Reactivation of the Smoke-Detection Control Unit (SDCU)
TASK 26-17-00-440-802-A
Reactivation of the Smoke-Detection Control Unit (SDCU)
1. Reason for the Job
MMEL 26-17-02A
SMOKE DETECTION CONTROL UNIT (SDCU) (FAA ONLY)
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 26-17-00-861-059-A ** ON A/C NOT FOR ALL
Subtask 26-17-00-440-051-A ** ON A/C NOT FOR ALL
Subtask 26-17-00-862-060-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:44:03 UTC
Reactivation of the Smoke-Detection Control Unit (SDCU)
1. Reason for the Job
MMEL 26-17-02A
SMOKE DETECTION CONTROL UNIT (SDCU) (FAA ONLY)
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | LABEL - INOPERATIVE DO NOT ENTER |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
Subtask 26-17-00-861-059-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
4. Procedure(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 26-17-00-440-051-A ** ON A/C NOT FOR ALL
A. Reactivation
(1) Do the trouble shooting of the SDCU with the Fault Symptoms as entry into the TSM.
(2) Remove the placard LABEL - INOPERATIVE DO NOT ENTER from the related lavatory door.
(3) Unlock the related lavatory door.
(4) Remove the WARNING NOTICE(S).
5. Close-up(1) Do the trouble shooting of the SDCU with the Fault Symptoms as entry into the TSM.
(2) Remove the placard LABEL - INOPERATIVE DO NOT ENTER from the related lavatory door.
(3) Unlock the related lavatory door.
(4) Remove the WARNING NOTICE(S).
Subtask 26-17-00-862-060-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
(1) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
(1) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).