Detailed Inspection of Coupling Refuel/Defuel
TASK 28-25-41-200-001-A
Detailed Inspection of Coupling Refuel/Defuel
Refer to the MPD TASK: 282541-01
DETAILED INSPECTION OF COUPLING REFUEL/DEFUEL.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 28-25-41-941-057-A
Subtask 28-25-41-210-054-B
Subtask 28-25-41-410-055-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:17:40 UTC
Detailed Inspection of Coupling Refuel/Defuel
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
1. Reason for the Job- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
Refer to the MPD TASK: 282541-01
DETAILED INSPECTION OF COUPLING REFUEL/DEFUEL.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE |
| No specific | AR | SAFETY BARRIER(S) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 522 | OUTBOARD FIXED L.E STRUCTURE |
| 622 | OUTBOARD FIXED L.E STRUCTURE |
| 622HB | |
| 522HB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 28-00-00-910-001-A | Fuel Safety Procedures |
| TASK 28-25-41-000-001-A | Removal of the Refuel/Defuel Coupling/Cap |
| TASK 28-25-41-000-005-A | Removal of the Refuel/Defuel Coupling-Element Assembly |
| TASK 28-25-41-400-005-A | Installation of the Refuel/Defuel Coupling/Cap |
| TASK 28-25-41-400-006-A | Installation of the Refuel/Defuel Coupling Element-Assembly |
Subtask 28-25-41-941-057-A
A. Safety Precautions
(2) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's instructions and your local regulations.
Subtask 28-25-41-865-050-A WARNING:
OBEY THE FUEL SAFETY PROCEDURES.
(1) You must obey the fuel safety procedures when you do work on the fuel system (Ref. AMM TASK 28-00-00-910-001). (2) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's instructions and your local regulations.
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 28-25-41-010-056-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B01 |
| ** ON A/C ALL | |||
| 121VU | FLIGHT CONTROLS/SLT/CTL/SYS2 | 7CV | R21 |
C. Get Access
(1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE below the applicable refuel/defuel coupling.
(2) Remove the refuel/defuel coupling cap (6) from the refuel/defuel coupling (1).
(3) Remove the access panel 522HB ( 622HB).
Subtask 28-25-41-010-056-B ** ON A/C NOT FOR ALL (1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE below the applicable refuel/defuel coupling.
(2) Remove the refuel/defuel coupling cap (6) from the refuel/defuel coupling (1).
(3) Remove the access panel 522HB ( 622HB).
C. Get Access
(1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE below the applicable refuel/defuel coupling.
(2) Remove the refuel/defuel coupling cap (6) from the refuel/defuel coupling (1).
(3) Remove the access panel 622HB.
4. Procedure(1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE below the applicable refuel/defuel coupling.
(2) Remove the refuel/defuel coupling cap (6) from the refuel/defuel coupling (1).
(3) Remove the access panel 622HB.
Subtask 28-25-41-210-054-B
A. Detailed Inspection of Coupling Refuel/Defuel
(1) Examine the refuel/defuel coupling cap (6) and the chain (7) for their correct condition:
(a) Make sure that the chain (7) is correctly attached.
(b) If you find corrosion or damage:
1 Remove the refuel/defuel coupling cap (6) and the chain (7) (Ref. AMM TASK 28-25-41-000-001).
2 Send the refuel/defuel coupling cap (6) and the chain (7) to the workshop.
3 Install the refuel/defuel coupling cap (6) and the chain (7) (Ref. AMM TASK 28-25-41-400-005).
(2) Examine the refuel/defuel coupling assembly (1) for corrosion and damage:
(a) If you find corrosion or damage:
1 Remove the refuel/defuel coupling assembly (1) (Ref. AMM TASK 28-25-41-000-001).
2 Send the refuel/defuel coupling assembly (1) to the workshop.
3 Install the refuel/defuel coupling assembly (1) (Ref. AMM TASK 28-25-41-400-005).
(b) If you find scratches or scores, make sure that they do not extend to the sealing face.
(4) Make sure that it is more than 5.842 mm (0.2300 in.).
(5) If the dimension is not correct, replace the coupling element assembly (Ref. AMM TASK 28-25-41-000-005) and (Ref. AMM TASK 28-25-41-400-006).
(6) Examine the shroud (4), the shroud backing plate (5) and the shroud support ring (2) for their correct condition.
(7) Examine the front spar around the refuel/defuel coupling (1) for signs of fuel leaks.
(8) Make sure that the paint and other protective treatments on and around the refuel/defuel coupling (1) are in good condition.
5. Close-up(1) Examine the refuel/defuel coupling cap (6) and the chain (7) for their correct condition:
(a) Make sure that the chain (7) is correctly attached.
(b) If you find corrosion or damage:
1 Remove the refuel/defuel coupling cap (6) and the chain (7) (Ref. AMM TASK 28-25-41-000-001).
2 Send the refuel/defuel coupling cap (6) and the chain (7) to the workshop.
3 Install the refuel/defuel coupling cap (6) and the chain (7) (Ref. AMM TASK 28-25-41-400-005).
(2) Examine the refuel/defuel coupling assembly (1) for corrosion and damage:
(a) If you find corrosion or damage:
1 Remove the refuel/defuel coupling assembly (1) (Ref. AMM TASK 28-25-41-000-001).
2 Send the refuel/defuel coupling assembly (1) to the workshop.
3 Install the refuel/defuel coupling assembly (1) (Ref. AMM TASK 28-25-41-400-005).
(b) If you find scratches or scores, make sure that they do not extend to the sealing face.
NOTE: Scratches or scores to the valve head (8) are permitted.
(3) Measure the thickness of the lugs (DIM x) on the coupling jaw ring (3).(4) Make sure that it is more than 5.842 mm (0.2300 in.).
(5) If the dimension is not correct, replace the coupling element assembly (Ref. AMM TASK 28-25-41-000-005) and (Ref. AMM TASK 28-25-41-400-006).
(6) Examine the shroud (4), the shroud backing plate (5) and the shroud support ring (2) for their correct condition.
(7) Examine the front spar around the refuel/defuel coupling (1) for signs of fuel leaks.
(8) Make sure that the paint and other protective treatments on and around the refuel/defuel coupling (1) are in good condition.
Subtask 28-25-41-410-055-A ** ON A/C NOT FOR ALL
A. Close Access
(2) Install the refuel/defuel coupling cap (6).
(3) Install the access panel 522HB ( 622HB).
Subtask 28-25-41-410-055-B ** ON A/C NOT FOR ALL CAUTION:
MAKE SURE THAT THE HANDLE OF THE REFUEL COUPLING CAP POINTS AFT WHEN THE CAP IS CLOSED AND LOCKED.
(1) Make sure that the work area is clean and clear of tools and other items.(2) Install the refuel/defuel coupling cap (6).
(3) Install the access panel 522HB ( 622HB).
A. Close Access
(2) Install the refuel/defuel coupling cap (6).
(3) Install the access panel 622HB.
Subtask 28-25-41-865-051-A CAUTION:
MAKE SURE THAT THE HANDLE OF THE REFUEL COUPLING CAP POINTS AFT WHEN THE CAP IS CLOSED AND LOCKED.
(1) Make sure that the work area is clean and clear of tools and other items.(2) Install the refuel/defuel coupling cap (6).
(3) Install the access panel 622HB.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 28-25-41-942-054-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B01 |
| ** ON A/C ALL | |||
| 121VU | FLIGHT CONTROLS/SLT/CTL/SYS2 | 7CV | R21 |
C. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the access platform(s).
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Remove the safety barriers.
(2) Remove the access platform(s).
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Refuel/Defuel Coupling Cap 40QM/41QM.