W DOC AIRBUS | AMM A320F

Installation of the Vent and Drain Valve


TASK 28-22-43-400-801-A
Installation of the Vent and Drain Valve


WARNING: OBEY THE FUEL SAFETY PROCEDURES.
WARNING: MAKE SURE THAT THE SAFETY DEVICES AND THE WARNING NOTICES ARE IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING: BE CAREFUL NOT TO GET AIRCRAFT FUEL IN YOUR MOUTH OR IN YOUR EYES. IF YOU GET FUEL ON YOUR SKIN OR ON YOUR CLOTHES, FLUSH IT IMMEDIATELY WITH WATER. IF NECESSARY, GET MEDICAL HELP. AIRCRAFT FUEL IS POISONOUS.
WARNING: MAKE SURE THAT YOU HAVE THE CORRECT FIRE FIGHTING EQUIPMENT AVAILABLE.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 315
ZONE: 316
FIN: 5040QM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
No specific
AR
CONTAINER 5 L (1.32 USGAL)
No specific
AR
PLUG - BLANKING, PLASTIC
No specific
1
WARNING NOTICE(S)
No specific
Torque wrench: range to between 5.31 and 4.86 m.daN (39.16 and 35.84 lbf.ft ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03FAB1)
Mineral Oil base Grease-- Vaseline or Petrolatum -
(Material No.03QBA1)
Dry lubricant-General Assembly - -
(Material No.08BJP1)
Non Aqueous Cleaner-Turbine Engine Naphtha and hexane -
(Material No.14QFB1)
Wire-Locking Dia: 0.8 mm CRES Nickel Alloy -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
315
TAIL CONE APU AND ACCESSORY COMPARTMENT
316
TAIL CONE APU AND ACCESSORY COMPARTMENT
315AL, 316AR
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
1
O-RING
AIPC 28-22-04-11-260
1
O-RING
AIPC 28-22-84-11-310
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 28-00-00-910-001-A
Fuel Safety Procedures
TASK 28-22-00-710-001-A
Operational Test of the APU Fuel-Pump System on Ground to Purge the Fuel Line
TASK 49-31-00-710-002-A
Operational Test of the APU Fuel Low Pressure Circuit (APS 3200)
TASK 49-31-00-710-003-A
Operational Test of the APU-Fuel Low-Pressure Circuit ((131-9(A))
TASK 52-41-00-010-001-A
Open the APU Doors for Access
TASK 52-41-00-410-001-A
Close the APU Doors after Access
3. Job Set-up
Subtask 28-22-43-860-050-A
A. Aircraft Maintenance Configuration
   (1) When you do maintenance work on the fuel system you must obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
   (2) On the APU section of the overhead panel 25VU, make sure that the APU MASTER SW is in the off/released position (the ON legend is off).
   (3) On the FUEL overhead panel 40VU, make sure that the L TK PUMPS and the R TK PUMPS pushbutton switches are released (the OFF legends are on).
   (4) Make sure that the WARNING NOTICE(S) are in position:
  • on the overhead panel 25VU, to tell persons not to push the APU MASTER SW,
  • on the FUEL overhead panel 40VU, to tell persons not to operate the fuel system,
  • on the FIRE panel 25VU, to tell persons not to operate the APU fire extinguishing system.
   (5) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in position below the APU compartment.
   (6) Make sure that the APU access doors 315AL 316AR are open (Ref. AMM TASK 52-41-00-010-001).
   (7) Make sure that there is a CONTAINER 5 L (1.32 USGAL) under the vent and drain valve (2).
Subtask 28-22-43-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUAPU/FUEL/BLOW OFF/PUMP2QCB14
** ON A/C NOT FOR ALL
121VUAPU/FUEL/BLOW OFF/CTL1QCK39
** ON A/C ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
121VUAPU/FUEL/PUMP/CTL3QCM38
** ON A/C NOT FOR ALL
121VUAPU/FUEL/BLOW OFF/CTL1QCP38
4. Procedure
Subtask 28-22-43-420-050-A
A. Installation of the Vent and Drain Valve (5040QM).
   (1) Clean the component interfaces and the adjacent area.
   (2) Make sure that the component interfaces areas are clean and in the correct condition.
   (3) Remove the PLUG - BLANKING, PLASTIC from the vent and drain valve (2).
   (4) If necessary, clean the threads of the vent and drain valve (2) with the Non Aqueous Cleaner-Turbine Engine Naphtha and hexane - (Material No.08BJP1) . Dry them with a Textile-Lint free Cotton - (Material No.14SBA1) .
   (5) Examine the vent and drain valve (2). Make sure that the threads are in the correct condition.
NOTE: Replace the vent and drain valve if you find that the threads are not in the correct condition.
   (6) Apply Dry lubricant-General Assembly - - (Material No.03QBA1) on the threads of the vent and drain valve (2).
   (7) Apply a layer of Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) on a new AIPC 28-22-04-11-260 O-RING (1) or AIPC 28-22-84-11-310 O-RING (1).
   (8) Install the O-ring (1) on the vent and drain valve (2).
   (9) Install the vent and drain valve (2)
CAUTION: YOU MUST USE TWO WRENCHES AND HOLD THE COMPONENT WHEN YOU REMOVE/INSTALL THE PIPE COUPLINGS AND/OR UNIONS. THIS PREVENTS DAMAGE TO THE COMPONENT.
   (10) TORQUE the vent and drain valve (2) to between 5.31 and 4.86 m.daN (39.16 and 35.84 lbf.ft )
T.
WARNING: USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
   (11) Safety the vent and drain valve (2) with 14QFB1Wire-Locking Dia: 0.8 mm CRES Nickel Alloy -.
   (12) Install the blanking plug (3) on the vent and drain valve (2) and tighten it with your hands.
Subtask 28-22-43-865-052-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUAPU/FUEL/BLOW OFF/PUMP2QCB14
** ON A/C NOT FOR ALL
121VUAPU/FUEL/BLOW OFF/CTL1QCK39
** ON A/C ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
121VUAPU/FUEL/PUMP/CTL3QCM38
** ON A/C NOT FOR ALL
121VUAPU/FUEL/BLOW OFF/CTL1QCP38
Subtask 28-22-43-790-050-A
C. Leak Test
   (1) Do the operational test of the APU fuel-pump system on ground to purge the fuel line (
Ref. AMM TASK 28-22-00-710-001).
   (2) Do the operational test of the APU fuel low pressure circuit
   (3) Examine the connections for leaks.
NOTE: Leaks are not permitted.
5. Close-up
Subtask 28-22-43-410-050-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the APU access doors 315AL 316AR (Ref. AMM TASK 52-41-00-410-001).
   (3) Remove the access platform(s).
   (4) Remove the WARNING NOTICE(S).
   (5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.