Subtask 27-92-41-861-063-A
Subtask 27-92-41-210-056-A
Subtask 27-92-41-010-083-A
[Rev.10 from 2021]
2026.03.31 23:59:00 UTC
Installation of the Bellows of the New-Generation Side Stick Unit (SSU)
NOTE: This task is applicable only for the new-generation side-stick unit. For the other side-stick assemblies, refer to the procedure (Ref. AMM TASK 27-92-41-400-009). To know if the side-stick installed on the aircraft is a new-generation side-stick unit, refer to the procedure (Ref. AMM 27-92-41-860-801).
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | WARNING NOTICE(S) |
| 98D27903500000 | 3 | PIN-SIDE STICK LOCKING |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.06CMD9) | Silicone Adhesive Sealant-General Purpose One part legacy |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 211 | COCKPIT |
| 212 | COCKPIT |
| 822 |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 2 | COLLAR-CLAMP | AIPC 27-92-41-03-030 |
| 4 | LIGATURE CORD | AIPC 27-92-41-03-050 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 31-61-14-400-801-A | Installation of the Cursor Control Device (CCD) |
Subtask 27-92-41-861-063-A
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the aircraft hydraulic systems are depressurized (Ref. AMM TASK 29-00-00-864-001).
Subtask 27-92-41-010-081-A (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the aircraft hydraulic systems are depressurized (Ref. AMM TASK 29-00-00-864-001).
B. Get Access
(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access door 822.
(2) Make sure that the access door 822 is open.
(3) On the battery power center 105VU:
Subtask 27-92-41-865-072-A (1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access door 822.
(2) Make sure that the access door 822 is open.
(3) On the battery power center 105VU:
- Make sure that the protective cover is removed.
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 27-92-41-860-065-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B11 |
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B08 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/AUDIO/ACP/F/O | 5RN | G07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/AUDIO/ACP/CAPT | 4RN | G06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/ACP F/O/BITE/ INT 2 AUDIO/3&5 OCCPNT | 5RN | G07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/ACP CAPT/SELCAL/INT 1 AUDIO/AVNCS | 4RN | G06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B06 |
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B03 |
| ** ON A/C ALL | |||
| 105VU | FLIGHT CONTROLS/ELAC2/STBY SPLY | 16CE2 | A02 |
| 105VU | FLT CTL/ELAC1/STBY SPLY | 16CE1 | A01 |
| 105VU | FLT CTL/SEC1/STBY SPLY | 22CE | B01 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | AUTO FLT/STICK/LOCK | 13CA | N16 |
| ** ON A/C ALL | |||
| 121VU | FLIGHT CONTROLS/SEC3/SPLY | 21CE3 | Q19 |
| 121VU | FLIGHT CONTROLS/SEC2/SPLY | 21CE2 | Q18 |
| 121VU | FLIGHT CONTROLS/ELAC2/NORM/SPLY | 15CE2 | R20 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | AUTO FLT/STICK/LOCK | 13CA | N18 |
D. Aircraft Maintenance Configuration
(1) Make sure that the cover panel is removed.
(2) Make sure that 98D27903500000 PIN-SIDE STICK LOCKING (10) is installed.
(3) Make sure that the WARNING NOTICE(S) which tells persons not to operate the side-stick is in position.
4. Procedure(1) Make sure that the cover panel is removed.
(2) Make sure that 98D27903500000 PIN-SIDE STICK LOCKING (10) is installed.
(3) Make sure that the WARNING NOTICE(S) which tells persons not to operate the side-stick is in position.
Subtask 27-92-41-210-056-A
A. Remove the protection from the side-stick opening and make sure that no unwanted materials went into the side-stick opening before you install the bellows (3).
Subtask 27-92-41-420-065-A B. Installation of the Bellows of the New-Generation Side-Stick
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Put the bellows (3) in position.
(4) Fold the bellows (3) on the control handle (1) and attach it with a new AIPC 27-92-41-03-030 COLLAR-CLAMP (2) as follows:
(a) Wind the collar-clamp (2) around the bellows (3).
(b) Tighten the collar-clamp (2).
(5) Put the bellows (3) in position on the support (5) and attach it with a new AIPC 27-92-41-03-050 LIGATURE CORD (4) as follows:
(a) Wind the ligature cord (4) around the bellows (3).
(b) Tighten the ligature cord (4) and attach it.
(c) Bond the knot with Silicone Adhesive Sealant-General Purpose One part legacy (Material No.06CMD9) .
5. Close-up(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Put the bellows (3) in position.
(4) Fold the bellows (3) on the control handle (1) and attach it with a new AIPC 27-92-41-03-030 COLLAR-CLAMP (2) as follows:
(a) Wind the collar-clamp (2) around the bellows (3).
(b) Tighten the collar-clamp (2).
(5) Put the bellows (3) in position on the support (5) and attach it with a new AIPC 27-92-41-03-050 LIGATURE CORD (4) as follows:
(a) Wind the ligature cord (4) around the bellows (3).
(b) Tighten the ligature cord (4) and attach it.
(c) Bond the knot with Silicone Adhesive Sealant-General Purpose One part legacy (Material No.06CMD9) .
Subtask 27-92-41-010-083-A
A. Remove the 98D27903500000 PIN-SIDE STICK LOCKING (10) and the warning notice from the side-stick.
Subtask 27-92-41-410-074-A ** ON A/C NOT FOR ALL B. Installation of the cover panel.
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Put the cover (3) in position.
(4) Install the washers (5), the washer (7), the screws (4) and the screw (6). Tighten the screws. Lock the catches (2).
(5) Release the lock (8). Install the handle (1).
Subtask 27-92-41-410-074-B ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Put the cover (3) in position.
(4) Install the washers (5), the washer (7), the screws (4) and the screw (6). Tighten the screws. Lock the catches (2).
(5) Release the lock (8). Install the handle (1).
B. Installation of the cover of the panel.
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Put the cover (3) in position.
(4) Install the screws (2) and tighten them.
(5) Install the washers (5), the washer (7), the screws (4) and the screw (6). Tighten the screws.
(6) Install the handle (1) and the screws (8). Tighten the screws.
Subtask 27-92-41-410-081-A ** ON A/C NOT FOR ALL Subtask 27-92-41-865-073-A (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Put the cover (3) in position.
(4) Install the screws (2) and tighten them.
(5) Install the washers (5), the washer (7), the screws (4) and the screw (6). Tighten the screws.
(6) Install the handle (1) and the screws (8). Tighten the screws.
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 27-92-41-942-055-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B11 |
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B08 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/AUDIO/ACP/F/O | 5RN | G07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/AUDIO/ACP/CAPT | 4RN | G06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/ACP F/O/BITE/ INT 2 AUDIO/3&5 OCCPNT | 5RN | G07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/ACP CAPT/SELCAL/INT 1 AUDIO/AVNCS | 4RN | G06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B06 |
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B03 |
| ** ON A/C ALL | |||
| 105VU | FLIGHT CONTROLS/ELAC2/STBY SPLY | 16CE2 | A02 |
| 105VU | FLT CTL/ELAC1/STBY SPLY | 16CE1 | A01 |
| 105VU | FLT CTL/SEC1/STBY SPLY | 22CE | B01 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | AUTO FLT/STICK/LOCK | 13CA | N16 |
| ** ON A/C ALL | |||
| 121VU | FLIGHT CONTROLS/SEC3/SPLY | 21CE3 | Q19 |
| 121VU | FLIGHT CONTROLS/SEC2/SPLY | 21CE2 | Q18 |
| 121VU | FLIGHT CONTROLS/ELAC2/NORM/SPLY | 15CE2 | R20 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | AUTO FLT/STICK/LOCK | 13CA | N18 |
E. Make sure that the work area is clean and clear of tools and other items.
Subtask 27-92-41-862-056-A Subtask 27-92-41-410-075-A G. Close Access
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.
(4) Remove the access platform(s).
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.
(4) Remove the access platform(s).
Cover Panel