Operational Check of LP Shut Off Valves including Operation by Individual Motors
TASK 28-24-00-710-803-A
Operational Check of LP Shut Off Valves including Operation by Individual Motors
Refer to the MPD TASK: 282400-02
OPERATIONAL CHECK OF LP SHUT OFF VALVES INCLUDING OPERATION BY INDIVIDUAL MOTORS
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 28-24-00-941-066-A
Subtask 28-24-00-710-058-A
Subtask 28-24-00-410-063-A
[Rev.10 from 2021]
2026.04.02 06:17:34 UTC
Operational Check of LP Shut Off Valves including Operation by Individual Motors
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
1. Reason for the Job- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
Refer to the MPD TASK: 282400-02
OPERATIONAL CHECK OF LP SHUT OFF VALVES INCLUDING OPERATION BY INDIVIDUAL MOTORS
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | AR | SAFETY BARRIER(S) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| 522 | OUTBOARD FIXED L.E STRUCTURE |
| 622 | OUTBOARD FIXED L.E STRUCTURE |
| FOR [10QG] (ACTUATOR-LP FUEL VALVE, ENG 2) | |
| 622AT, 622XB | |
| FOR [9QG] (ACTUATOR-LP FUEL VALVE, ENG 1) | |
| 522AT, 522XB | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 27-80-00-866-004-A | Extending the Slats on the Ground |
| TASK 27-80-00-866-005-A | Retracting the Slats on the Ground |
| TASK 28-00-00-910-001-A | Fuel Safety Procedures |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| FOR [10QG] (ACTUATOR-LP FUEL VALVE, ENG 2) | |
| TASK 57-41-37-000-003-A | Removal of the Access Panel |
| TASK 57-41-37-000-004-A | Removal of the Pressure Relief Panels |
| TASK 57-41-37-400-002-A | Installation of the Pressure Relief Panels |
| TASK 57-41-37-400-003-A | Installation of the Access Panel |
| FOR [9QG] (ACTUATOR-LP FUEL VALVE, ENG 1) | |
| TASK 57-41-37-000-003-A | Removal of the Access Panel |
| TASK 57-41-37-000-004-A | Removal of the Pressure Relief Panels |
| TASK 57-41-37-400-002-A | Installation of the Pressure Relief Panels |
| TASK 57-41-37-400-003-A | Installation of the Access Panel |
Subtask 28-24-00-941-066-A
A. Safety Precautions
(2) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's instructions and your local regulations.
Subtask 28-24-00-860-080-A WARNING:
OBEY THE FUEL SAFETY PROCEDURES.
(1) You must obey the fuel safety procedures when you do work on the fuel system (Ref. AMM TASK 28-00-00-910-001). (2) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's instructions and your local regulations.
B. Aircraft Maintenance Configuration
(1) On panel 20VU, make sure that ENG 1 and ENG 2 FIRE P/BSWs are in the closed and guarded position.
(2) On panel 115VU, make sure that ENG/MASTER 1 and ENG/MASTER 2 switches are in the OFF position.
(3) Put a WARNING NOTICE(S) in position on panel 20VU, to tell persons not to operate ENG 1 and ENG 2 FIRE P/BSWs.
(4) Put a WARNING NOTICE(S) in position on panel 115VU, to tell persons not to operate ENG/MASTER 1 and ENG/MASTER 2 switches.
(5) Fully extend the slats (Ref. AMM TASK 27-80-00-866-004).
(6) Make sure that the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is installed on the slat/flap control lever.
(7) Put a WARNING NOTICE(S) in position to tell persons not to operate the slats.
(8) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(9) Do the EIS start procedure (ECAM only) (Ref. AMM TASK 31-60-00-860-001).
(10) On ECAM Control Panel (CP) 11VU, push (in) the FUEL P/BSW to get the FUEL page on the ECAM lower DU.
(11) On the FUEL page, make sure that the crossfeed valve indication shows green cross-line (valve closed).
Subtask 28-24-00-865-085-A (1) On panel 20VU, make sure that ENG 1 and ENG 2 FIRE P/BSWs are in the closed and guarded position.
(2) On panel 115VU, make sure that ENG/MASTER 1 and ENG/MASTER 2 switches are in the OFF position.
(3) Put a WARNING NOTICE(S) in position on panel 20VU, to tell persons not to operate ENG 1 and ENG 2 FIRE P/BSWs.
(4) Put a WARNING NOTICE(S) in position on panel 115VU, to tell persons not to operate ENG/MASTER 1 and ENG/MASTER 2 switches.
(5) Fully extend the slats (Ref. AMM TASK 27-80-00-866-004).
(6) Make sure that the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is installed on the slat/flap control lever.
(7) Put a WARNING NOTICE(S) in position to tell persons not to operate the slats.
(8) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(9) Do the EIS start procedure (ECAM only) (Ref. AMM TASK 31-60-00-860-001).
(10) On ECAM Control Panel (CP) 11VU, push (in) the FUEL P/BSW to get the FUEL page on the ECAM lower DU.
(11) On the FUEL page, make sure that the crossfeed valve indication shows green cross-line (valve closed).
C. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 28-24-00-865-088-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | FUEL/LP VALVE/MOT1/ENG2 | 2QG | A09 |
| 49VU | FUEL/LP VALVE/MOT1/ENG1 | 1QG | A08 |
| 121VU | FUEL/LP VALVE/MOT2/ENG2 | 4QG | M26 |
| 121VU | FUEL/LP VALVE/MOT2/ENG1 | 3QG | M25 |
D. Open, safety and tag this(these) circuit breaker(s):
Subtask 28-24-00-010-061-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B01 |
| ** ON A/C ALL | |||
| 121VU | FLIGHT CONTROLS/SLT/CTL/SYS2 | 7CV | R21 |
E. Get Access
(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the applicable zone 522(622).
(2) Remove the applicable access panel:
(a) FOR [9QG] (ACTUATOR-LP FUEL VALVE, ENG 1)
Remove 522AT (Ref. AMM TASK 57-41-37-000-003) or 522XB (Ref. AMM TASK 57-41-37-000-004).
(b) FOR [10QG] (ACTUATOR-LP FUEL VALVE, ENG 2)
Remove 622AT (Ref. AMM TASK 57-41-37-000-003) or 622XB (Ref. AMM TASK 57-41-37-000-004).
4. Procedure(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the applicable zone 522(622).
(2) Remove the applicable access panel:
(a) FOR [9QG] (ACTUATOR-LP FUEL VALVE, ENG 1)
Remove 522AT (Ref. AMM TASK 57-41-37-000-003) or 522XB (Ref. AMM TASK 57-41-37-000-004).
(b) FOR [10QG] (ACTUATOR-LP FUEL VALVE, ENG 2)
Remove 622AT (Ref. AMM TASK 57-41-37-000-003) or 622XB (Ref. AMM TASK 57-41-37-000-004).
Subtask 28-24-00-710-058-A
A. Operational Check of LP Shut Off Valves including Operation by Individual Motors
(1) In the test that follows, on each operation of the LP valve:
(3) For valve 13QM, do this test:
5. Close-up(1) In the test that follows, on each operation of the LP valve:
- Make sure that the see/feel indicator operates smoothly from the valve open (valve closed) position to the valve closed (valve open) position.
- Make sure that the see/feel indicator marks are accurately aligned with the valve open position.
- Make sure that the see/feel indicator marks are at 90 deg (90 deg) to each other with the valve closed position.
| ACTION | RESULT |
|---|---|
1.On panel 121VU:
|
|
| | On the ECAM lower DU:
|
2.On LP-valve actuator 9QG:
|
|
3.On panel 115VU:
| On the ECAM lower DU:
|
4.On LP-valve actuator 9QG:
|
|
5.On panel 115VU:
| On the ECAM lower DU:
|
6.On LP-valve actuator 9QG:
|
|
7.On panel 121VU:
|
|
8.On panel 49VU:
|
|
| | On the ECAM lower DU:
|
9.On LP-valve actuator 9QG:
|
|
10.On panel 115VU:
| On the ECAM lower DU:
|
11.On LP-valve actuator 9QG:
|
|
12.On panel 115VU:
| On the ECAM lower DU:
|
13.On LP-valve actuator 9QG:
|
|
14.On panel 49VU:
|
|
| ACTION | RESULT |
|---|---|
1.On panel 121VU:
|
|
| | On the ECAM lower DU:
|
2.On LP-valve actuator 10QG:
|
|
3.On panel 115VU:
| On the ECAM lower DU:
|
4.On LP-valve actuator 10QG:
|
|
5.On panel 115VU:
| On the ECAM lower DU:
|
6.On LP-valve actuator 10QG:
|
|
7.On panel 121VU:
|
|
8.On panel 49VU:
|
|
| | On the ECAM lower DU:
|
9.On LP-valve actuator 10QG:
|
|
10.On panel 115VU:
| On the ECAM lower DU:
|
11.On LP-valve actuator 10QG:
|
|
12.On panel 115VU:
| On the ECAM lower DU:
|
13.On LP-valve actuator 10QG:
|
|
14.On panel 49VU:
|
|
Subtask 28-24-00-410-063-A
A. Close Access
(1) Install the applicable access panel:
(a) FOR [9QG] (ACTUATOR-LP FUEL VALVE, ENG 1)
Install 522AT (Ref. AMM TASK 57-41-37-400-003) or 522XB (Ref. AMM TASK 57-41-37-400-002).
(b) FOR [10QG] (ACTUATOR-LP FUEL VALVE, ENG 2)
Install 622AT (Ref. AMM TASK 57-41-37-400-003) or 622XB (Ref. AMM TASK 57-41-37-400-002).
Subtask 28-24-00-865-089-A (1) Install the applicable access panel:
(a) FOR [9QG] (ACTUATOR-LP FUEL VALVE, ENG 1)
Install 522AT (Ref. AMM TASK 57-41-37-400-003) or 522XB (Ref. AMM TASK 57-41-37-400-002).
(b) FOR [10QG] (ACTUATOR-LP FUEL VALVE, ENG 2)
Install 622AT (Ref. AMM TASK 57-41-37-400-003) or 622XB (Ref. AMM TASK 57-41-37-400-002).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 28-24-00-860-081-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B01 |
| ** ON A/C ALL | |||
| 121VU | FLIGHT CONTROLS/SLT/CTL/SYS2 | 7CV | R21 |
C. Aircraft Maintenance Configuration
(1) Fully retract the slats (Ref. AMM TASK 27-80-00-866-005).
(2) On the ECAM lower DU, make sure that the LP valves are closed.
(3) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
Subtask 28-24-00-942-064-A (1) Fully retract the slats (Ref. AMM TASK 27-80-00-866-005).
(2) On the ECAM lower DU, make sure that the LP valves are closed.
(3) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
D. Removal of Equipment
(1) Remove the SAFETY BARRIERS.
(2) Remove the access platform(s).
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Remove the SAFETY BARRIERS.
(2) Remove the access platform(s).
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Component Location - Cockpit