W DOC AIRBUS | AMM A320F

Installation of the Aileron Servo-Control Servovalve


TASK 27-14-51-400-003-A
Installation of the Aileron Servo-Control Servovalve


WARNING: MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION: BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
  • DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
  • DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
  • MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY. INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 4M (13 FT)
No specific
AR
SAFETY BARRIER(S)
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 0.41 and 0.33 m.daN (36.28 and 29.20 lbf.in ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03LDA1)
Grease-Hydraulic Systems - -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14QFB1)
Wire-Locking Dia: 0.8 mm CRES Nickel Alloy -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
575KB, 675KB
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
5
PACKING
AIPC 27-14-51-01-120
4
PACKING
AIPC 27-14-51-01-170
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 27-14-00-710-001-A
Operational Test of the Aileron and Hydraulic Actuation
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-10-00-864-001-A
Depressurize the Green Hydraulic System
TASK 29-10-00-864-003-A
Depressurize the Blue Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-23-00-860-001-A
Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 29-23-00-860-002-A
Connection of the Isolation Coupling of the Power Transfer Unit (PTU)
3. Job Set-up
Subtask 27-14-51-941-069-A
A. Safety Precautions
   (1) Make sure that the SAFETY BARRIER(S) are in position.
   (2) Make sure that the WARNING NOTICE(S) is in the cockpit to tell persons not to pressurize the Green or the Blue hydraulic systems.
   (3) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
Subtask 27-14-51-860-062-A
B. Aircraft Maintenance Configuration
   (1) Make sure that the Isolation Coupling of the Power Transfer Unit (PTU) is disconnected (Ref. AMM TASK 29-23-00-860-001).
   (2) Make sure that the Green and the Blue hydraulic systems are depressurized (Ref. AMM TASK 29-10-00-864-001) (Ref. AMM TASK 29-10-00-864-003).
   (3) Make sure that the Green and the Blue hydraulic system reservoirs are depressurized (Ref. AMM TASK 29-14-00-614-001).
   (4) Make sure that the ACCESS PLATFORM 4M (13 FT) is in position below the applicable zone 575(675).
   (5) Make sure that the applicable access panel is removed:
  • for the left wing, panel 575KB
  • for the right wing, panel 675KB.
Subtask 27-14-51-865-057-A
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B11
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B06
** ON A/C ALL
105VUFLIGHT CONTROLS/ELAC2/STBY SPLY16CE2A02
105VUFLT CTL/ELAC1/STBY SPLY16CE1A01
121VUFLIGHT CONTROLS/ELAC2/NORM/SPLY15CE2R20
4. Procedure
CAUTION: BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
  • DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
  • DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
  • MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY. INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-14-51-420-061-A
A. Preparation for Installation
   (1) Remove the protective cover from the aileron servo-control servovalve interface.
   (2) Clean the component interface and or the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
   (3) Do an inspection of the component interfaces and the adjacent area.
   (4) Lubricate the new AIPC 27-14-51-01-170 PACKING (4) and the new AIPC 27-14-51-01-120 PACKING (5) with Grease-Hydraulic Systems - - (Material No.03LDA1) .
Subtask 27-14-51-420-052-A
B. Installation of the Aileron Servo-Control Servovalve
WARNING: USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
   (1) Install the new packing (5) on the electrical connector (6) of the aileron servo- control.
   (2) Install the new packings (4) on the aileron servo-control interface.
   (3) Put the servovalve (3) in position on the aileron servo-control and install the washers (2) and the bolts (1).
   (4) TORQUE the bolts (1) to between 0.41 and 0.33 m.daN (36.28 and 29.20 lbf.in ) T.
   (5) Safety the bolts (1) with 14QFB1Wire-Locking Dia: 0.8 mm CRES Nickel Alloy -.
Subtask 27-14-51-860-063-A
C. Aircraft Maintenance Configuration
   (1) Connect the Isolation Coupling of the Power Transfer Unit (PTU) (
Ref. AMM TASK 29-23-00-860-002).
   (2) Remove the container from under the servovalve (3).
   (3) Make sure that the work area is clean and clear of tools and other items.
Subtask 27-14-51-865-058-A
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B11
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B06
** ON A/C ALL
105VUFLIGHT CONTROLS/ELAC2/STBY SPLY16CE2A02
105VUFLT CTL/ELAC1/STBY SPLY16CE1A01
121VUFLIGHT CONTROLS/ELAC2/NORM/SPLY15CE2R20
Subtask 27-14-51-710-052-A
E. Test
   (1) Do an operational test of the aileron (Ref. AMM TASK 27-14-00-710-001).
   (2) Examine the servovalve (3) for leaks.
5. Close-up
Subtask 27-14-51-410-052-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the applicable access panel:
  • for the left wing, panel 575KB
  • for the right wing, panel 675KB.
Subtask 27-14-51-942-056-A
B. Removal of Equipment
   (1) Remove the safety barriers.
   (2) Remove the WARNING NOTICE(S).
   (3) Remove the access platform(s).
   (4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
[Rev.10 from 2021] 2026.03.31 23:47:37 UTC