Detailed Inspection of Tank Bonding Leads (SFAR88)


TASK 28-18-00-200-002-A
Detailed Inspection of Tank Bonding Leads (SFAR88)


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
ZONE: 140
ZONE: 540
ZONE: 550
ZONE: 640
ZONE: 650
1. Reason for the Job
Refer to the MPD TASK: 281800-03
DETAILED INSPECTION OF TANK BONDING LEADS (SFAR88)
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
No specific
1
LIGHT SOURCE - SPARK-PROOF
No specific
1
MIRROR - INSPECTION, FLEXIBLE
No specific
1
SAFETY BARRIER(S)
No specific
1
WARNING NOTICE(S)
98D27803500001
1
LOCKING TOOL ZERO POS
98D57004013000
1
HOOK-COVER (RIB 2 SURGE DOORS)
98D57004014000
1
HOOK-COVER (RIB2-SURGE DOORS)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
140
CENTER WING
540
FUEL TANK
550
VENT SURGE TANK
640
FUEL TANK
650
VENT SURGE TANK
147AZ, 148AZ, 540AB, 540BB, 540CB, 540DB, 540EB, 540FB, 540GB, 540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 640AB, 640BB, 640CB, 640DB, 640EB, 640FB, 640GB, 640HB, 640JB, 640KB, 640LB, 640MB, 640NB, 640PB, 640QB, 640RB, 650AB, 650BB, 650CB, 650DB
540AZ, 540BZ, 640AZ, 640BZ
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 12-11-28-650-003-A
Pressure Refuel with Automatic Control
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 28-10-00-910-001-A
Safety Procedures When You Do Work in a Fuel Tank
TASK 28-10-00-910-002-A
Access to the Fuel Tanks and the Work Areas
TASK 28-25-00-650-001-A
Pressure Defuel
TASK 28-25-00-650-003-A
To Drain Remaining Fuel from the Wing Tanks and the Center Tank
TASK 28-25-00-650-003-A-01
To Drain Remaining Fuel from the Wing Tanks and the Center Tank
TASK 57-17-11-000-001-A
Removal of Access Cover 147AZ(148AZ)
TASK 57-17-11-400-001-A
Installation of Access Cover 147AZ(148AZ)
TASK 57-27-11-000-001-A
Removal of the Access Panel
TASK 57-27-11-000-002-A
Removal of the Access Panel
TASK 57-27-11-400-001-A
Installation of the Access Panel
TASK 57-27-11-400-002-A
Installation of the Access Panel
TASK 57-27-12-000-002-A
Removal of the Rib 2 Access Panel 540AZ(640AZ) or 540BZ(640BZ)
TASK 57-27-12-400-002-A
Installation of the Rib 2 Access Panel 540AZ (640AZ) or 540BZ (640BZ)
3. Job Set-up
Subtask 28-18-00-941-052-A ** ON A/C NOT FOR ALL
A. Safety Precautions
WARNING: BEFORE YOU DO WORK IN OR NEAR A FUEL TANK, MAKE SURE THAT YOU OBEY ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT.
   (1) You must obey the fuel safety procedures when you do work in a fuel tank (Ref. AMM TASK 28-10-00-910-001).
   (2) Put the SAFETY BARRIER(S) in position.
   (3) Put a WARNING NOTICE(S) in the cockpit to tell persons not to operate the flaps or slats.
   (4) Install the 98D27803500001 LOCKING TOOL ZERO POS on the flap/slat control lever.
Subtask 28-18-00-860-050-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) Defuel the applicable fuel tanks (Ref. AMM TASK 28-25-00-650-001).
   (2) Drain the remaining fuel from the applicable fuel tanks (Ref. AMM TASK 28-25-00-650-003).
Subtask 28-18-00-010-052-B ** ON A/C NOT FOR ALL
C. Get Access
   (1) Remove the applicable access panels:
     (a) For the LH wing remove:
     (b) For the RH wing remove:
     (c) For the center tank remove:
   (2) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the applicable zone 540(640).
   (3) Open the fuel-surge access doors on Rib 2 as follows:
     (a) Open the FWD fuel-surge door 540AZ(640AZ) and hold it in position with the 98D57004013000 HOOK-COVER (RIB 2 SURGE DOORS).
     (b) Open the AFT fuel-surge door 540BZ(640BZ) and hold it in position with the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS).
Subtask 28-18-00-010-052-D ** ON A/C NOT FOR ALL
C. Get Access
   (1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the applicable zone 540 (640).
   (2) Remove the applicable access panels:
     (a) For the left wing:
     (b) For the right wing:
     (c) For the center tank:
   (3) Remove the applicable RIB2 access panels:
     (a) For the left wing:
     (b) For the right wing:
4. Procedure
Subtask 28-18-00-210-051-B ** ON A/C NOT FOR ALL
A. Detailed Inspection of the Tank Bonding Leads
   (1) Examine all the bonding leads in each wing tank and the center tank as follows:
     (a) Use a LIGHT SOURCE - SPARK-PROOF and MIRROR - INSPECTION, FLEXIBLE to make sure that all the bonding leads are correctly installed.
     (b) Carefully examine all the bonding leads and make sure that:
  • They are not broken
  • There are no broken strands
  • The outer braid sheaths are not loose in the end crimps
  • There is no sign of damage or corrosion.
NOTE: It is not important to replace the bonding leads that shows signs of tarnish.
     (c) Carefully pull each bonding lead to make sure that the end crimps are correctly attached.
     (d) Make sure that the bonding lead connections are in good condition.
   (2) Replace all the defective bonding leads (Ref. AMM TASK 20-28-00-912-802) and (Ref. AMM TASK 20-28-00-912-802).
5. Close-up
Subtask 28-18-00-410-052-B ** ON A/C NOT FOR ALL
A. Close Access
   (1) Remove the 98D57004013000 HOOK-COVER (RIB 2 SURGE DOORS) and close the FWD fuel-surge door 540AZ(640AZ).
   (2) Remove the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) and close the AFT fuel-surge door 540BZ(640BZ).
   (3) Make sure that the work area is clean and clear of tool(s) and other items.
   (4) Install the applicable access panels:
     (a) For the LH wing install:
     (b) For the RH wing install:
     (c) For the center tank install:
Subtask 28-18-00-410-052-D ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the applicable RIB2 access panels:
     (a) For the left wing:
     (b) For the right wing:
   (3) Install the applicable access panels:
     (a) For the left wing:
     (b) For the right wing:
     (c) For the center tank:
Subtask 28-18-00-650-050-A ** ON A/C NOT FOR ALL
B. Fuel Configuration
   (1) Refuel the aircraft (Ref. AMM TASK 12-11-28-650-003).
Subtask 28-18-00-942-052-A ** ON A/C NOT FOR ALL
C. Removal of Equipment
   (1) Remove the safety barriers.
   (2) Remove the access platform(s).
   (3) Remove the 98D27803500001 LOCKING TOOL ZERO POS from the flap/slat control lever.
   (4) Remove the WARNING NOTICE(S).
   (5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.