Detailed Inspection of Vapour Seal (SFAR88)


TASK 28-18-00-200-001-A
Detailed Inspection of Vapour Seal (SFAR88)


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
ZONE: 191
ZONE: 192
1. Reason for the Job
Refer to the MPD TASK: 281800-02
DETAILED INSPECTION OF VAPOUR SEAL (SFAR88)
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
LIGHT SOURCE - INSPECTION
No specific
AR
MIRROR - INSPECTION
No specific
AR
SAFETY BARRIER(S)
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
191
AIR CONDITIONING COMPT AND FAIRINGS
192
AIR CONDITIONING COMPT AND FAIRINGS
191KB, 192KB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 21-20-00-010-001-A
Removal of the Air-Conditioning Distribution Ducts
TASK 21-20-00-410-001-A
Installation of the Air-Conditioning Distribution Ducts
TASK 21-51-41-000-001-A
Removal of the Ozone Filter
TASK 21-51-41-400-001-A
Installation of the Ozone Filter
TASK 21-51-51-000-001-A
Removal of the Pack Flow-Control Valve/ Pack Flow-Control Unit
TASK 21-51-51-400-001-A
Installation of the Pack Flow-Control Valve/Pack Flow-Control Unit
TASK 21-52-41-000-001-A
Removal of the Air Conditioning Pack
TASK 21-52-41-400-001-A
Installation of the Air Conditioning Pack
TASK 28-13-42-000-001-A
Removal of the Vapor Seal
TASK 28-13-42-400-001-A
Installation of the Vapor Seal
TASK 36-12-41-000-001-A
Removal of a Bleed-Air Duct
TASK 36-12-41-400-001-A
Installation of a Bleed-Air Duct
TASK 36-22-18-000-001-A
Removal of the Fuselage Overheat Sensing-Elements (Loop A and B)
TASK 36-22-18-400-001-A
Installation of the Fuselage Overheat Sensing-Elements (Loop A and B)
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
TASK 53-35-13-400-002-A
Installation of the Quick-Release Access Panels on the Belly Fairing Structure
TASK 28-13-42-300-001-A
Center-Tank Vapor-Seal-Membrane Repair (for corrective action)
3. Job Set-up
Subtask 28-18-00-941-051-A
A. Aircraft Maintenance Configuration
   (1) Put the SAFETY BARRIER(S) in position.
   (2) Put a WARNING NOTICE(S) in the cockpit to tell persons not to operate the air-conditioning system.
Subtask 28-18-00-865-050-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR COND/FLOW/CTL &/IND11HBD07
** ON A/C NOT FOR ALL
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
** ON A/C NOT FOR ALL
122VUAIR COND/FLOW/CTL AND IND/22HBV21
122VUAIR COND/PACK TEMP/CTL SYS1/2/115VAC21HHW22
122VUAIR COND/PACK TEMP/CTL SYS1/2/28VDC23HHW21
122VUAIR COND/PACK TEMP/CTL SYS1/1/115VAC1HHX22
122VUAIR COND/PACK TEMP/CTL SYS1/1/28VDC3HHX21
122VUAIR COND/PACK TEMP CTL SYS2/2/28VDC24HHY21
122VUAIR COND/PACK TEMP CTL SYS2/2/115VAC22HHY20
122VUAIR COND/PACK TEMP CTL SYS2/1/28VDC4HHY19
122VUAIR COND/PACK TEMP CTL SYS2/1/115VAC2HHY18
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
Subtask 28-18-00-010-051-A
C. Get Access
   (1) On the lower fuselage, remove access panel 191KB ( 192KB) to get access to the vapor seal location (Ref. AMM TASK 53-35-13-000-002).
   (2) If necessary, remove the components that follow:
     (a) Remove air conditioning-packs 10HM (11HM) from the aircraft (Ref. AMM TASK 21-52-41-000-001).
     (b) Remove pack flow-control-valves 8HB (11HB) from the aircraft (Ref. AMM TASK 21-51-51-000-001).
     (c) Remove ozone filter 100HM (101HM) (Ref. AMM TASK 21-51-41-000-001).
     (d) Remove the hot trim-air duct (Ref. AMM TASK 21-20-00-010-001).
     (e) Remove the overheat detection loops A and B from the heat shields and from the APU bleed-air ducts (Ref. AMM TASK 36-22-18-000-001).
     (f) Remove the APU bleed-air ducts (Ref. AMM TASK 36-12-41-000-001).
4. Procedure
Subtask 28-18-00-210-050-B
A. Detailed Inspection of Vapor Seal (Aircraft Fitted with a Center Tank)
   (1) Examine the vapor seal for tears, cracks, holes, scratches, deformation and wrinkled areas:
NOTE: Use a MIRROR - INSPECTION and a sufficient LIGHT SOURCE - INSPECTION for this inspection.
     (a) On the vapor seal, near to the heat shields above the Pack Flow-Control Valves:
       1 Make sure that the vapor seal has no wrinkled areas.
     (b) If you find wrinkled areas on the vapor seal, replace the vapor seal membrane (Ref. AMM TASK 28-13-42-000-001) and (Ref. AMM TASK 28-13-42-400-001).
NOTE: No repair is permitted for this damage.
NOTE: It is permitted to use a new vapor seal with signs of wrinkles on the top surface. The wrinkles can occur because of the storage conditions.
     (c) If you find deformation on the vapor seal, replace the vapor seal membrane (Ref. AMM TASK 28-13-42-000-001) and (Ref. AMM TASK 28-13-42-400-001).
NOTE: No repair is permitted for this damage.
     (d) Examine the upper seal for cracks:
       1 Do not remove the retainer during the inspection of the upper seal for cracks.
       2 Do an inspection of the upper seal on the adjacent area of the retainer.
     (e) Examine the lower seal for cracks:
       1 Do not remove the retainer during the inspection of the lower seal for cracks.
       2 Do an inspection of the lower seal on the adjacent area of the retainer.
NOTE: Some cracks on the lower seal found between membrane and retainers are permitted. These parts will have to be replaced at the subsequent vapor seal installation.
NOTE: Cracks on the lower seal are out of the permitted tolerance if:
  • Segments across the full width of the lower vapor seal fall off.
    This damage can cause the retainers to touch the vapor seal and can have an effect on all the vapor seal system.
   (2) If you find damage on the vapor seal or at the attachments, do the applicable repair procedure (Ref. AMM TASK 28-13-42-300-001).
5. Close-up
Subtask 28-18-00-410-051-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) If necessary, install the components that follow:
     (a) Install the APU bleed-air ducts to the center-tank lower surface (Ref. AMM TASK 36-12-41-400-001).
     (b) Install the overheat detection loops A and B on the heat shields and on the APU bleed-air ducts (Ref. AMM TASK 36-22-18-400-001).
     (c) Install the hot trim-air duct (Ref. AMM TASK 21-20-00-410-001).
     (d) Install ozone filters 100HM (101HM) (Ref. AMM TASK 21-51-41-400-001).
     (e) Install pack flow-control-valves 8HB (11HB) (Ref. AMM TASK 21-51-51-400-001).
     (f) Install air conditioning-packs 10HM (11HM) (Ref. AMM TASK 21-52-41-400-001).
   (3) Install access panel 191KB ( 192KB) to the aircraft (Ref. AMM TASK 53-35-13-400-002).
Subtask 28-18-00-865-051-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR COND/FLOW/CTL &/IND11HBD07
** ON A/C NOT FOR ALL
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
** ON A/C NOT FOR ALL
122VUAIR COND/FLOW/CTL AND IND/22HBV21
122VUAIR COND/PACK TEMP/CTL SYS1/2/115VAC21HHW22
122VUAIR COND/PACK TEMP/CTL SYS1/2/28VDC23HHW21
122VUAIR COND/PACK TEMP/CTL SYS1/1/115VAC1HHX22
122VUAIR COND/PACK TEMP/CTL SYS1/1/28VDC3HHX21
122VUAIR COND/PACK TEMP CTL SYS2/2/28VDC24HHY21
122VUAIR COND/PACK TEMP CTL SYS2/2/115VAC22HHY20
122VUAIR COND/PACK TEMP CTL SYS2/1/28VDC4HHY19
122VUAIR COND/PACK TEMP CTL SYS2/1/115VAC2HHY18
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
Subtask 28-18-00-942-051-A
C. Removal of Equipment
   (1) Remove the WARNING NOTICE(S).
   (2) Remove the safety barrier(s).
   (3) Make sure that the work area is clean and clear of tools and other items.