W DOC AIRBUS | AMM A320F

General Visual Inspection of the Protective Shield between the Fuel Recirculation Return-Line and the Bleed-Air Pressure Sensors


TASK 28-18-00-210-801-A
General Visual Inspection of the Protective Shield between the Fuel Recirculation Return-Line and the Bleed-Air Pressure Sensors


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
ZONE: 410
ZONE: 420
1. Reason for the Job
Refer to the MPD TASK: 281800-12
VISUAL CHECK OF THE PROTECTIVE SHIELD BETWEEN THE FUEL RECIRCULATION RETURN LINE AND THE BLEED AIR PRESSURE SENSORS
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
No specific
1
LIGHT SOURCE - TORCH
No specific
AR
SAFETY BARRIER(S)
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
410
ENG 1 PYLON BOX AND FORWARD FAIRING
420
ENG 2 PYLON BOX AND FORWARD FAIRING
415BL, 425BL
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 28-00-00-910-001-A
Fuel Safety Procedures
TASK 54-51-21-000-802-A
Removal of the Pylon Lateral Access-Doors
TASK 54-51-21-400-802-A
Installation of the Pylon Lateral Access-Doors
3. Job Set-up
Subtask 28-18-00-941-054-A ** ON A/C NOT FOR ALL
A. Safety Precautions
WARNING: OBEY THE FUEL SAFETY PROCEDURES.
   (1) You must obey the fuel safety procedures when you do work near the fuel system (Ref. AMM TASK 28-00-00-910-001).
   (2) On the center pedestal, on ENG panel 115VU:
     (a) Put a WARNING NOTICE(S) in position to tell persons not to start the engines.
   (3) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's instructions and your local regulations.
Subtask 28-18-00-010-057-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position:
     (a) For the left pylon, below zone 415.
     (b) For the right pylon, below zone 425.
   (2) Remove the pylon lateral access-door (Ref. AMM TASK 54-51-21-000-802):
     (a) For the left pylon:
     (b) For the right pylon:
   (3) Use a LIGHT SOURCE - TORCH for the inspection.
4. Procedure
Subtask 28-18-00-210-053-A ** ON A/C NOT FOR ALL
A. General Visual Inspection of the Protective Shield between the Fuel Recirculation Return-Line and the Bleed-Air Pressure Sensors
   (1) Do a general visual inspection of the protective shield and make sure that:
  • There is no damage
  • There are no dents
  • There are no cracks
  • They are installed in the correct condition
  • They are correctly attached.
5. Close-up
Subtask 28-18-00-410-057-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the pylon lateral access-door (Ref. AMM TASK 54-51-21-400-802):
     (a) For the left pylon:
     (b) For the right pylon:
Subtask 28-18-00-942-054-A ** ON A/C NOT FOR ALL
B. Removal of Equipment
   (1) Remove the safety barriers.
   (2) Remove the access platform(s).
   (3) Remove the WARNING NOTICE(S).
   (4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
[Rev.10 from 2021] 2026.04.02 06:17:19 UTC