W DOC AIRBUS | AMM A320F

Installation of the Torque Shaft


TASK 27-54-45-400-006-A
Installation of the Torque Shaft


WARNING: MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
CAUTION: BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
  • DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
  • DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
  • MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY. INCORRECT INSTALLATION CAN CAUSE DAMAGE.
FIN: 6212CM
FIN: 6262CM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
No specific
AR
SAFETY BARRIER(S)
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 0.44 and 0.36 m.daN (38.94 and 31.86 lbf.in ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03FDB1)
Mineral Oil base Grease-Anti-Fretting Paste -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.12ACC1)
Corrosion Preventive Compound-Heavy Duty Soft Film -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [6212CM] (FLAP XMSN TORQUE SHAFT)
573BB
FOR [6262CM] (FLAP XMSN TORQUE SHAFT)
673BB
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
49
COTTER PIN
AIPC 27-54-44-01-010
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 27-50-00-400-003-A
Installation of the Lock-Torque Shaft - Flaps and Slats (98D27504030001)
TASK 27-50-00-866-008-A
Extension of the Flaps on the Ground
TASK 27-50-00-866-008-A-01
Extension of the Flaps/Slats on the Ground
TASK 27-50-00-866-009-A
Retraction of the Flaps on the Ground
TASK 27-50-00-866-009-A-01
Retraction of the Flaps/Slats on the Ground
TASK 27-54-00-710-001-A
Operational Test of the Flap System
TASK 27-54-45-000-007-A
Removal of the Torque Shafts
TASK 27-54-45-400-007-A
Installation of the Torque Shafts
TASK 57-51-37-000-002-A
Removal of the Access Panels 571AB(671AB), 573AB(673AB), 573BB(673BB), 573CB(673CB), 573EB(673EB)
TASK 57-51-37-400-002-A
Installation of the Access Panels 571AB(671AB), 573AB(673AB), 573BB(673BB), 573CB(673CB), 573EB(673EB)
3. Job Set-up
Subtask 27-54-45-941-082-A
A. Safety Precautions
   (1) Make sure that the SAFETY BARRIER(S) are in position.
   (2) Make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the flap/slat controls.
Subtask 27-54-45-860-068-A
B. Aircraft Maintenance Configuration
WARNING: MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
   (1) Make sure that the flaps are fully extended (Ref. AMM TASK 27-50-00-866-008).
   (2) Make sure that the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on the flap/slat control lever on panel 114VU.
   (3) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in the applicable position.
   (4) Make sure that the applicable access panel is removed (Ref. AMM TASK 57-51-37-000-002):
  • for 6212CM, panel 573BB
  • for 6262CM, panel 673BB.
   (5) Make sure that the torque shaft(s) 6214CM(6264CM) is/are removed (Ref. AMM TASK 27-54-45-000-007).
   (6) Make sure that the 98D27504030001 LOCK-TORQUE SHAFT (FLAPS AND SLATS) WITH CLAMP-PIVOT is installed on the flap torque shaft (Ref. AMM TASK 27-50-00-400-003), outboard of the removed component.
Subtask 27-54-45-865-075-A
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/FLP/CTL AND MONG/SYS16CVB07
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/FLP/CTL AND MONG/SYS16CVB02
** ON A/C ALL
121VUFLIGHT CONTROLS/FLP/CTL AND/MONG/SYS28CVQ21
4. Procedure
CAUTION: BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
  • DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
  • DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
  • MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY. INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-420-068-A
A. Preparation for Installation
   (1) Clean the parts:
     (a) Use a clean Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) to clean the:
  • nut (50) and the bolt (45)
  • washers (46) and (51)
  • cotter pin (49).
   (2) Dry the parts:
WARNING: WHEN YOU USE COMPRESSED AIR:
  • USE THE CORRECT PROTECTION (FACE SHIELD OR GOGGLES)
  • DO NOT POINT THE AIRFLOW AT YOURSELF OR OTHER PERSONS.
LOOSE PARTICLES AND/OR HIGH PRESSURE AIR CAN CAUSE INJURY.
WARNING: DO NOT LET COMPRESSED GAS TOUCH YOUR SKIN. THE GAS CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD. THIS CONDITION CAN KILL YOU.
     (a) Use compressed air to dry the cleaned areas.
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (4) Do an inspection of the component interfaces and the adjacent area.
   (5) Apply a thin layer of Mineral Oil base Grease-Anti-Fretting Paste - (Material No.03FDB1) to the torque shaft splines.
Subtask 27-54-45-420-055-A
B. Installation of the Torque Shaft 6212CM(6262CM)
   (1) Install the torque shaft (48) through the steady bearing (47) and engage it in the track 2 flap actuator.
   (2) Attach the torque shaft (48) through the steady bearing (47) with the bolt (45), the washers (46) and (51) and the nut (50).
   (3) TORQUE the nut (50) to between 0.44 and 0.36 m.daN (38.94 and 31.86 lbf.in ) T.
   (4) Install a new
AIPC 27-54-44-01-010 COTTER PIN (49).
   (5) Install the torque shaft (52) 6214CM(6264CM) (
Ref. AMM TASK 27-54-45-400-007).
   (6) Remove the 98D27504030001 LOCK-TORQUE SHAFT (FLAPS AND SLATS) WITH CLAMP-PIVOT (Ref. AMM TASK 27-50-00-400-003).
Subtask 27-54-45-916-055-A
C. Application of Special Materials
   (1) Apply a layer of Corrosion Preventive Compound-Heavy Duty Soft Film - (Material No.12ACC1) to the:
  • bolt (45) and the nut (50)
  • washers (46) and (51)
  • cotter pin (49).
Subtask 27-54-45-865-102-A
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/FLP/CTL AND MONG/SYS16CVB07
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/FLP/CTL AND MONG/SYS16CVB02
** ON A/C ALL
121VUFLIGHT CONTROLS/FLP/CTL AND/MONG/SYS28CVQ21
Subtask 27-54-45-710-055-A
E. Operational Test of the Flap System
   (1) Remove the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the flap/slat control lever.
   (2) Retract the flaps fully (Ref. AMM TASK 27-50-00-866-009).
   (3) Do an operational test of the flap system (Ref. AMM TASK 27-54-00-710-001). Make sure that the operation of the torque shafts is satisfactory.
5. Close-up
Subtask 27-54-45-410-061-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the applicable access panel (Ref. AMM TASK 57-51-37-400-002):
     (a) FOR [6212CM] (FLAP XMSN TORQUE SHAFT)
install 573BB
     (b) FOR [6262CM] (FLAP XMSN TORQUE SHAFT)
install 673BB.
Subtask 27-54-45-942-055-A
B. Removal of Equipment
   (1) Remove the safety barriers.
   (2) Remove the WARNING NOTICE(S).
   (3) Remove the access platform(s).
   (4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
[Rev.10 from 2021] 2026.03.31 23:53:31 UTC