Installation of the SEC
TASK 27-94-34-400-001-A
Installation of the SEC
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 27-94-34-010-052-A
Subtask 27-94-34-420-050-A ** ON A/C NOT FOR ALL
Subtask 27-94-34-410-050-A
[Rev.10 from 2021]
2026.03.31 23:59:45 UTC
Installation of the SEC
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 121 | AVIONICS COMPARTMENT |
| 127 | REAR AVIONIC COMPARTMENT |
| 128 | REAR AVIONIC COMPARTMENT |
| 811, 822, 824 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 27-94-00-610-801-A | Uploading of the Spoiler Elevator Computer (SEC) Software |
| TASK 27-94-34-000-001-A | Removal of the SEC |
| TASK 27-94-34-400-001-A | Installation of the SEC |
| TASK 31-32-00-860-006-A | Procedure to Get Access to the SYSTEM REPORT/TEST F/CTL Page |
| TASK 52-41-00-410-002-A | Close the Avionics Compartment Doors after Access |
| FOR [1CE1] (SEC-1) | |
| TASK 27-94-00-710-002-A | Operational Test of the Spoiler Elevator Computer 1 (SEC 1) |
| FOR [1CE2] (SEC-2) | |
| TASK 27-94-00-710-003-A | Operational Test of the Spoiler Elevator Computer 2 (SEC 2) |
| FOR [1CE3] (SEC-3) | |
| TASK 27-94-00-710-001-A | Operational Test of the Spoiler Elevator Computer 3 (SEC 3) |
Subtask 27-94-34-010-052-A
A. Get Access
(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access doors 822, 824 and 811.
(2) Make sure that the access doors 822, 824 and 811 are open:
(3) On the battery power center 105VU:
Subtask 27-94-34-865-051-A (1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access doors 822, 824 and 811.
(2) Make sure that the access doors 822, 824 and 811 are open:
(3) On the battery power center 105VU:
- Make sure that the protective cover is open.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 1CE1 (SEC1) | |||
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B08 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B03 |
| ** ON A/C ALL | |||
| 105VU | FLT CTL/SEC1/STBY SPLY | 22CE | B01 |
| FOR FIN: 1CE2 (SEC2) | |||
| 121VU | FLIGHT CONTROLS/SEC2/SPLY | 21CE2 | Q18 |
| FOR FIN: 1CE3 (SEC3) | |||
| 121VU | FLIGHT CONTROLS/SEC3/SPLY | 21CE3 | Q19 |
Subtask 27-94-34-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Spoiler Elevator Computer (SEC)
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking caps from the electrical connectors (2).
(4) Install the SEC (1) on its rack (3).
(5) Push the SEC (1) on its rack (3) to connect the electrical connectors (2).
(6) Engage the nuts on the lugs:
Subtask 27-94-34-420-050-B ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking caps from the electrical connectors (2).
(4) Install the SEC (1) on its rack (3).
(5) Push the SEC (1) on its rack (3) to connect the electrical connectors (2).
(6) Engage the nuts on the lugs:
CAUTION:
MAKE SURE THAT THE OBRM(S) IS (ARE) CORRECTLY INSTALLED. IF IT (THEY) IS(ARE) NOT INSTALLED CORRECTLY, PUSH THE OBRM(S) UNTIL THE LOCKING DEVICES ARE LOCKED.
(a) Engage the nuts (4) on the lugs and tighten. A. Installation of the Spoiler Elevator Computer (SEC)
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking caps from the electrical connectors (2).
(4) Install the SEC (1) on its rack (3).
(5) Push the SEC (1) on its rack (3) to connect the electrical connectors (2).
(6) Engage the nuts (4) on the lugs and tighten.
Subtask 27-94-34-865-052-A (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking caps from the electrical connectors (2).
(4) Install the SEC (1) on its rack (3).
(5) Push the SEC (1) on its rack (3) to connect the electrical connectors (2).
(6) Engage the nuts (4) on the lugs and tighten.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 27-94-34-280-052-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 1CE1 (SEC1) | |||
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B08 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B03 |
| ** ON A/C ALL | |||
| 105VU | FLT CTL/SEC1/STBY SPLY | 22CE | B01 |
| FOR FIN: 1CE2 (SEC2) | |||
| 121VU | FLIGHT CONTROLS/SEC2/SPLY | 21CE2 | Q18 |
| FOR FIN: 1CE3 (SEC3) | |||
| 121VU | FLIGHT CONTROLS/SEC3/SPLY | 21CE3 | Q19 |
C. Do the LRU IDENTIFICATION of the SEC
(2) Make sure that the P/N of the SEC shown on the LRU IDENTIFICATION page agrees with the Airline Configuration Management Document.
(a) If the P/N is different from the PN(s) given in the Airline Configuration Management Document, replace the SEC (Ref. AMM TASK 27-94-34-000-001) and (Ref. AMM TASK 27-94-34-400-001).
Subtask 27-94-34-280-052-B ** ON A/C NOT FOR ALL NOTE: This procedure is for the SEC1. For the SEC2, use the indications between the parentheses.
(1) Do the procedure to get access to the SYSTEM REPORT/TEST F/CTL page (Ref. AMM TASK 31-32-00-860-006). | ACTION | RESULT |
|---|---|
| 1.Push the line key adjacent to the EFCS 1(2) indication. | - The EFCS 1(2) menu page comes into view. |
| 2.Push the line key adjacent to the LRU IDENTIFICATION indication. | - The LRU IDENTIFICATION page comes into view. The P/N given on this page is the operational software P/N. |
(a) If the P/N is different from the PN(s) given in the Airline Configuration Management Document, replace the SEC (Ref. AMM TASK 27-94-34-000-001) and (Ref. AMM TASK 27-94-34-400-001).
NOTE: For SEC P/N B372CAMxxxx, Airbus recommends to put (or update) an informative label on the front face of the computer with the P/N of the loaded software. This label is for information only. The procedure to identify the operational software P/N stays the LRU IDENTIFICATION on the MCDU.
C. Do the LRU IDENTIFICATION of the SEC
(2) Make sure that the P/N of the SEC shown on the LRU IDENTIFICATION page agrees with the Airline Configuration Management Document.
(a) If the P/N is different from the PN(s) given in the Airline Configuration Management Document:
Subtask 27-94-34-710-050-A NOTE: This procedure is for the SEC1. For the SEC2, use the indications between the parentheses.
(1) Do the procedure to get access to the SYSTEM REPORT/TEST F/CTL page (Ref. AMM TASK 31-32-00-860-006). | ACTION | RESULT |
|---|---|
| 1.Push the line key adjacent to the EFCS 1(2) indication. | - The EFCS 1(2) menu page comes into view. |
| 2.Push the line key adjacent to the LRU IDENTIFICATION indication. | - The LRU IDENTIFICATION page comes into view. The P/N given on this page is the operational software P/N. |
(a) If the P/N is different from the PN(s) given in the Airline Configuration Management Document:
- If the SEC LRU IDENTIFICATION shows the P/N B372BAMxxxx or B372BBMxxxx (non-dataloadable units), replace the SEC (Ref. AMM TASK 27-94-34-000-001) and (Ref. AMM TASK 27-94-34-400-001).
- If the SEC LRU IDENTIFICATION shows the P/N B372CAMxxxx, do the uploading of the SEC software (Ref. AMM TASK 27-94-00-610-801).
NOTE: For SEC P/N B372CAMxxxx, Airbus recommends to put (or update) an informative label on the front face of the computer with the P/N of the loaded software. This label is for information only. The procedure to identify the operational software P/N stays the LRU IDENTIFICATION on the MCDU.
D. Do the operational test of the SEC (1CE1,1CE2,1CE3).
(Ref. AMM TASK 27-94-00-710-002)
(2) FOR [1CE2] (SEC-2)
(Ref. AMM TASK 27-94-00-710-003)
(3) FOR [1CE3] (SEC-3)
(Ref. AMM TASK 27-94-00-710-001)
5. Close-upCAUTION:
MAKE SURE THAT THE SOFTWARE INSTALLED AGREES WITH THE AIRLINE CONFIGURATION MANAGEMENT DOCUMENT. THE SYSTEM OPERATIONAL TEST OR BITE TEST DOES NOT DETECT INCORRECT SOFTWARE CONFIGURATION.
(1) FOR [1CE1] (SEC-1)(Ref. AMM TASK 27-94-00-710-002)
(2) FOR [1CE2] (SEC-2)
(Ref. AMM TASK 27-94-00-710-003)
(3) FOR [1CE3] (SEC-3)
(Ref. AMM TASK 27-94-00-710-001)
Subtask 27-94-34-410-050-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the protective cover on the battery power center 105VU.
(3) Tighten the two screws.
(4) Close the access door 822, 824 and 811 (Ref. AMM TASK 52-41-00-410-002)
(5) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the protective cover on the battery power center 105VU.
(3) Tighten the two screws.
(4) Close the access door 822, 824 and 811 (Ref. AMM TASK 52-41-00-410-002)
(5) Remove the access platform(s).
Spoiler Elevator Computer (SEC)