W DOC AIRBUS | AMM A320F

Installation of the Control Handle


TASK 27-92-41-400-006-A
Installation of the Control Handle


NOTE: This task is not applicable for the new-generation side-stick unit. For the new-generation side-stick unit, refer to the procedure (Ref. AMM TASK 27-92-41-400-803). To know if the side-stick installed on the aircraft is a new-generation side-stick unit, refer to the procedure (Ref. AMM TASK 27-92-41-860-801).
ZONE: 211
ZONE: 212
FIN: 180VU
FIN: 191VU
1. Reason for the Job
Self Explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.14QDB1)
Wire-Locking Dia: 0.5 mm (0.020 inch) CRES Nickel Alloy -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
211
COCKPIT
212
COCKPIT
822
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 23-12-00-710-001-A
Operational Test of the Very High Frequency (VHF) System
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 27-92-41-400-009-A
Installation of the Side Stick Bellows
TASK 27-92-41-710-001-A
Operational Test of the Side Stick Assembly
TASK 27-96-00-710-003-A
Operational Test of the Side Stick Priority
3. Job Set-up
Subtask 27-92-41-861-055-A
A. Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
Subtask 27-92-41-010-068-A
B. Get Access
   (1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access door 822.
   (2) Make sure that the access door 822 is open.
   (3) On the battery power center 105VU:
  • make sure that the protective cover is removed.
Subtask 27-92-41-865-056-A
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B11
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B08
** ON A/C NOT FOR ALL
49VUCOM/AUDIO/ACP/F/O5RNG07
** ON A/C NOT FOR ALL
49VUCOM/AUDIO/ACP/CAPT4RNG06
** ON A/C NOT FOR ALL
49VUCOM/ACP F/O/BITE/ INT 2 AUDIO/3&5 OCCPNT5RNG07
** ON A/C NOT FOR ALL
49VUCOM/ACP CAPT/SELCAL/INT 1 AUDIO/AVNCS4RNG06
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B06
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B03
** ON A/C ALL
105VUFLIGHT CONTROLS/ELAC2/STBY SPLY16CE2A02
105VUFLT CTL/ELAC1/STBY SPLY16CE1A01
105VUFLT CTL/SEC1/STBY SPLY22CEB01
** ON A/C NOT FOR ALL
121VUAUTO FLT/STICK/LOCK13CAN16
** ON A/C ALL
121VUFLIGHT CONTROLS/SEC3/SPLY21CE3Q19
121VUFLIGHT CONTROLS/SEC2/SPLY21CE2Q18
121VUFLIGHT CONTROLS/ELAC2/NORM/SPLY15CE2R20
** ON A/C NOT FOR ALL
121VUAUTO FLT/STICK/LOCK13CAN18
Subtask 27-92-41-869-063-A
D. Make sure that the bellows are removed.
4. Procedure
Subtask 27-92-41-420-055-A
A. Installation of the Control Handle
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Remove the CAP-BLANKING from each electrical connector and receptacle.
(80) and (81).
   (4) Make sure that all the electrical connections are clean and in the correct condition.
   (5) Connect the handle (75) to the electrical connectors (80). Install the washers (77) and (79) and the screws (76) and (78).
   (6) Tighten the screws (76) and (78) and safety them with 14QDB1Wire-Locking Dia: 0.5 mm (0.020 inch) CRES Nickel Alloy -.
Subtask 27-92-41-410-055-A
B. Installation of the Bellows. (Ref. AMM TASK 27-92-41-400-009)
Subtask 27-92-41-210-051-A
C. Check of the Side Stick Movement
   (1) Make sure that the side stick :
     (a) Is free to move.
     (b) Has no friction point along its full range of operation.
     (c) Comes correctly to its stops in all the directions.
     (d) Goes back to the neutral position when you release it.
Subtask 27-92-41-865-064-A
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B11
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B08
** ON A/C NOT FOR ALL
49VUCOM/AUDIO/ACP/F/O5RNG07
** ON A/C NOT FOR ALL
49VUCOM/AUDIO/ACP/CAPT4RNG06
** ON A/C NOT FOR ALL
49VUCOM/ACP F/O/BITE/ INT 2 AUDIO/3&5 OCCPNT5RNG07
** ON A/C NOT FOR ALL
49VUCOM/ACP CAPT/SELCAL/INT 1 AUDIO/AVNCS4RNG06
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B06
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B03
** ON A/C ALL
105VUFLIGHT CONTROLS/ELAC2/STBY SPLY16CE2A02
105VUFLT CTL/ELAC1/STBY SPLY16CE1A01
105VUFLT CTL/SEC1/STBY SPLY22CEB01
** ON A/C NOT FOR ALL
121VUAUTO FLT/STICK/LOCK13CAN16
** ON A/C ALL
121VUFLIGHT CONTROLS/SEC3/SPLY21CE3Q19
121VUFLIGHT CONTROLS/SEC2/SPLY21CE2Q18
121VUFLIGHT CONTROLS/ELAC2/NORM/SPLY15CE2R20
** ON A/C NOT FOR ALL
121VUAUTO FLT/STICK/LOCK13CAN18
Subtask 27-92-41-710-051-A
E. Operational Test
   (1) Do the operational test of the Side Stick Assembly (Ref. AMM TASK 27-92-41-710-001).
   (2) Do the operational test of the AP disconnect/priority pushbutton switch (Ref. AMM TASK 27-96-00-710-003).
   (3) Do the operational test of the radio PTT switch (Ref. AMM TASK 23-12-00-710-001).
5. Close-up
Subtask 27-92-41-942-051-A
A. Make sure that the work area is clean and clear of tools and other items.
Subtask 27-92-41-862-053-A
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
Subtask 27-92-41-410-066-A
C. Close Access
   (1) Install the protective cover on the battery power center 105VU.
   (2) Tighten the two screws.
   (3) Close the access door 822.
   (4) Remove the access platform(s).