Installation of the Check Valves
TASK 28-16-42-400-002-A
Installation of the Check Valves
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 28-16-42-941-057-A ** ON A/C NOT FOR ALL
Subtask 28-16-42-420-053-A ** ON A/C NOT FOR ALL
Subtask 28-16-42-650-053-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:17:17 UTC
Installation of the Check Valves
WARNING:
MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 222QM ** ON A/C NOT FOR ALL
FIN: 223QM ** ON A/C NOT FOR ALL
FIN: 224QM ** ON A/C NOT FOR ALL
FIN: 225QM ** ON A/C NOT FOR ALL
1. Reason for the JobFIN: 223QM ** ON A/C NOT FOR ALL
FIN: 224QM ** ON A/C NOT FOR ALL
FIN: 225QM ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | AR | SAFETY BARRIER(S) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.01ABA1) | Turbine Fuel-- Kerosene - |
| (Material No.03FAB1) | Mineral Oil base Grease-- Vaseline or Petrolatum - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [222QM] (CHECK VALVE) | |
| FOR [224QM] (CHECK VALVE) | |
| 540AB, 540BZ | |
| FOR [223QM] (CHECK VALVE) | |
| FOR [225QM] (CHECK VALVE) | |
| 640AB, 640BZ | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 1 | O-RING | AIPC 28-16-05-18-190 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-11-28-650-003-A | Pressure Refuel with Automatic Control |
| TASK 28-10-00-910-001-A | Safety Procedures When You Do Work in a Fuel Tank |
| TASK 28-10-00-910-002-A | Access to the Fuel Tanks and the Work Areas |
| TASK 28-21-00-710-002-A | Operational Check of Wing Tank Pump Pressure Sense Line Check Valves |
| TASK 28-25-00-650-001-A | Pressure Defuel |
| TASK 28-25-00-650-003-A | To Drain Remaining Fuel from the Wing Tanks and the Center Tank |
| TASK 28-25-00-650-003-A-01 | To Drain Remaining Fuel from the Wing Tanks and the Center Tank |
| TASK 28-25-00-869-001-A | Fuel Transfer |
| TASK 57-27-11-000-001-A | Removal of the Access Panel |
| TASK 57-27-11-400-001-A | Installation of the Access Panel |
| FOR [222QM] (CHECK VALVE) | |
| FOR [224QM] (CHECK VALVE) | |
| TASK 28-10-00-910-002-A | Access to the Fuel Tanks and the Work Areas |
| TASK 57-27-11-000-001-A | Removal of the Access Panel |
| TASK 57-27-11-400-001-A | Installation of the Access Panel |
| TASK 57-27-12-000-002-A | Removal of the Rib 2 Access Panel 540AZ(640AZ) or 540BZ(640BZ) |
| TASK 57-27-12-400-002-A | Installation of the Rib 2 Access Panel 540AZ (640AZ) or 540BZ (640BZ) |
| FOR [223QM] (CHECK VALVE) | |
| FOR [225QM] (CHECK VALVE) | |
| TASK 28-10-00-910-002-A | Access to the Fuel Tanks and the Work Areas |
| TASK 57-27-11-000-001-A | Removal of the Access Panel |
| TASK 57-27-11-400-001-A | Installation of the Access Panel |
| TASK 57-27-12-000-002-A | Removal of the Rib 2 Access Panel 540AZ(640AZ) or 540BZ(640BZ) |
| TASK 57-27-12-400-002-A | Installation of the Rib 2 Access Panel 540AZ (640AZ) or 540BZ (640BZ) |
Subtask 28-16-42-941-057-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(2) Make sure that the SAFETY BARRIER(S) are in position.
Subtask 28-16-42-860-054-A ** ON A/C NOT FOR ALL WARNING:
BEFORE YOU DO WORK IN OR NEAR A FUEL TANK, MAKE SURE THAT YOU OBEY ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT.
(1) You must obey the fuel safety procedures when you do work in a fuel tank (Ref. AMM TASK 28-10-00-910-001). (2) Make sure that the SAFETY BARRIER(S) are in position.
B. Aircraft Maintenance Configuration
(1) Make sure that the applicable fuel tank is defueled (Ref. AMM TASK 28-25-00-650-001) .
(2) Make sure that the remaining fuel has been drained from the applicable fuel tank (Ref. AMM TASK 28-25-00-650-003).
(3) Make sure the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is below the applicable zone 540(640).
(4) Make sure that the applicable access panel is removed 540AB(640AB) (Ref. AMM TASK 57-27-11-000-001) and (Ref. AMM TASK 28-10-00-910-002).
(5) Make sure that the applicable sure door 540BZ(640BZ) is open and the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) is installed.
Subtask 28-16-42-860-054-C ** ON A/C NOT FOR ALL (1) Make sure that the applicable fuel tank is defueled (Ref. AMM TASK 28-25-00-650-001) .
(2) Make sure that the remaining fuel has been drained from the applicable fuel tank (Ref. AMM TASK 28-25-00-650-003).
(3) Make sure the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is below the applicable zone 540(640).
(4) Make sure that the applicable access panel is removed 540AB(640AB) (Ref. AMM TASK 57-27-11-000-001) and (Ref. AMM TASK 28-10-00-910-002).
(5) Make sure that the applicable sure door 540BZ(640BZ) is open and the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) is installed.
B. Aircraft Maintenance Configuration
(1) Make sure that the applicable fuel tank is defueled (Ref. AMM TASK 28-25-00-650-001).
(2) Make sure that the remaining fuel has been drained from the applicable fuel tank (Ref. AMM TASK 28-25-00-650-003).
(3) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position below the applicable zone 540 (640).
(4) Make sure that the applicable access panels are removed as follow:
(a) FOR [222QM] (CHECK VALVE), [224QM] (CHECK VALVE)
Remove 540AB (Ref. AMM TASK 28-10-00-910-002) and (Ref. AMM TASK 57-27-11-000-001).
(b) FOR [223QM] (CHECK VALVE), [225QM] (CHECK VALVE)
Remove 640AB (Ref. AMM TASK 28-10-00-910-002) and (Ref. AMM TASK 57-27-11-000-001).
(5) Make sure that the applicable RIB2 access panels are removed as follow:
(a) FOR [222QM] (CHECK VALVE), [224QM] (CHECK VALVE)
Remove 540BZ (Ref. AMM TASK 57-27-12-000-002).
(b) FOR [223QM] (CHECK VALVE), [225QM] (CHECK VALVE)
Remove 640BZ (Ref. AMM TASK 57-27-12-000-002).
4. Procedure(1) Make sure that the applicable fuel tank is defueled (Ref. AMM TASK 28-25-00-650-001).
(2) Make sure that the remaining fuel has been drained from the applicable fuel tank (Ref. AMM TASK 28-25-00-650-003).
(3) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position below the applicable zone 540 (640).
(4) Make sure that the applicable access panels are removed as follow:
(a) FOR [222QM] (CHECK VALVE), [224QM] (CHECK VALVE)
Remove 540AB (Ref. AMM TASK 28-10-00-910-002) and (Ref. AMM TASK 57-27-11-000-001).
(b) FOR [223QM] (CHECK VALVE), [225QM] (CHECK VALVE)
Remove 640AB (Ref. AMM TASK 28-10-00-910-002) and (Ref. AMM TASK 57-27-11-000-001).
(5) Make sure that the applicable RIB2 access panels are removed as follow:
(a) FOR [222QM] (CHECK VALVE), [224QM] (CHECK VALVE)
Remove 540BZ (Ref. AMM TASK 57-27-12-000-002).
(b) FOR [223QM] (CHECK VALVE), [225QM] (CHECK VALVE)
Remove 640BZ (Ref. AMM TASK 57-27-12-000-002).
Subtask 28-16-42-420-053-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
(1) Clean the component interfaces and the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(2) Make sure that the parts retained from the removed component are clean and in the correct condition.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Lubricate the new AIPC 28-16-05-18-190 O-RING (1) with Turbine Fuel-- Kerosene - (Material No.01ABA1) or Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) .
Subtask 28-16-42-420-051-A ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(2) Make sure that the parts retained from the removed component are clean and in the correct condition.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Lubricate the new AIPC 28-16-05-18-190 O-RING (1) with Turbine Fuel-- Kerosene - (Material No.01ABA1) or Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) .
B. Installation of the Check Valve 222QM(223QM), 224QM(225QM)
(1) Install the new O-ring (1) on the check-valve (2).
(2) Remove the blanking plugs from the disconnected line ends.
(3) Install the check-valve (2).
(4) Connect the pipe (3) to the check-valve (2).
Subtask 28-16-42-410-051-A ** ON A/C NOT FOR ALL (1) Install the new O-ring (1) on the check-valve (2).
(2) Remove the blanking plugs from the disconnected line ends.
(3) Install the check-valve (2).
(4) Connect the pipe (3) to the check-valve (2).
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) and carefully close the applicable RIB 2 surge door:
(a) FOR [222QM] (CHECK VALVE), [224QM] (CHECK VALVE)
close 540BZ
(b) FOR [223QM] (CHECK VALVE), [225QM] (CHECK VALVE)
close 640BZ.
(3) Install the applicable wing access panel (Ref. AMM TASK 57-27-11-400-001):
(a) FOR [222QM] (CHECK VALVE), [224QM] (CHECK VALVE)
install 540AB.
(b) FOR [223QM] (CHECK VALVE), [225QM] (CHECK VALVE)
install 640AB.
Subtask 28-16-42-410-051-C ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) and carefully close the applicable RIB 2 surge door:
(a) FOR [222QM] (CHECK VALVE), [224QM] (CHECK VALVE)
close 540BZ
(b) FOR [223QM] (CHECK VALVE), [225QM] (CHECK VALVE)
close 640BZ.
(3) Install the applicable wing access panel (Ref. AMM TASK 57-27-11-400-001):
(a) FOR [222QM] (CHECK VALVE), [224QM] (CHECK VALVE)
install 540AB.
(b) FOR [223QM] (CHECK VALVE), [225QM] (CHECK VALVE)
install 640AB.
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the applicable RIB2 access panels that follow:
(a) FOR [222QM] (CHECK VALVE), [224QM] (CHECK VALVE)
Install 540BZ (Ref. AMM TASK 57-27-12-400-002).
(b) FOR [223QM] (CHECK VALVE), [225QM] (CHECK VALVE)
Install 640BZ (Ref. AMM TASK 57-27-12-400-002).
(3) Install the applicable access panels that follow:
(a) FOR [222QM] (CHECK VALVE), [224QM] (CHECK VALVE)
Install 540AB (Ref. AMM TASK 57-27-11-400-001).
(b) FOR [223QM] (CHECK VALVE), [225QM] (CHECK VALVE)
Install 640AB (Ref. AMM TASK 57-27-11-400-001).
Subtask 28-16-42-865-054-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the applicable RIB2 access panels that follow:
(a) FOR [222QM] (CHECK VALVE), [224QM] (CHECK VALVE)
Install 540BZ (Ref. AMM TASK 57-27-12-400-002).
(b) FOR [223QM] (CHECK VALVE), [225QM] (CHECK VALVE)
Install 640BZ (Ref. AMM TASK 57-27-12-400-002).
(3) Install the applicable access panels that follow:
(a) FOR [222QM] (CHECK VALVE), [224QM] (CHECK VALVE)
Install 540AB (Ref. AMM TASK 57-27-11-400-001).
(b) FOR [223QM] (CHECK VALVE), [225QM] (CHECK VALVE)
Install 640AB (Ref. AMM TASK 57-27-11-400-001).
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 28-16-42-710-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/L WING TK/PUMP2 SPLY | 7QA | N26 |
| 121VU | FUEL/L WING TK/PUMP1 SPLY | 1QA | N23 |
| 121VU | FUEL/R WING TK/PUMP2 SPLY | 8QA | Q26 |
| 121VU | FUEL/R WING TK/PUMP1 SPLY | 2QA | Q23 |
| 123VU | L WING TK/PUMP 1/STBY SPLY | 11QA | AD12 |
| 123VU | R WING TK/PUMP 1/STBY SPLY | 12QA | AE12 |
E. Operational test
(1) Do the operational test of the check valves 222QM(223QM) and 224QM(225QM) (Ref. AMM TASK 28-21-00-710-002).
5. Close-up(1) Do the operational test of the check valves 222QM(223QM) and 224QM(225QM) (Ref. AMM TASK 28-21-00-710-002).
Subtask 28-16-42-650-053-A ** ON A/C NOT FOR ALL
A. Fuel Configuration
(1) Refuel, defuel or transfer fuel as necessary (Ref. AMM TASK 12-11-28-650-003), (Ref. AMM TASK 28-25-00-650-001) or (Ref. AMM TASK 28-25-00-869-001).
Subtask 28-16-42-942-052-A ** ON A/C NOT FOR ALL (1) Refuel, defuel or transfer fuel as necessary (Ref. AMM TASK 12-11-28-650-003), (Ref. AMM TASK 28-25-00-650-001) or (Ref. AMM TASK 28-25-00-869-001).
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the access platform(s).
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Remove the safety barriers.
(2) Remove the access platform(s).
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Check Valve - Location and Detail