To Set the RH Wing Transfer Valve Open for Flight
TASK 28-15-00-040-002-A
To Set the RH Wing Transfer Valve Open for Flight
MMEL 28-15-02C
RH WING TRANSFER VALVE
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 28-15-00-941-057-A ** ON A/C NOT FOR ALL
Subtask 28-15-00-040-051-A ** ON A/C NOT FOR ALL
Subtask 28-15-00-860-061-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:17:14 UTC
To Set the RH Wing Transfer Valve Open for Flight
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
1. Reason for the Job- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
MMEL 28-15-02C
RH WING TRANSFER VALVE
NOTE: This procedure must only be done if the aircraft is energized and will stay energized until take-off. If possible do this procedure immediately before take-off. This will prevent possible fuel overflow from the outer fuel tanks into the vent system. If you de-energize the aircraft after this procedure and before take-off, you must do this procedure again when the aircraft is energized. This is because the transfer valve will close when the aircraft is energized again.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY BARRIER(S) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-11-28-650-003-A | Pressure Refuel with Automatic Control |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 28-00-00-910-001-A | Fuel Safety Procedures |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 28-15-00-941-057-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(2) Put the SAFETY BARRIER(S) in position.
Subtask 28-15-00-650-055-A ** ON A/C NOT FOR ALL WARNING:
OBEY THE FUEL SAFETY PROCEDURES.
(1) You must obey the fuel safety procedures when you do work on the fuel system (Ref. AMM TASK 28-00-00-910-001). (2) Put the SAFETY BARRIER(S) in position.
B. Fuel Configuration
(1) Refuel the aircraft with the necessary quantity of fuel (Ref. AMM TASK 12-11-28-650-003).
(2) Before you continue with this procedure make sure that:
Subtask 28-15-00-860-060-A ** ON A/C NOT FOR ALL (1) Refuel the aircraft with the necessary quantity of fuel (Ref. AMM TASK 12-11-28-650-003).
(2) Before you continue with this procedure make sure that:
- the quantity of fuel onboard the aircraft is correct
- the refuel/defuel panel door is closed.
C. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (ECAM only) (Ref. AMM TASK 31-60-00-860-001).
(3) On the ECAM control panel, push (in) the FUEL pushbutton switch to show the FUEL page on the ECAM lower display unit.
Subtask 28-15-00-865-054-A ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (ECAM only) (Ref. AMM TASK 31-60-00-860-001).
(3) On the ECAM control panel, push (in) the FUEL pushbutton switch to show the FUEL page on the ECAM lower display unit.
D. Table of the circuit breakers used in this procedure:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FUEL/XFR VALVE1/WING/L | 1QP | A10 |
| 121VU | FUEL/XFR VALVE2/WING/L | 3QP | M22 |
Subtask 28-15-00-040-051-A ** ON A/C NOT FOR ALL
A. To Set the Transfer Valve 29QM Open for Flight
(1) If the transfer valve 30QM is unserviceable, set the transfer valve 29QM to the open position as follows:
(2) Monitor the wing fuel-quantity indication on the ECAM display unit.
(3) Make sure the quantities of fuel in the wing tank inner-cells increase as fuel moves from the outer cells.
(4) The LH and RH wing transfer-valves are now set to the open position and the aircraft is ready for flight.
Subtask 28-15-00-040-053-A ** ON A/C NOT FOR ALL (1) If the transfer valve 30QM is unserviceable, set the transfer valve 29QM to the open position as follows:
| ACTION | RESULT |
|---|---|
1.On the panel 121VU:
|
|
2.On the panel 121VU:
|
|
(3) Make sure the quantities of fuel in the wing tank inner-cells increase as fuel moves from the outer cells.
(4) The LH and RH wing transfer-valves are now set to the open position and the aircraft is ready for flight.
NOTE: The wing transfer valves will close again if:
- the refuel/defuel panel door is opened
- the aircraft is energized.
B. To Set the Transfer Valve 30QM Open for Flight
(1) If the transfer valve 29QM is unserviceable, set the transfer valve 30QM to the open position as follows:
(2) Monitor the wing fuel-quantity indication on the ECAM display unit.
(3) Make sure the quantities of fuel in the wing tank inner-cells increase as fuel moves from the outer cells.
(4) The LH and RH wing transfer-valves are now set to the open position and the aircraft is ready for flight.
Subtask 28-15-00-040-053-D ** ON A/C NOT FOR ALL (1) If the transfer valve 29QM is unserviceable, set the transfer valve 30QM to the open position as follows:
| ACTION | RESULT |
|---|---|
1.On the panel 49VU:
|
|
2.On panel 49VU:
|
|
(3) Make sure the quantities of fuel in the wing tank inner-cells increase as fuel moves from the outer cells.
(4) The LH and RH wing transfer-valves are now set to the open position and the aircraft is ready for flight.
NOTE: The wing transfer valves will close again if:
- the refuel/defuel panel door is opened
- the aircraft is energized again.
B. To Set the Transfer Valve 30QM Open for Flight
(1) If the transfer valve 29QM is unserviceable, set the transfer valve 30QM to the open position as follows:
(2) Monitor the wing fuel-quantity indication on the ECAM display unit.
(3) Make sure the quantities of fuel in the wing tank inner-cells increase as fuel moves from the outer cells.
(4) The LH and RH wing transfer-valves are now set to the open position and the aircraft is ready for flight.
5. Close-up(1) If the transfer valve 29QM is unserviceable, set the transfer valve 30QM to the open position as follows:
| ACTION | RESULT |
|---|---|
1.On the panel 49VU:
|
|
2.On panel 49VU:
|
|
(3) Make sure the quantities of fuel in the wing tank inner-cells increase as fuel moves from the outer cells.
(4) The LH and RH wing transfer-valves are now set to the open position and the aircraft is ready for flight.
NOTE: The wing transfer valves will close again if:
- the refuel/defuel panel door is opened
- the aircraft is energized again.
Subtask 28-15-00-860-061-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(2) Make a note in the aircraft technical log that the applicable LH and RH wing transfer-valves are set to the open position.
Subtask 28-15-00-942-055-A ** ON A/C NOT FOR ALL (1) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(2) Make a note in the aircraft technical log that the applicable LH and RH wing transfer-valves are set to the open position.
B. Removal of Equipment
(1) Remove the SAFETY BARRIER(S).
(2) Make sure that the work area is clean and clear of tools and other items.
(1) Remove the SAFETY BARRIER(S).
(2) Make sure that the work area is clean and clear of tools and other items.