Installation of the Additional Center Tank (ACT) Integrated Impact Wall
TASK 28-11-49-400-002-A
Installation of the Additional Center Tank (ACT) Integrated Impact Wall
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 28-11-49-860-053-B ** ON A/C NOT FOR ALL
Subtask 28-11-49-420-051-B ** ON A/C NOT FOR ALL
Subtask 28-11-49-410-051-B ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 07:01:54 UTC
Installation of the Additional Center Tank (ACT) Integrated Impact Wall
WARNING:
OBEY THE FUEL SAFETY PROCEDURES.
WARNING:
MAKE SURE THAT THE SAFETY DEVICES AND THE WARNING NOTICES ARE IN POSITION BEFORE YOU START A TASK ON OR NEAR:
1. Reason for the Job- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND RELATED DOORS
- COMPONENTS THAT MOVE.
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 130 | FWD CARGO COMPT AFT BULKHEAD OF AVNCS COMPT TO FWD PRESSURE BULKHEAD OF WING CENTER BOX |
| 150 | AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT |
| 160 | BULK CARGO COMPARTMENT AFT BULKHEAD OF AFT CARGO COMPARTMENT TO AFT BULKHEAD OF BULK CARGO COMPARTMENT |
| 826 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 28-11-49-860-053-B ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that an ACCESS PLATFORM 2M (6 FT) is in position below aft cargo-compartment door 826.
(3) Make sure that aft cargo-compartment door 826 is open (Ref. AMM TASK 52-30-00-860-001).
(4) Make sure that CARGO COMPT LIGHT switch 8LU is set to the ON position.
4. Procedure(1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that an ACCESS PLATFORM 2M (6 FT) is in position below aft cargo-compartment door 826.
(3) Make sure that aft cargo-compartment door 826 is open (Ref. AMM TASK 52-30-00-860-001).
(4) Make sure that CARGO COMPT LIGHT switch 8LU is set to the ON position.
Subtask 28-11-49-420-051-B ** ON A/C NOT FOR ALL
A. Installation of the Integrated Impact Wall
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
(4) Install the integrated impact-wall elements (2) and (3) with the lock washers (5), the washers (4) and the studs (6) and (7).
(5) Tighten the studs (6) and (7).
5. Close-up(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
(4) Install the integrated impact-wall elements (2) and (3) with the lock washers (5), the washers (4) and the studs (6) and (7).
(5) Tighten the studs (6) and (7).
Subtask 28-11-49-410-051-B ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Set CARGO COMPT LIGHT switch 8LU to the OFF position.
(3) Close aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
(4) Remove the access platform(s).
Subtask 28-11-49-942-051-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Set CARGO COMPT LIGHT switch 8LU to the OFF position.
(3) Close aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
(4) Remove the access platform(s).
B. Put the aircraft back to its initial configuration.
(1) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
(1) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
Integrated Impact Wall of the ACT (AFT Cargo Compartment)