General Visual Inspection of Wiring Harnesses Above Center Tank (SFAR88)
TASK 28-18-42-210-001-A
General Visual Inspection of Wiring Harnesses Above Center Tank (SFAR88)
1. Reason for the Job
Refer to the MPD TASK: 281800-06
GENERAL VISUAL INSPECTION OF WIRING HARNESSES ABOVE CENTER TANK (SFAR88)
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 28-18-42-010-050-A
Subtask 28-18-42-210-050-A
Subtask 28-18-42-862-050-A
[Rev.10 from 2021]
2026.04.02 06:17:19 UTC
General Visual Inspection of Wiring Harnesses Above Center Tank (SFAR88)
1. Reason for the Job
Refer to the MPD TASK: 281800-06
GENERAL VISUAL INSPECTION OF WIRING HARNESSES ABOVE CENTER TANK (SFAR88)
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 145 | PRESS ZONE BETW WING CTR BOX MAIN GEAR |
| 146 | PRESS ZONE BETW WING CTR BOX MAIN GEAR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 52-10-00-010-001-A | Opening of the Passenger/Crew Door |
| TASK 52-10-00-410-001-A | Closing of the Passenger/Crew Door |
| TASK 53-32-12-000-002-A | Removal of the Cabin Floor Panels |
| TASK 53-32-12-400-002-A | Installation of the Cabin Floor Panels |
| ESPM 205211 |
Subtask 28-18-42-010-050-A
A. Get Access
(1) Put an ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position at the passenger/crew door 831(841).
(2) Open the passenger/crew door 831(841) (Ref. AMM TASK 52-10-00-010-001).
(3) Remove the floor panels in the cabin from FR36 to FR46 (Ref. AMM TASK 53-32-12-000-002).
Subtask 28-18-42-861-050-A (1) Put an ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position at the passenger/crew door 831(841).
(2) Open the passenger/crew door 831(841) (Ref. AMM TASK 52-10-00-010-001).
(3) Remove the floor panels in the cabin from FR36 to FR46 (Ref. AMM TASK 53-32-12-000-002).
B. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
4. Procedure(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 28-18-42-210-050-A
A. Visual Inspection
(1) Do a visual inspection of the wiring above the center tank between FR36 and FR42 ESPM 205211.
(2) Make sure that there is no damage on the wiring.
5. Close-up(1) Do a visual inspection of the wiring above the center tank between FR36 and FR42 ESPM 205211.
(2) Make sure that there is no damage on the wiring.
Subtask 28-18-42-862-050-A
A. Aircraft Maintenance Configuration
(1) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
Subtask 28-18-42-410-050-A (1) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the floor panels in the cabin from FR36 to FR46 (Ref. AMM TASK 53-32-12-400-002).
(3) Close the passenger/crew door 831(841) (Ref. AMM TASK 52-10-00-410-001).
(4) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the floor panels in the cabin from FR36 to FR46 (Ref. AMM TASK 53-32-12-400-002).
(3) Close the passenger/crew door 831(841) (Ref. AMM TASK 52-10-00-410-001).
(4) Remove the access platform(s).