W DOC AIRBUS | AMM A320F

Installation of the Check Valve of the Fuel Pump Canister


TASK 28-21-52-400-004-A
Installation of the Check Valve of the Fuel Pump Canister


WARNING: THIS PROCEDURE USES A FUEL SYSTEM ITEM THAT IS IN A CATEGORY KNOWN AS A CRITICAL DESIGN CONFIGURATION CONTROL LIMITATION (CDCCL). CDCCL IDENTIFIES AN ITEM THAT CAN BE THE SOURCE OF A POSSIBLE FUEL TANK IGNITION. YOU MUST KEEP ALL CDCCL ITEMS IN THE APPROVED CONFIGURATION. DAMAGE, WEAR OR CHANGES TO A CDCCL ITEM CAN CAUSE A POSSIBLE FUEL TANK EXPLOSION.
WARNING: MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the Job
Self Explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
SAFETY BARRIER(S)
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 22 and 18 lbf.in (0.25 and 0.20 m.daN ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03HBD9)
Synthetic Ester base Grease-General Purpose Low Temp -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
195BB, 196BB
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
5
O-RING
AIPC 28-21-52-01-100
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 12-11-28-650-003-A
Pressure Refuel with Automatic Control
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 28-00-00-910-001-A
Fuel Safety Procedures
TASK 28-21-00-710-007-A
Operational Test of the Main Fuel-Pump System with Fuel Flow by Transfer
TASK 28-21-51-000-001-A
Removal of the Fuel Pumps
TASK 28-21-51-000-002-A
Removal of the Fuel Pumps
TASK 28-21-51-400-001-A
Installation of the Fuel Pumps
TASK 28-21-51-400-002-A
Installation of the Fuel Pumps
TASK 28-25-00-650-001-A
Pressure Defuel
TASK 28-25-00-869-001-A
Fuel Transfer
3. Job Set-up
Subtask 28-21-52-941-065-A
A. Safety Precautions
WARNING: OBEY THE FUEL SAFETY PROCEDURES.
   (1) You must obey the fuel safety procedures when you do work on the fuel system (Ref. AMM TASK 28-00-00-910-001).
   (2) Make sure that the SAFETY BARRIER(S) are in position.
   (3) Make sure that the WARNING NOTICE(S) are in position to tell persons not to operate the fuel system.
Subtask 28-21-52-860-053-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) Make sure that the applicable wing tank has been defueled (Ref. AMM TASK 28-25-00-650-001), or the fuel has been transferred (Ref. AMM TASK 28-25-00-869-001).
   (2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position below the applicable fuel pump.
   (3) Make sure that the applicable fuel pump has been removed (Ref. AMM TASK 28-21-51-000-001).
Subtask 28-21-52-860-053-B ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position below the applicable fuel pump.
   (2) For the wing tank fuel pump canister check valves:
     (a) Make sure that the applicable wing tank has been defueled (Ref. AMM TASK 28-25-00-650-001), or the fuel has been transferred (Ref. AMM TASK 28-25-00-869-001).
   (3) Make sure that the applicable fuel pump has been removed (Ref. AMM TASK 28-21-51-000-001).
   (4) For the center-tank fuel pump canister 84QM check valve:
     (a) Make sure that the LH wing tank has been defueled (Ref. AMM TASK 28-25-00-650-001), or the fuel has been transferred (Ref. AMM TASK 28-25-00-869-001).
     (b) Make sure that the access panel 195BB is open.
     (c) Make sure that the applicable fuel pump has been removed (Ref. AMM TASK 28-21-51-000-002).
   (5) For the center-tank fuel pump canister 85QM check valve:
     (a) Make sure that the RH wing tank has been defueled (Ref. AMM TASK 28-25-00-650-001), or the fuel has been transferred (Ref. AMM TASK 28-25-00-869-001).
     (b) Make sure that the access panel 196BB is open.
     (c) Make sure that the applicable fuel pump has been removed (Ref. AMM TASK 28-21-51-000-002).
Subtask 28-21-52-865-059-A
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUFUEL/CTR TK/PUMP2 SPLY30QAP26
121VUFUEL/CTR TK/PUMP1 SPLY29QAP23
** ON A/C ALL
121VUFUEL/L WING TK/PUMP2 SPLY7QAN26
121VUFUEL/L WING TK/PUMP1 SPLY1QAN23
121VUFUEL/R WING TK/PUMP2 SPLY8QAQ26
121VUFUEL/R WING TK/PUMP1 SPLY2QAQ23
123VUL WING TK/PUMP 1/STBY SPLY11QAAD12
123VUR WING TK/PUMP 1/STBY SPLY12QAAE12
4. Procedure
Subtask 28-21-52-420-059-A
A. Preparation for Installation
   (1) Clean the component interfaces and/or the adjacent areas with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (4) Lubricate the new AIPC 28-21-52-01-100 O-RING (5) with Synthetic Ester base Grease-General Purpose Low Temp - (Material No.03HBD9) .
Subtask 28-21-52-420-060-A
B. Installation of the Check Valve of the Fuel Pump Canister
   (1) Install the new O-ring (5) on the check valve (4).
   (2) Put the check valve (4) in position in the canister (1).
   (3) Install the four washers (3) if applicable and the four screws (2) (Ref. AMM TASK 20-28-00-912-802).
NOTE: The washers (3) are installed on canisters with part number series 568-1-27203-xxx and 568-1-27244-xxx.
The washers (3) are not installed on canisters with part number series C93R38-6xx.
   (4) Bonding check:
WARNING: THIS INSTRUCTION IS APPLICABLE TO A CRITICAL DESIGN CONFIGURATION CONTROL LIMITATION (CDCCL) ITEM. CAREFULLY OBEY ALL GIVEN INSTRUCTIONS WHEN YOU DO THIS STEP. IF YOU DO NOT OBEY THESE INSTRUCTIONS, A DANGEROUS CONDITION CAN OCCUR THAT CAN CAUSE A POSSIBLE FUEL TANK EXPLOSION.
     (a) Do a bonding check (Ref. AMM TASK 20-28-00-912-802).
   (5) TORQUE the screws (2) to between 22 and 18 lbf.in (0.25 and 0.20 m.daN ) T.
Subtask 28-21-52-410-054-A ** ON A/C NOT FOR ALL Subtask 28-21-52-410-054-B ** ON A/C NOT FOR ALL
C. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) For the check valve of the wing-tank fuel pump canisters:
     (a) Install the applicable fuel pump (Ref. AMM TASK 28-21-51-400-001).
   (3) For the check valve of the center-tank fuel pump canisters:
     (a) Install the applicable fuel pump (Ref. AMM TASK 28-21-51-400-002).
     (b) Close the applicable access panel 195BB 196BB.
Subtask 28-21-52-865-060-A
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUFUEL/CTR TK/PUMP2 SPLY30QAP26
121VUFUEL/CTR TK/PUMP1 SPLY29QAP23
** ON A/C ALL
121VUFUEL/L WING TK/PUMP2 SPLY7QAN26
121VUFUEL/L WING TK/PUMP1 SPLY1QAN23
121VUFUEL/R WING TK/PUMP2 SPLY8QAQ26
121VUFUEL/R WING TK/PUMP1 SPLY2QAQ23
123VUL WING TK/PUMP 1/STBY SPLY11QAAD12
123VUR WING TK/PUMP 1/STBY SPLY12QAAE12
Subtask 28-21-52-860-057-A
E. Fuel Configuration
   (1) Refuel, defuel or transfer fuel as necessary (Ref. AMM TASK 12-11-28-650-003), (Ref. AMM TASK 28-25-00-650-001) or (Ref. AMM TASK 28-25-00-869-001).
Subtask 28-21-52-710-050-A
F. Test
   (1) Do an operational test of the applicable main fuel pump system (Ref. AMM TASK 28-21-00-710-007).
5. Close-up
Subtask 28-21-52-942-056-A
A. Removal of Equipment
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the safety barriers
   (3) Remove the access platform(s).
   (4) Remove the WARNING NOTICE(S).
   (5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.