1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
98D57004014000
1
HOOK-COVER (RIB2-SURGE DOORS)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
142
WING CENTER BOX
148AZ, 640AB, 640BZ
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 28-25-00-650-001-A
Pressure Defuel
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
TASK 57-17-11-000-001-A
Removal of Access Cover 147AZ(148AZ)
TASK 57-17-11-000-001-B
Removal of Access Cover 148AZ or/and the ACT-Equipment Support Door
TASK 57-27-11-000-001-A
Removal of the Access Panel
TASK 57-27-12-000-002-A
Removal of the Rib 2 Access Panel 540AZ(640AZ) or 540BZ(640BZ)
3. Job Set-up
Subtask 28-25-45-650-050-A
A. Defuel the center tank and the right wing tank (Ref. AMM TASK 28-25-00-650-001).
Subtask 28-25-45-010-050-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Open the main door of the right main gear (Ref. AMM TASK 32-12-00-010-001).
   (2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at zone 142.
   (3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE at zone 640.
   (4) Remove the manhole cover 148AZ (Ref. AMM TASK 57-17-11-000-001).
   (5) Remove the manhole cover 640AB (Ref. AMM TASK 57-27-11-000-001).
   (6) Open the surge door 640BZ.
   (7) Install the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) (7) at the surge door.
Subtask 28-25-45-010-050-C ** ON A/C NOT FOR ALL
B. Get Access
   (1) Open the main door of the right Main Landing Gear (MLG) (Ref. AMM TASK 32-12-00-010-001).
   (2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below zone 142.
   (3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below access panel 640AB.
   (4) Remove access cover 148AZ (Ref. AMM TASK 57-17-11-000-001).
   (5) Remove access panel 640AB (Ref. AMM TASK 57-27-11-000-001).
   (6) Remove RIB2 access panel 640BZ (Ref. AMM TASK 57-27-12-000-002).
4. Procedure
Subtask 28-25-45-020-050-A
A. Removal of the Center Tank Pressure Relief Valve (97QM)
   (1) Remove the nuts (3), the bolts (6) and remove and discard the washers (5).
   (2) Remove the valve (2) and remove and discard the O-ring (4).