Installation of the Refuel Spill-Pipe Diffuser
TASK 28-25-46-400-001-A
Installation of the Refuel Spill-Pipe Diffuser
Self Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 28-25-46-941-053-A ** ON A/C NOT FOR ALL
Subtask 28-25-46-420-050-A ** ON A/C NOT FOR ALL
Subtask 28-25-46-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:17:41 UTC
Installation of the Refuel Spill-Pipe Diffuser
WARNING:
THIS PROCEDURE USES A FUEL SYSTEM ITEM THAT IS IN A CATEGORY KNOWN AS A CRITICAL DESIGN CONFIGURATION CONTROL LIMITATION (CDCCL). CDCCL IDENTIFIES AN ITEM THAT CAN BE THE SOURCE OF A POSSIBLE FUEL TANK IGNITION. YOU MUST KEEP ALL CDCCL ITEMS IN THE APPROVED CONFIGURATION. DAMAGE, WEAR OR CHANGES TO A CDCCL ITEM CAN CAUSE A POSSIBLE FUEL TANK EXPLOSION.
WARNING:
MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
1. Reason for the JobSelf Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 3M (10 FT) |
| No specific | AR | SAFETY BARRIER(S) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.06HAA1) | Coating Sealant-Fuel Tank Brushable - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 540HB, 640HB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-11-28-650-003-A | Pressure Refuel with Automatic Control |
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 28-10-00-910-001-A | Safety Procedures When You Do Work in a Fuel Tank |
| TASK 28-10-00-910-002-A | Access to the Fuel Tanks and the Work Areas |
| TASK 28-12-46-000-001-A | Removal of the Overpressure Protector Outlet |
| TASK 28-25-00-650-001-A | Pressure Defuel |
| TASK 28-25-00-650-003-A | To Drain Remaining Fuel from the Wing Tanks and the Center Tank |
| TASK 28-25-00-650-003-A-01 | To Drain Remaining Fuel from the Wing Tanks and the Center Tank |
| TASK 28-25-00-869-001-A | Fuel Transfer |
| TASK 57-27-11-400-002-A | Installation of the Access Panel |
Subtask 28-25-46-941-053-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(2) Make sure that the SAFETY BARRIER(S) are in position.
Subtask 28-25-46-860-050-A ** ON A/C NOT FOR ALL WARNING:
BEFORE YOU DO WORK IN OR NEAR A FUEL TANK, MAKE SURE THAT YOU OBEY ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT.
(1) You must obey the fuel safety procedures (Ref. AMM TASK 28-10-00-910-001) when you do work in a fuel tank. (2) Make sure that the SAFETY BARRIER(S) are in position.
B. Aircraft Maintenance Configuration
(1) Make sure that the applicable fuel tank is defueled (Ref. AMM TASK 28-25-00-650-001).
(2) Make sure that the remaining fuel has been drained from the applicable fuel tank (Ref. AMM TASK 28-25-00-650-003).
(3) Make sure that the ACCESS PLATFORM 3M (10 FT) is below the applicable access panel 540HB (640HB).
(4) Make sure that the applicable access panel 540HB 640HB is removed (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 28-12-46-000-001).
4. Procedure(1) Make sure that the applicable fuel tank is defueled (Ref. AMM TASK 28-25-00-650-001).
(2) Make sure that the remaining fuel has been drained from the applicable fuel tank (Ref. AMM TASK 28-25-00-650-003).
(3) Make sure that the ACCESS PLATFORM 3M (10 FT) is below the applicable access panel 540HB (640HB).
(4) Make sure that the applicable access panel 540HB 640HB is removed (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 28-12-46-000-001).
Subtask 28-25-46-420-050-A ** ON A/C NOT FOR ALL
A. Preparation For Installation
(1) Clean the component interfaces and the adjacent areas with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 28-25-46-420-051-C ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent areas with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
B. Installation of the Refuel Spill-Pipe Diffuser
(1) Put the refuel spill-pipe diffuser (5) in position and attach it to the pipe support bracket with the bolts (1) and (2).
(3) Make sure that one of the bolts (7) is correctly bonded:
(4) Install the bolts (6) and the nuts (4) in the bracket.
(5) Apply Coating Sealant-Fuel Tank Brushable - (Material No.06HAA1) on and around the head of the bolts (6) and the nuts (4).
5. Close-up(1) Put the refuel spill-pipe diffuser (5) in position and attach it to the pipe support bracket with the bolts (1) and (2).
NOTE: You must bond one of the bolts (7) (Ref. AMM TASK 20-28-00-912-802).
(2) Install the washers (3) and the bolts (7) in the support brackets. (3) Make sure that one of the bolts (7) is correctly bonded:
WARNING:
THIS INSTRUCTION IS APPLICABLE TO A CRITICAL DESIGN CONFIGURATION CONTROL LIMITATION (CDCCL) ITEM. CAREFULLY OBEY ALL GIVEN INSTRUCTIONS WHEN YOU DO THIS STEP. IF YOU DO NOT OBEY THESE INSTRUCTIONS, A DANGEROUS CONDITION CAN OCCUR THAT CAN CAUSE A POSSIBLE FUEL TANK EXPLOSION.
(a) Do a bonding check of one of the bolts (7) (Ref. AMM TASK 20-28-00-912-802). The bonding resistance must be less than 10 milliohms. (4) Install the bolts (6) and the nuts (4) in the bracket.
(5) Apply Coating Sealant-Fuel Tank Brushable - (Material No.06HAA1) on and around the head of the bolts (6) and the nuts (4).
Subtask 28-25-46-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel 540HB 640HB (Ref. AMM TASK 57-27-11-400-002).
Subtask 28-25-46-650-053-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel 540HB 640HB (Ref. AMM TASK 57-27-11-400-002).
B. Fuel Configuration
(1) Refuel, defuel or transfer fuel as necessary (Ref. AMM TASK 12-11-28-650-003), (Ref. AMM TASK 28-25-00-650-001) or (Ref. AMM TASK 28-25-00-869-001).
Subtask 28-25-46-942-051-A ** ON A/C NOT FOR ALL (1) Refuel, defuel or transfer fuel as necessary (Ref. AMM TASK 12-11-28-650-003), (Ref. AMM TASK 28-25-00-650-001) or (Ref. AMM TASK 28-25-00-869-001).
C. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Remove the safety barriers.
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.