
(5) Install the new AIPC 28-28-85-13-050 RESTRICTOR (16) or AIPC 28-28-85-29-070 RESTRCTR (16) and the new AIPC 28-28-85-13-040 O-RING (15) or AIPC 28-28-85-29-060 ORING (15) in the groove in the adaptor (2).
(6) Connect the adaptor (2) to the refuel valve canister (12) with the bolts (1) and the washers (17).
(7) TORQUE the bolts (1) opposite to each other to between 0.4 and 0.3 m.daN (35.40 and 26.55 lbf.in )
.
(8) Do a bonding check of the bolts (1) (Ref. AMM TASK 20-28-00-912-802).
(9) Install the new AIPC 28-28-85-12-040 O-RING (11) in the groove in the elbow (10).
(10) Connect the elbow (10) to the refuel valve canister (12) with the bolts (8) and the washers (9).
(11) TORQUE the bolts (8) opposite to each other to between 0.4 and 0.3 m.daN (35.40 and 26.55 lbf.in )
.
(12) Do a bonding check of the bolts (8) (Ref. AMM TASK 20-28-00-912-802).
(13) Put the bonding straps (5) and (6) in position on the refuel valve canister (12).
(14) Install the screw (3), the washer (4) and the nut (7).
(15) TORQUE the screw (3) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
.
(16) Make sure that the bonding straps (5) and (6) are correctly bonded:
(a) Do a bonding check between the bonding straps (5) and (6) and the canister (12) (Ref. AMM TASK 20-28-00-912-802). The bonding resistance must be less than 10 milliohms.
Subtask 28-25-52-790-052-A ** ON A/C NOT FOR ALL (1) Install the refuel valve canister (12) in position.
(2) Install and tighten the screws (14).
(3) Bonding check:
WARNING:
THIS INSTRUCTION IS APPLICABLE TO A CRITICAL DESIGN CONFIGURATION CONTROL LIMITATION (CDCCL) ITEM. CAREFULLY OBEY ALL GIVEN INSTRUCTIONS WHEN YOU DO THIS STEP. IF YOU DO NOT OBEY THESE INSTRUCTIONS, A DANGEROUS CONDITION CAN OCCUR THAT CAN CAUSE A POSSIBLE FUEL TANK EXPLOSION.
(a) Do a bonding check of the screws (14) (Ref. AMM TASK 20-28-00-912-802).(4) Remove the PLUG-BLANKING from each disconnected line end.
(5) Install the new AIPC 28-28-85-13-050 RESTRICTOR (16) or AIPC 28-28-85-29-070 RESTRCTR (16) and the new AIPC 28-28-85-13-040 O-RING (15) or AIPC 28-28-85-29-060 ORING (15) in the groove in the adaptor (2).
(6) Connect the adaptor (2) to the refuel valve canister (12) with the bolts (1) and the washers (17).
(7) TORQUE the bolts (1) opposite to each other to between 0.4 and 0.3 m.daN (35.40 and 26.55 lbf.in )
. (8) Do a bonding check of the bolts (1) (Ref. AMM TASK 20-28-00-912-802).
(9) Install the new AIPC 28-28-85-12-040 O-RING (11) in the groove in the elbow (10).
(10) Connect the elbow (10) to the refuel valve canister (12) with the bolts (8) and the washers (9).
(11) TORQUE the bolts (8) opposite to each other to between 0.4 and 0.3 m.daN (35.40 and 26.55 lbf.in )
. (12) Do a bonding check of the bolts (8) (Ref. AMM TASK 20-28-00-912-802).
(13) Put the bonding straps (5) and (6) in position on the refuel valve canister (12).
(14) Install the screw (3), the washer (4) and the nut (7).
(15) TORQUE the screw (3) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
. (16) Make sure that the bonding straps (5) and (6) are correctly bonded:
(a) Do a bonding check between the bonding straps (5) and (6) and the canister (12) (Ref. AMM TASK 20-28-00-912-802). The bonding resistance must be less than 10 milliohms.
C. Test(s)
(1) Make sure there are no leaks at the interface of the refuel valve canister (12) with the structure.
Subtask 28-25-52-410-053-A ** ON A/C NOT FOR ALL (1) Make sure there are no leaks at the interface of the refuel valve canister (12) with the structure.
D. Close Access
(1) Install the refuel valve 41QU (Ref. AMM TASK 28-25-51-400-004).
(2) Install the protective cover for the ACT-equipment support door (Ref. AMM TASK 57-17-11-400-003).
(3) Make sure that the work area is clean and clear of tools and other items.
Subtask 28-25-52-650-055-A ** ON A/C NOT FOR ALL (1) Install the refuel valve 41QU (Ref. AMM TASK 28-25-51-400-004).
(2) Install the protective cover for the ACT-equipment support door (Ref. AMM TASK 57-17-11-400-003).
(3) Make sure that the work area is clean and clear of tools and other items.
E. Fuel Configuration
(1) Refuel or transfer a minimum of 3000 kg (6614 lb) of fuel into the center tank (Ref. AMM TASK 12-11-28-650-003), (Ref. AMM TASK 28-25-00-869-001).
Subtask 28-25-52-865-055-A ** ON A/C NOT FOR ALL (1) Refuel or transfer a minimum of 3000 kg (6614 lb) of fuel into the center tank (Ref. AMM TASK 12-11-28-650-003), (Ref. AMM TASK 28-25-00-869-001).
F. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 28-25-52-740-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | ACT1/REFUEL & SPLY | 33QU | L29 |
| 121VU | FUEL/RFL/DFL/SPLY | 2QU | L24 |
| 121VU | FUEL/RFL/DFL/XFR/DEFUEL/VALVE | 1QU | L23 |
| 121VU | ACT XFR VALVE MAN CTL | 30QH | N29 |
| 121VU | ACT1/CTL & SPLY | 9QH | P29 |
| 121VU | ACT PUMP SUPPLY | 25QH | Q29 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/ACT XFR VLV/MOT2 | 66QH | J18 |
| 121VU | FUEL/ACT XFR VLV/MOT1 | 65QH | J17 |
| 121VU | FUEL/RFL/DFL/SPLY | 2QU | L23 |
| 121VU | FUEL/RFL/DFL/XFR/DEFUEL/VALVE | 1QU | L22 |
| 121VU | FUEL/ACT/FUEL PUMP/SPLY | 25QH | Q29 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | ACT2/REFUEL & SPLY | 34QU | L28 |
| 121VU | ACT2/CTL & SPLY | 10QH | P28 |
G. BITE Test
(2) Do a BITE test of the FLSS system (Ref. AMM TASK 28-46-00-740-001).
5. Close-upNOTE: These tests are only applicable if you do maintenance work in the center wing-box area.
(1) Do a BITE test of the FQI system (Ref. AMM TASK 28-42-00-740-001). (2) Do a BITE test of the FLSS system (Ref. AMM TASK 28-46-00-740-001).
Subtask 28-25-52-650-056-A ** ON A/C NOT FOR ALL
A. Fuel Configuration
(1) Refuel, defuel or transfer fuel as necessary (Ref. AMM TASK 12-11-28-650-003), (Ref. AMM TASK 28-25-00-650-001) or (Ref. AMM TASK 28-25-00-869-001).
Subtask 28-25-52-410-054-A ** ON A/C NOT FOR ALL (1) Refuel, defuel or transfer fuel as necessary (Ref. AMM TASK 12-11-28-650-003), (Ref. AMM TASK 28-25-00-650-001) or (Ref. AMM TASK 28-25-00-869-001).
B. Close Access
(1) Remove the access platform(s).
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Close the LH MLG door (Ref. AMM TASK 32-12-00-410-001).
Subtask 28-25-52-942-054-A ** ON A/C NOT FOR ALL (1) Remove the access platform(s).
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Close the LH MLG door (Ref. AMM TASK 32-12-00-410-001).
C. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the WARNING NOTICE(S).
(3) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Remove the safety barriers.
(2) Remove the WARNING NOTICE(S).
(3) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Refuel Valve Canister 164QM