W DOC AIRBUS | AMM A320F

Installation of the Center-Tank Pressure-Relief Valve


TASK 28-25-45-400-001-A
Installation of the Center-Tank Pressure-Relief Valve


WARNING: BEFORE YOU DO WORK IN OR NEAR A FUEL TANK, MAKE SURE THAT YOU OBEY ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT.
WARNING: MAKE SURE THAT THE "MAN INSIDE" FLAG HANGS FROM THE WING DOOR PANEL OPENING.
ZONE: 142
FIN: 97QM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
98D57004014000
2
HOOK-COVER (RIB2-SURGE DOORS)
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.01ABA1)
Turbine Fuel-- Kerosene -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
142
WING CENTER BOX
148AZ, 640AB, 640BZ
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
5
WASHERS
AIPC 28-25-05-05-030
4
O-RING
AIPC 28-25-05-05-040
5
WASHERS
AIPC 28-25-85-05-020
4
O-RING
AIPC 28-25-85-05-040
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 12-11-28-650-003-A
Pressure Refuel with Automatic Control
TASK 28-25-00-650-001-A
Pressure Defuel
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
TASK 57-17-11-000-001-A
Removal of Access Cover 147AZ(148AZ)
TASK 57-17-11-000-001-B
Removal of Access Cover 148AZ or/and the ACT-Equipment Support Door
TASK 57-17-11-400-001-A
Installation of Access Cover 147AZ(148AZ)
TASK 57-17-11-400-001-B
Installation of Access Cover 148AZ or/and the ACT-Equipment Support-Door
TASK 57-27-11-000-001-A
Removal of the Access Panel
TASK 57-27-11-400-001-A
Installation of the Access Panel
TASK 57-27-12-000-002-A
Removal of the Rib 2 Access Panel 540AZ(640AZ) or 540BZ(640BZ)
TASK 57-27-12-400-002-A
Installation of the Rib 2 Access Panel 540AZ (640AZ) or 540BZ (640BZ)
3. Job Set-up
Subtask 28-25-45-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the center tank and the right wing tank (Ref. AMM TASK 28-25-00-650-001) are defueled.
   (2) Make sure that the main door of the right main gear (Ref. AMM TASK 32-12-00-010-001) is open.
   (3) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at zone 142.
   (4) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position at zone 640.
   (5) Make sure that the manhole cover 148AZ (Ref. AMM TASK 57-17-11-000-001) is removed.
   (6) Make sure that the manhole cover 640AB (Ref. AMM TASK 57-27-11-000-001) is removed.
   (7) Make sure that the surge door 640BZ is open.
   (8) Make sure that the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) (7) at the surge door is installed.
Subtask 28-25-45-860-050-C ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the center tank and the right wing tank are defueled (Ref. AMM TASK 28-25-00-650-001).
   (2) Make sure that the main door of the right Main Landing Gear (MLG) is opened (Ref. AMM TASK 32-12-00-010-001).
   (3) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position below zone 142.
   (4) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position below access panel 640AB.
   (5) Make sure that access cover 148AZ is removed (Ref. AMM TASK 57-17-11-000-001).
   (6) Make sure that access panel 640AB is removed (Ref. AMM TASK 57-27-11-000-001).
   (7) Make sure that RIB2 access panel 640BZ is removed (Ref. AMM TASK 57-27-12-000-002).
4. Procedure
Subtask 28-25-45-640-050-A
A. Apply Turbine Fuel-- Kerosene - (Material No.01ABA1) to the new O-ring (4).
Subtask 28-25-45-420-050-A 5. Close-up
Subtask 28-25-45-210-050-A
A. Do a visual check of the center-tank pressure-relief valve (97QM) to make sure that the component is installed correctly.
Subtask 28-25-45-410-050-A ** ON A/C NOT FOR ALL
B. Close Access
   (1) Make sure that there are no unwanted objects and materials, tools or other equipment in the center tank and the right wing tank.
   (2) Remove
98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) (7) at the surge door.
   (3) Close the surge door 640BZ.
   (4) Install the manhole cover 640AB (Ref. AMM TASK 57-27-11-400-001).
   (5) Install the manhole cover 148AZ (Ref. AMM TASK 57-17-11-400-001).
   (6) Make sure that the work area is clean and clear of tools and other items.
   (7) Remove the access platform(s).
   (8) Close the main door of the right main gear (Ref. AMM TASK 32-12-00-410-001).
Subtask 28-25-45-410-050-C ** ON A/C NOT FOR ALL
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install RIB2 access panel 640BZ (Ref. AMM TASK 57-27-12-400-002).
   (3) Install access panel 640AB (Ref. AMM TASK 57-27-11-400-001).
   (4) Install access cover 148AZ (Ref. AMM TASK 57-17-11-400-001).
   (5) Close the main door of the right MLG (Ref. AMM TASK 32-12-00-410-001).
   (6) Remove the access platform(s).
Subtask 28-25-45-650-051-A
C. Refuel the center tank and the right wing tank (Ref. AMM TASK 12-11-28-650-003).
[Rev.10 from 2021] 2026.04.02 06:17:41 UTC