Removal of the Engine Fire-Extinguishing Bottle for In-Shop Hydrostatic Test and Check of the Pressure Switch Setting
TASK 26-21-41-280-002-A
Removal of the Engine Fire-Extinguishing Bottle for In-Shop Hydrostatic Test and Check of the Pressure Switch Setting
Refer to the MPD TASK: 262141-02
REMOVE ENGINE FIRE EXTINGUISHING BOTTLE FOR IN SHOP HYDROSTATIC TEST AND CHECK PRESSURE SWITCH SETTING.
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 26-21-41-020-054-A 4. Procedure
Subtask 26-21-41-280-051-A
Subtask 26-21-41-420-054-A
[Rev.10 from 2021]
2026.03.31 23:45:05 UTC
Removal of the Engine Fire-Extinguishing Bottle for In-Shop Hydrostatic Test and Check of the Pressure Switch Setting
ZONE: 415
ZONE: 425
FIN: 1WM1
FIN: 1WM2
FIN: 2WM1
FIN: 2WM2
FIN: 5WE1
FIN: 5WE2
FIN: 6WE1
FIN: 6WE2
FIN: 7WE1
FIN: 7WE2
FIN: 8WE1
FIN: 8WE2
1. Reason for the JobZONE: 425
FIN: 1WM1
FIN: 1WM2
FIN: 2WM1
FIN: 2WM2
FIN: 5WE1
FIN: 5WE2
FIN: 6WE1
FIN: 6WE2
FIN: 7WE1
FIN: 7WE2
FIN: 8WE1
FIN: 8WE2
Refer to the MPD TASK: 262141-02
REMOVE ENGINE FIRE EXTINGUISHING BOTTLE FOR IN SHOP HYDROSTATIC TEST AND CHECK PRESSURE SWITCH SETTING.
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 415 | LOWER PYLON |
| 425 | LOWER PYLON |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 26-21-41-000-001-A | Removal of the Engine Fire-Extinguisher Bottle |
| TASK 26-21-41-000-001-E | Removal of the Engine Fire-Extinguisher Bottle |
| TASK 26-21-41-400-001-A | Installation of the Engine Fire-Extinguisher Bottle |
| TASK 26-21-41-400-001-E | Installation of the Engine Fire-Extinguisher Bottle |
Subtask 26-21-41-020-054-A 4. Procedure
Subtask 26-21-41-280-051-A
A. Send the engine fire-extinguisher bottle to the workshop for the hydrostatic test and to do a check of the pressure switch setting.
5. Close-upSubtask 26-21-41-420-054-A