Installation of the Control Handle
TASK 27-92-41-400-006-A
Installation of the Control Handle
Self Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 27-92-41-861-055-A Subtask 27-92-41-010-068-A
Subtask 27-92-41-420-055-A
Subtask 27-92-41-942-051-A
[Rev.10 from 2021]
2026.03.31 23:58:55 UTC
Installation of the Control Handle
NOTE: This task is not applicable for the new-generation side-stick unit. For the new-generation side-stick unit, refer to the procedure (Ref. AMM TASK 27-92-41-400-803). To know if the side-stick installed on the aircraft is a new-generation side-stick unit, refer to the procedure (Ref. AMM TASK 27-92-41-860-801).
1. Reason for the JobSelf Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.14QDB1) | Wire-Locking Dia: 0.5 mm (0.020 inch) CRES Nickel Alloy - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 211 | COCKPIT |
| 212 | COCKPIT |
| 822 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 23-12-00-710-001-A | Operational Test of the Very High Frequency (VHF) System |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 27-92-41-400-009-A | Installation of the Side Stick Bellows |
| TASK 27-92-41-710-001-A | Operational Test of the Side Stick Assembly |
| TASK 27-96-00-710-003-A | Operational Test of the Side Stick Priority |
Subtask 27-92-41-861-055-A Subtask 27-92-41-010-068-A
B. Get Access
(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access door 822.
(2) Make sure that the access door 822 is open.
(3) On the battery power center 105VU:
Subtask 27-92-41-865-056-A (1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access door 822.
(2) Make sure that the access door 822 is open.
(3) On the battery power center 105VU:
- make sure that the protective cover is removed.
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 27-92-41-869-063-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B11 |
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B08 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/AUDIO/ACP/F/O | 5RN | G07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/AUDIO/ACP/CAPT | 4RN | G06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/ACP F/O/BITE/ INT 2 AUDIO/3&5 OCCPNT | 5RN | G07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/ACP CAPT/SELCAL/INT 1 AUDIO/AVNCS | 4RN | G06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B06 |
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B03 |
| ** ON A/C ALL | |||
| 105VU | FLIGHT CONTROLS/ELAC2/STBY SPLY | 16CE2 | A02 |
| 105VU | FLT CTL/ELAC1/STBY SPLY | 16CE1 | A01 |
| 105VU | FLT CTL/SEC1/STBY SPLY | 22CE | B01 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | AUTO FLT/STICK/LOCK | 13CA | N16 |
| ** ON A/C ALL | |||
| 121VU | FLIGHT CONTROLS/SEC3/SPLY | 21CE3 | Q19 |
| 121VU | FLIGHT CONTROLS/SEC2/SPLY | 21CE2 | Q18 |
| 121VU | FLIGHT CONTROLS/ELAC2/NORM/SPLY | 15CE2 | R20 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | AUTO FLT/STICK/LOCK | 13CA | N18 |
D. Make sure that the bellows are removed.
4. ProcedureSubtask 27-92-41-420-055-A
A. Installation of the Control Handle
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the CAP-BLANKING from each electrical connector and receptacle.
(80) and (81).
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Connect the handle (75) to the electrical connectors (80). Install the washers (77) and (79) and the screws (76) and (78).
(6) Tighten the screws (76) and (78) and safety them with14QDB1 Wire-Locking Dia: 0.5 mm (0.020 inch) CRES Nickel Alloy - .
Subtask 27-92-41-410-055-A Subtask 27-92-41-210-051-A (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the CAP-BLANKING from each electrical connector and receptacle.
(80) and (81).
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Connect the handle (75) to the electrical connectors (80). Install the washers (77) and (79) and the screws (76) and (78).
(6) Tighten the screws (76) and (78) and safety them with
C. Check of the Side Stick Movement
(1) Make sure that the side stick :
(a) Is free to move.
(b) Has no friction point along its full range of operation.
(c) Comes correctly to its stops in all the directions.
(d) Goes back to the neutral position when you release it.
Subtask 27-92-41-865-064-A (1) Make sure that the side stick :
(a) Is free to move.
(b) Has no friction point along its full range of operation.
(c) Comes correctly to its stops in all the directions.
(d) Goes back to the neutral position when you release it.
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 27-92-41-710-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B11 |
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B08 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/AUDIO/ACP/F/O | 5RN | G07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/AUDIO/ACP/CAPT | 4RN | G06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/ACP F/O/BITE/ INT 2 AUDIO/3&5 OCCPNT | 5RN | G07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/ACP CAPT/SELCAL/INT 1 AUDIO/AVNCS | 4RN | G06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B06 |
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B03 |
| ** ON A/C ALL | |||
| 105VU | FLIGHT CONTROLS/ELAC2/STBY SPLY | 16CE2 | A02 |
| 105VU | FLT CTL/ELAC1/STBY SPLY | 16CE1 | A01 |
| 105VU | FLT CTL/SEC1/STBY SPLY | 22CE | B01 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | AUTO FLT/STICK/LOCK | 13CA | N16 |
| ** ON A/C ALL | |||
| 121VU | FLIGHT CONTROLS/SEC3/SPLY | 21CE3 | Q19 |
| 121VU | FLIGHT CONTROLS/SEC2/SPLY | 21CE2 | Q18 |
| 121VU | FLIGHT CONTROLS/ELAC2/NORM/SPLY | 15CE2 | R20 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | AUTO FLT/STICK/LOCK | 13CA | N18 |
E. Operational Test
(1) Do the operational test of the Side Stick Assembly (Ref. AMM TASK 27-92-41-710-001).
(2) Do the operational test of the AP disconnect/priority pushbutton switch (Ref. AMM TASK 27-96-00-710-003).
(3) Do the operational test of the radio PTT switch (Ref. AMM TASK 23-12-00-710-001).
5. Close-up(1) Do the operational test of the Side Stick Assembly (Ref. AMM TASK 27-92-41-710-001).
(2) Do the operational test of the AP disconnect/priority pushbutton switch (Ref. AMM TASK 27-96-00-710-003).
(3) Do the operational test of the radio PTT switch (Ref. AMM TASK 23-12-00-710-001).
Subtask 27-92-41-942-051-A
A. Make sure that the work area is clean and clear of tools and other items.
Subtask 27-92-41-862-053-A Subtask 27-92-41-410-066-A C. Close Access
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.
(4) Remove the access platform(s).
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.
(4) Remove the access platform(s).
Control Handle