W DOC AIRBUS | AMM A320F

Installation of the Lighted Plate


TASK 27-92-14-400-002-A
Installation of the Lighted Plate


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
ZONE: 210
1. Reason for the Job
Self Explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.05BAE1)
Threadlocking Adhesive-- Medium strength -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
822
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
15
O-RING
AIPC 27-92-14-01-030
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 29-10-00-864-003-A
Depressurize the Blue Hydraulic System
TASK 29-23-00-864-001-A
Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU
TASK 29-24-00-864-001-A
Depressurize the Yellow Hydraulic System
3. Job Set-up
Subtask 27-92-14-860-053-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the SPEED BRAKE control lever is in the RET position.
   (2) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-23-00-864-001) (Ref. AMM TASK 29-24-00-864-001) (Ref. AMM TASK 29-10-00-864-003).
   (3) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access door 822.
   (4) Make sure that the access door 822 is open.
   (5) On the battery power center 105VU:
  • make sure that the protective cover is removed.
Subtask 27-92-14-875-051-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B08
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B03
** ON A/C ALL
105VUFLT CTL/SEC1/STBY SPLY22CEB01
121VUFLIGHT CONTROLS/SEC3/SPLY21CE3Q19
121VUFLIGHT CONTROLS/SEC2/SPLY21CE2Q18
122VULIGHTING/INSTL LT/MAIN INST/PNL AND/PED4LFY04
Subtask 27-92-14-865-054-A
DELETED
4. Procedure
Subtask 27-92-14-420-052-A
A. Installation of the Lighted Plate
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Put the lighted plate (13) in position on the unit
   (4) Install the screws (12).
   (5) Install the new AIPC 27-92-14-01-030 O-RING (15) on the lever (14).
   (6) Install the handle (10).
   (7) Install the slot-headed screw (11) with Threadlocking Adhesive-- Medium strength - (Material No.
05BAE1) .
Subtask 27-92-14-875-052-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B08
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B03
** ON A/C ALL
105VUFLT CTL/SEC1/STBY SPLY22CEB01
121VUFLIGHT CONTROLS/SEC3/SPLY21CE3Q19
121VUFLIGHT CONTROLS/SEC2/SPLY21CE2Q18
122VULIGHTING/INSTL LT/MAIN INST/PNL AND/PED4LFY04
Subtask 27-92-14-865-055-A
DELETED
Subtask 27-92-14-210-051-A
D. Do this test
   (1) Make sure that the speedbrake control lever is free to move along its travel.
   (2) Make sure that each hard point agrees with the position mark on the unit.
   (3) Make sure that it is possible to do the GND SPLRS ARMED preselection.
   (4) Put again the lever in the RET position.
5. Close-up
Subtask 27-92-14-410-051-A
A. Close Access
   (1) Install the protective cover on the battery power center 105VU.
   (2) Tighten the two screws.
   (3) Close the access door 822.
   (4) Remove the access platform(s).
   (5) Make sure that the work area is clean and clear of tools and other items.
[Rev.10 from 2021] 2026.03.31 23:58:34 UTC