Installation of the ACT Integrated Impact Wall


TASK 28-11-49-400-001-A
Installation of the ACT Integrated Impact Wall


WARNING: OBEY THE FUEL SAFETY PROCEDURES.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
1
WARNING NOTICE(S)
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 28-00-00-910-001-A
Fuel Safety Procedures
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
F Impact Wall of the ACT2 ** ON A/C NOT FOR ALL
F Impact Wall of the ACT ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 28-11-49-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
   (2) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
   (3) Make sure that the aft cargo-compartment door is open (Ref. AMM TASK 52-30-00-860-001).
   (4) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the opening of the aft cargo-compartment door.
   (5) Make sure that a WARNING NOTICE(S) is in position on:
  • the refuel/defuel control panel 801VU,
  • the fuel control panel 40VU,
    to tell persons not to operate the refuel/defuel system. door.
4. Procedure
Subtask 28-11-49-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Integrated Impact Wall.
   (1) Do an inspection of the component interfaces and the adjacent area.
   (2) Make sure that the quick-connect fasteners (4) on the impact wall elements (2) and (3) are not loose or damaged.
   (3) Make sure that the connection studs on the ACT (1) are not loose or damaged.
   (4) Put the impact wall elements (2) and (3) in position on the ACT (1)
   (5) Tighten the quick-connect fasteners (4).
Subtask 28-11-49-420-050-B ** ON A/C NOT FOR ALL
A. Installation of the Integrated Impact Wall.
   (1) Do an inspection of the component interfaces and the adjacent area.
   (2) Make sure that the quick-connect fasteners (4) on the impact wall elements (2) and (3) are not loose or damaged.
   (3) Make sure that the connection studs on the ACT2 (1) are not loose or damaged.
   (4) Put the impact wall elements (2) and (3) in position on the ACT2 (1)
   (5) Tighten the quick-connect fasteners (4).
5. Close-up
Subtask 28-11-49-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the access platform(s).
   (3) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
Subtask 28-11-49-942-050-A ** ON A/C NOT FOR ALL
B. Put the aircraft back to the serviceable condition.
   (1) Remove the WARNING NOTICE(S).
   (2) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001)