W DOC AIRBUS | AMM A320F

Installation of the Check Valve


TASK 28-12-44-400-005-A
Installation of the Check Valve


WARNING: MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
FIN: 173QM1 ** ON A/C NOT FOR ALL
FIN: 173QM2 ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE
No specific
AR
SAFETY BARRIER(S)
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
826
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 12-11-28-650-003-A
Pressure Refuel with Automatic Control
TASK 28-10-00-910-001-A
Safety Procedures When You Do Work in a Fuel Tank
TASK 28-10-00-910-002-A
Access to the Fuel Tanks and the Work Areas
TASK 28-11-27-000-001-A
Removal of the Additional Center Tank (ACT)
TASK 28-11-27-400-001-A
Installation of the Additional Center Tank (ACT)
TASK 28-11-37-000-001-A
Removal of the Inner Manhole-Cover ACT
TASK 28-11-37-400-001-A
Installation of the Inner Manhole-Cover ACT
TASK 28-25-00-650-001-A
Pressure Defuel
TASK 28-25-00-650-005-A
To Drain the Remaining Fuel from the Additional Center Tank (ACT)
TASK 28-25-00-869-001-A
Fuel Transfer
F Check Valve 173QM1 ** ON A/C NOT FOR ALL
F Check Valves 173QM1 and 173QM2 ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 28-12-44-941-070-A ** ON A/C NOT FOR ALL
A. Safety Precautions
WARNING: BEFORE YOU DO WORK IN OR NEAR A FUEL TANK, MAKE SURE THAT YOU OBEY ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT.
   (1) You must obey the fuel safety procedures (Ref. AMM TASK 28-10-00-910-001) when you do work in a fuel tank.
   (2) Make sure that the SAFETY BARRIER(S) are in position.
Subtask 28-12-44-860-059-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) Make sure that the ACT is defueled (Ref. AMM TASK 28-25-00-650-001).
   (2) Make sure that the remaining fuel has been drained from the ACT (Ref. AMM TASK 28-25-00-650-005).
   (3) Make sure that the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE is below the aft cargo-compartment-door 826.
   (4) Make sure that aft cargo-compartment-door 826 is open.
   (5) Make sure that the ACT manhole cover has been removed (Ref. AMM TASK 28-11-37-000-001), (Ref. AMM TASK 28-10-00-910-002).
Subtask 28-12-44-860-060-A ** ON A/C NOT FOR ALL
C. Aircraft Maintenance Configuration
   (1) Make sure that the applicable ACT is defueled (Ref. AMM TASK 28-25-00-650-001).
   (2) Make sure that the remaining fuel has been drained from the applicable ACT (Ref. AMM TASK 28-25-00-650-005).
   (3) Make sure that the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE is below aft cargo-compartment-door 826.
   (4) Make sure that aft cargo-compartment-door 826 is open.
   (5) For check valve 173QM1:
     (a) Make sure that ACT2 has been removed (Ref. AMM TASK 28-11-27-000-001).
     (b) Make sure that ACT1 manhole cover has been removed (Ref. AMM TASK 28-11-37-000-001), (Ref. AMM TASK 28-10-00-910-002).
   (6) For check valve 173QM2:
     (a) Make sure that ACT2 manhole cover has been removed (Ref. AMM TASK 28-11-37-000-001), (Ref. AMM TASK 28-10-00-910-002).
Subtask 28-12-44-865-051-A ** ON A/C NOT FOR ALL
D. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUACT1/REFUEL & SPLY33QUL29
121VUACT XFR VALVE MAN CTL30QHN29
121VUACT1/CTL & SPLY9QHP29
121VUACT PUMP SUPPLY25QHQ29
** ON A/C NOT FOR ALL
121VUACT2/REFUEL & SPLY34QUL28
121VUACT2/CTL & SPLY10QHP28
4. Procedure
Subtask 28-12-44-420-054-A ** ON A/C NOT FOR ALL
A. Preparation for the Installation
   (1) Clean the component interface and/or the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
   (2) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (3) Do an inspection of the component interfaces and the adjacent area.
Subtask 28-12-44-420-056-A ** ON A/C NOT FOR ALL
B. Installation of Check Valve 173QM1
F Check Valve 173QM1 ** ON A/C NOT FOR ALL
   (1) Hold the clamp (2) on the end of the pipe (1) and install the check valve (3), with the flat face horizontal.
   (2) Move the clamp (2) on to the check valve (3) and tighten the clamp (2).
Subtask 28-12-44-420-057-A ** ON A/C NOT FOR ALL
C. Installation of Check Valves 173QM1 and 173QM2
F Check Valves 173QM1 and 173QM2 ** ON A/C NOT FOR ALL
   (1) With the flat face horizontal, hold the clamp (2) on the end of the pipe (1) and install the check valve (3).
   (2) Move the clamp (2) on to the check valve (3) and tighten the clamp (2).
5. Close-up
Subtask 28-12-44-410-055-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install ACT1 manhole cover (Ref. AMM TASK 28-11-37-400-001).
   (3) Close aft cargo-compartment-door 826.
Subtask 28-12-44-410-056-A ** ON A/C NOT FOR ALL
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the applicable ACT manhole cover (Ref. AMM TASK 28-11-37-400-001).
   (3) If applicable, install ACT 2 (Ref. AMM TASK 28-11-27-400-001).
   (4) Close the aft cargo-compartment-door 826.
Subtask 28-12-44-865-052-A ** ON A/C NOT FOR ALL
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUACT1/REFUEL & SPLY33QUL29
121VUACT XFR VALVE MAN CTL30QHN29
121VUACT1/CTL & SPLY9QHP29
121VUACT PUMP SUPPLY25QHQ29
** ON A/C NOT FOR ALL
121VUACT2/REFUEL & SPLY34QUL28
121VUACT2/CTL & SPLY10QHP28
Subtask 28-12-44-650-063-A ** ON A/C NOT FOR ALL
D. Fuel Configuration
   (1) Refuel, defuel or transfer fuel as necessary (Ref. AMM TASK 12-11-28-650-003), (Ref. AMM TASK 28-25-00-650-001) or (Ref. AMM TASK 28-25-00-869-001).
Subtask 28-12-44-942-058-A ** ON A/C NOT FOR ALL
E. Removal of the Equipment
   (1) Remove the SAFETY BARRIERS.
   (2) Remove the WARNING NOTICE(S).
   (3) Remove the access platform(s).
   (4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.