Removal of the Center-Tank Pressure-Relief Valve
TASK 28-25-45-000-001-A
Removal of the Center-Tank Pressure-Relief Valve
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 28-25-45-650-050-A Subtask 28-25-45-010-050-A ** ON A/C NOT FOR ALL
Subtask 28-25-45-020-050-A
[Rev.10 from 2021]
2026.04.02 06:17:40 UTC
Removal of the Center-Tank Pressure-Relief Valve
WARNING:
BEFORE YOU DO WORK IN OR NEAR A FUEL TANK, MAKE SURE THAT YOU OBEY ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT.
WARNING:
MAKE SURE THAT THE "MAN INSIDE" FLAG HANGS FROM THE WING DOOR PANEL OPENING.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| 98D57004014000 | 1 | HOOK-COVER (RIB2-SURGE DOORS) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 142 | WING CENTER BOX |
| 148AZ, 640AB, 640BZ |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 28-25-00-650-001-A | Pressure Defuel |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 57-17-11-000-001-A | Removal of Access Cover 147AZ(148AZ) |
| TASK 57-17-11-000-001-B | Removal of Access Cover 148AZ or/and the ACT-Equipment Support Door |
| TASK 57-27-11-000-001-A | Removal of the Access Panel |
| TASK 57-27-12-000-002-A | Removal of the Rib 2 Access Panel 540AZ(640AZ) or 540BZ(640BZ) |
Subtask 28-25-45-650-050-A Subtask 28-25-45-010-050-A ** ON A/C NOT FOR ALL
B. Get Access
(1) Open the main door of the right main gear (Ref. AMM TASK 32-12-00-010-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at zone 142.
(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE at zone 640.
(4) Remove the manhole cover 148AZ (Ref. AMM TASK 57-17-11-000-001).
(5) Remove the manhole cover 640AB (Ref. AMM TASK 57-27-11-000-001).
(6) Open the surge door 640BZ.
(7) Install the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) (7) at the surge door.
Subtask 28-25-45-010-050-C ** ON A/C NOT FOR ALL (1) Open the main door of the right main gear (Ref. AMM TASK 32-12-00-010-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at zone 142.
(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE at zone 640.
(4) Remove the manhole cover 148AZ (Ref. AMM TASK 57-17-11-000-001).
(5) Remove the manhole cover 640AB (Ref. AMM TASK 57-27-11-000-001).
(6) Open the surge door 640BZ.
(7) Install the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) (7) at the surge door.
B. Get Access
(1) Open the main door of the right Main Landing Gear (MLG) (Ref. AMM TASK 32-12-00-010-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below zone 142.
(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below access panel 640AB.
(4) Remove access cover 148AZ (Ref. AMM TASK 57-17-11-000-001).
(5) Remove access panel 640AB (Ref. AMM TASK 57-27-11-000-001).
(6) Remove RIB2 access panel 640BZ (Ref. AMM TASK 57-27-12-000-002).
4. Procedure(1) Open the main door of the right Main Landing Gear (MLG) (Ref. AMM TASK 32-12-00-010-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below zone 142.
(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below access panel 640AB.
(4) Remove access cover 148AZ (Ref. AMM TASK 57-17-11-000-001).
(5) Remove access panel 640AB (Ref. AMM TASK 57-27-11-000-001).
(6) Remove RIB2 access panel 640BZ (Ref. AMM TASK 57-27-12-000-002).
Subtask 28-25-45-020-050-A
A. Removal of the Center Tank Pressure Relief Valve (97QM)
(1) Remove the nuts (3), the bolts (6) and remove and discard the washers (5).
(2) Remove the valve (2) and remove and discard the O-ring (4).
(1) Remove the nuts (3), the bolts (6) and remove and discard the washers (5).
(2) Remove the valve (2) and remove and discard the O-ring (4).
Pressure Relief Valve of Center Tank