W DOC AIRBUS | AMM A320F

Installation of the Sequence Valve


TASK 28-21-45-400-003-A
Installation of the Sequence Valve


WARNING: MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 3M (10 FT)
No specific
AR
SAFETY BARRIER(S)
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
99A28404000000
1
ADAPTOR-SEQUENCE VALVE
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.01ABA1)
Turbine Fuel-- Kerosene -
(Material No.03FAB1)
Mineral Oil base Grease-- Vaseline or Petrolatum -
(Material No.06ABB1)
Polysulfide Sealant-Fuel Tank Fillet -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
540AB, 540BZ, 640AB, 640BZ
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
1
O-RING
AIPC 28-21-05-31-030
2
O-RING
AIPC 28-21-45-01-040
6
O-RING
AIPC 28-21-45-01-070
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 12-11-28-650-003-A
Pressure Refuel with Automatic Control
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 28-10-00-910-001-A
Safety Procedures When You Do Work in a Fuel Tank
TASK 28-10-00-910-002-A
Access to the Fuel Tanks and the Work Areas
TASK 28-21-15-000-003-A
Removal of the Fuel-Pump Pressure-Switch
TASK 28-21-15-400-001-A
Installation of the Fuel-Pump Pressure-Switch
TASK 28-25-00-650-001-A
Pressure Defuel
TASK 28-25-00-650-003-A
To Drain Remaining Fuel from the Wing Tanks and the Center Tank
TASK 28-25-00-650-003-A-01
To Drain Remaining Fuel from the Wing Tanks and the Center Tank
TASK 57-27-11-000-001-A
Removal of the Access Panel
TASK 57-27-11-400-001-A
Installation of the Access Panel
3. Job Set-up
Subtask 28-21-45-941-053-A ** ON A/C NOT FOR ALL
A. Safety Precautions
WARNING: BEFORE YOU DO WORK IN OR NEAR A FUEL TANK, MAKE SURE THAT YOU OBEY ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT.
   (1) You must obey the fuel safety procedures (Ref. AMM TASK 28-10-00-910-001) when you do work in a fuel tank.
   (2) Make sure that the SAFETY BARRIER(S) are in position.
Subtask 28-21-45-865-055-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUFUEL/L WING TK/PUMP2 SPLY7QAN26
121VUFUEL/L WING TK/PUMP1 SPLY1QAN23
121VUFUEL/R WING TK/PUMP2 SPLY8QAQ26
121VUFUEL/R WING TK/PUMP1 SPLY2QAQ23
123VUL WING TK/PUMP 1/STBY SPLY11QAAD12
123VUR WING TK/PUMP 1/STBY SPLY12QAAE12
Subtask 28-21-45-860-052-A ** ON A/C NOT FOR ALL
C. Aircraft Maintenance Configuration
   (1) Make sure that the applicable fuel tank is defueled (Ref. AMM TASK 28-25-00-650-001).
   (2) Make sure that the remaining fuel has been drained from the applicable fuel tank (Ref. AMM TASK 28-25-00-650-003).
   (3) Make sure that the ACCESS PLATFORM 3M (10 FT) is below the applicable access door 540AB(640AB).
   (4) Make sure that the applicable access panel is removed 540AB(640AB) (Ref. AMM TASK 28-10-00-910-002), (Ref. AMM TASK 57-27-11-000-001).
   (5) Make sure that the applicable surge door 540BZ(640BZ) is held open with the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS).
4. Procedure
Subtask 28-21-45-420-058-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
   (1) Clean the component interfaces and the adjacent areas with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
   (2) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (3) Do an inspection of the component interfaces and the adjacent area.
   (4) Lubricate the new O-rings (1), (2) and (6) with Turbine Fuel-- Kerosene - (Material No.01ABA1) or Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) .
Subtask 28-21-45-420-054-A ** ON A/C NOT FOR ALL Subtask 28-21-45-410-051-A ** ON A/C NOT FOR ALL
C. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) and carefully close the applicable surge door 540BZ 640BZ.
   (3) Install the applicable access panel 540AB 640AB (Ref. AMM TASK 57-27-11-400-001).
Subtask 28-21-45-860-050-A ** ON A/C NOT FOR ALL
D. Preparation for Test
F Sequence Valves Test Equipment ** ON A/C NOT FOR ALL
   (1) Remove the applicable pressure switch (Ref. AMM TASK 28-21-15-000-003):

  • for the sequence valve on the canister 1QM, remove the pressure switch 23QA

  • for the sequence valve on the canister 2QM, remove the pressure switch 27QA

  • for the sequence valve on the canister 3QM, remove the pressure switch 24QA

  • for the sequence valve on the canister 4QM, remove the pressure switch 28QA.
   (2) Install the 99A28404000000 ADAPTOR-SEQUENCE VALVE to the sealing valve where the pressure switch was attached. Use the pressure switch plug and O-rings.
   (3) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
Subtask 28-21-45-865-056-A ** ON A/C NOT FOR ALL
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUFUEL/L WING TK/PUMP2 SPLY7QAN26
121VUFUEL/L WING TK/PUMP1 SPLY1QAN23
121VUFUEL/R WING TK/PUMP2 SPLY8QAQ26
121VUFUEL/R WING TK/PUMP1 SPLY2QAQ23
Subtask 28-21-45-650-053-A ** ON A/C NOT FOR ALL
F. Aircraft Maintenance Configuration
   (1) Refuel the applicable wing tank to approximately 750 kg (1653.4665 lb) (Ref. AMM TASK 12-11-28-650-003).
Subtask 28-21-45-720-050-A ** ON A/C NOT FOR ALL
G. Test of the Sequence Valve
   (1) Do this test:
ACTION
RESULT
1.On the panel 40VU:

  • push the applicable TK PUMPS pushbutton switch (P/BSW).
  • the applicable P/BSW OFF legend goes off.
2.On the pressure gage:
  • make sure that the indication on the pressure gage becomes stable between 1.62 bar (23.50 psi) and 1.83 bar (26.50 psi).
3.On the panel 40VU:

  • push the applicable TK PUMPS P/BSW.
  • the applicable P/BSW OFF legend comes on.
5. Close-up
Subtask 28-21-45-865-057-A ** ON A/C NOT FOR ALL
A. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUFUEL/L WING TK/PUMP2 SPLY7QAN26
121VUFUEL/L WING TK/PUMP1 SPLY1QAN23
121VUFUEL/R WING TK/PUMP2 SPLY8QAQ26
121VUFUEL/R WING TK/PUMP1 SPLY2QAQ23
123VUL WING TK/PUMP 1/STBY SPLY11QAAD12
123VUR WING TK/PUMP 1/STBY SPLY12QAAE12
Subtask 28-21-45-860-051-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
   (2) Remove the 99A28404000000 ADAPTOR-SEQUENCE VALVE.
   (3) Install the applicable pressure switch (Ref. AMM TASK 28-21-15-400-001).
   (4) Make sure that the work area is clean and clear of tools and other items.
Subtask 28-21-45-865-058-A ** ON A/C NOT FOR ALL
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUFUEL/L WING TK/PUMP2 SPLY7QAN26
121VUFUEL/L WING TK/PUMP1 SPLY1QAN23
121VUFUEL/R WING TK/PUMP2 SPLY8QAQ26
121VUFUEL/R WING TK/PUMP1 SPLY2QAQ23
123VUL WING TK/PUMP 1/STBY SPLY11QAAD12
123VUR WING TK/PUMP 1/STBY SPLY12QAAE12
Subtask 28-21-45-942-051-A ** ON A/C NOT FOR ALL
D. Removal of Equipment
   (1) Remove the safety barriers.
   (2) Remove the WARNING NOTICE(S).
   (3) Remove the access platform(s).
   (4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.