Removal of the ACT Integrated Impact Wall
TASK 28-11-49-000-001-A
Removal of the ACT Integrated Impact Wall
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 28-11-49-860-050-A ** ON A/C NOT FOR ALL
Subtask 28-11-49-020-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:17:07 UTC
Removal of the ACT Integrated Impact Wall
WARNING:
OBEY THE FUEL SAFETY PROCEDURES.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | 1 | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 28-00-00-910-001-A | Fuel Safety Procedures |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 28-11-49-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
(3) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(4) Put the ACCESS PLATFORM 2M (6 FT) in position at the opening of the aft cargo-compartment door.
(5) Put a WARNING NOTICE(S) in position on:
4. Procedure(1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
(3) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(4) Put the ACCESS PLATFORM 2M (6 FT) in position at the opening of the aft cargo-compartment door.
(5) Put a WARNING NOTICE(S) in position on:
- the refuel/defuel control panel 801VU,
- the fuel control panel 40VU,
to tell persons not to operate the refuel/defuel system.
Subtask 28-11-49-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the Integrated Impact Wall.
(1) Release the quick-release fasteners (4) on the impact wall elements (2) and (3).
(2) Remove the integrated impact wall elements (2) and (3) from the ACT (1).
Subtask 28-11-49-020-050-B ** ON A/C NOT FOR ALL (1) Release the quick-release fasteners (4) on the impact wall elements (2) and (3).
(2) Remove the integrated impact wall elements (2) and (3) from the ACT (1).
A. Removal of the Integrated Impact Wall.
(1) Release the quick-release fasteners (4) on the impact wall elements (2) and (3).
(2) Remove the integrated impact wall elements (2) and (3) from the ACT2 (1).
(1) Release the quick-release fasteners (4) on the impact wall elements (2) and (3).
(2) Remove the integrated impact wall elements (2) and (3) from the ACT2 (1).
Impact Wall of the ACT2