W DOC AIRBUS | AMM A320F

Installation of the Torque Shaft


TASK 27-84-45-400-014-A
Installation of the Torque Shaft


WARNING: MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 6046CM
FIN: 6096CM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
SAFETY BARRIER(S)
No specific
AR
WARNING NOTICE(S)
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03FDB1)
Mineral Oil base Grease-Anti-Fretting Paste -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 27-81-42-000-001-A
Removal of the PPU Adaptor Plate
TASK 27-81-42-400-001-A
Installation of the PPU Adaptor Plate
3. Job Set-up
Subtask 27-84-45-941-077-A
A. Safety Precautions
   (1) Make sure that the SAFETY BARRIER(S) are in position.
   (2) Make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the slat controls.
Subtask 27-84-45-860-063-A
B. Aircraft Maintenance Configuration
   (1) Make sure that the access platform is in position below the applicable zone 522(622).
   (2) Make sure that the adapter plate of the PPU has been removed (Ref. AMM TASK 27-81-42-000-001).
Subtask 27-84-45-865-095-A
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/SLT/CTL AND MONG/SYS15CVB06
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/SLT/CTL AND MONG/SYS15CVB01
** ON A/C ALL
121VUFLIGHT CONTROLS/SLT/CTL/SYS27CVR21
4. Procedure
Subtask 27-84-45-420-087-A
A. Preparation for Installation
   (1) Clean the component interface and /or the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (4) Apply a thin layer of Mineral Oil base Grease-Anti-Fretting Paste - (Material No.03FDB1) to the torque shaft splines.
Subtask 27-84-45-420-063-A
B. Installation of the Torque Shaft 6046CM(6069CM)
   (1) Install the shaft (47).
   (2) Install the PPU adaptor plate (Ref. AMM TASK 27-81-42-400-001).
   (3) Make sure that:
Subtask 27-84-45-710-062-A
C. Test
   (1) The operational test of the slat power-transmission system is contained in the installation of the PPU adaptor plate (Ref. AMM TASK 27-81-42-400-001).
5. Close-up
Subtask 27-84-45-865-096-A
A. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/SLT/CTL AND MONG/SYS15CVB06
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/SLT/CTL AND MONG/SYS15CVB01
** ON A/C ALL
121VUFLIGHT CONTROLS/SLT/CTL/SYS27CVR21
Subtask 27-84-45-942-062-A
B. Removal of Equipment
   (1) Remove the safety barriers.
   (2) Remove the WARNING NOTICE(S).
   (3) Remove the access platform(s).
   (4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.