Installation of the Smoke Detector - Avionics Compartment
TASK 26-15-15-400-001-A
Installation of the Smoke Detector - Avionics Compartment
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 26-15-15-010-051-A
Subtask 26-15-15-420-050-A
Subtask 26-15-15-410-050-A
[Rev.10 from 2021]
2026.03.31 23:43:48 UTC
Installation of the Smoke Detector - Avionics Compartment
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | CLEANING EQUIPMENT - COMPRESSOR |
| No specific | Torque wrench: range to between 0.033 and 0.027 m.daN (2.92 and 2.39 lbf.in ) ![]() |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 128 | REAR AVIONIC COMPARTMENT |
| 824 |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 3 | O-RINGS | AIPC 26-15-01-01-020 |
| 3 | O-RINGS | AIPC 26-15-81-01-080 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 26-15-00-710-001-A | Operational Test of the Avionics Smoke Detection |
| TASK 52-41-00-010-002-A | Open the Avionics Compartment Doors for Access |
| TASK 52-41-00-410-002-A | Close the Avionics Compartment Doors after Access |
Subtask 26-15-15-010-051-A
A. Get Access
(1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position.
(3) Make sure that access door 824 is open (Ref. AMM TASK 52-41-00-010-002).
Subtask 26-15-15-865-051-A (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position.
(3) Make sure that access door 824 is open (Ref. AMM TASK 52-41-00-010-002).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR COND/AVNCS VENT/CTL | 5HQ | D05 |
Subtask 26-15-15-420-050-A
A. Installation of the Smoke Detector
(2) Clean the component interfaces and the adjacent area.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Remove the PLUG - BLANKING from the couplings (4) and the smoke detector (1).
(5) Make sure that the couplings (4) have no blockage. If necessary clean the couplings (4) with the CLEANING EQUIPMENT - COMPRESSOR.
(6) Install the new AIPC 26-15-01-01-020 O-RINGS (3)AIPC 26-15-81-01-080 O-RINGS (3) on the couplings (4).
(7) If applicable, install the protective strip (8) on the smoke detector (1).
(8) Install the protective band (9) on the smoke detector (1).
(9) Put the smoke detector (1) in position on the couplings (4).
(10) Make sure that the locator of the smoke detector (1) is correctly installed behind the label on the ventilation duct (5).
(11) Close the clamp (6) on the protective band (9). Tighten the locknut (7).
(12) TORQUE the locknut (7) to between 0.033 and 0.027 m.daN (2.92 and 2.39 lbf.in )
.
(13) Remove the CAP-BLANKING from each electrical connector and receptacle.
(14) Make sure that all the electrical connections are clean and in the correct condition.
(15) Connect the electrical connector (2) to the applicable electrical receptacle of the smoke detector (1).
(16) If the protective cap (10) is attached to the harness (11), install it on the applicable electrical receptacle of the smoke detector (1).
(17) Make sure that the protective cap (10) is in the correct position on the smoke detector (1).
Subtask 26-15-15-865-052-A CAUTION:
MAKE SURE THAT THE ELECTRICAL CONNECTOR IS CLEAN BEFORE YOU DISCONNECT/CONNECT IT. CONTAMINATION OF THE ELECTRICAL CONNECTOR CAN CAUSE INCORRECT FIRE DETECTION.
(1) Make sure that the parts retained from the removed component are clean and in the correct condition.(2) Clean the component interfaces and the adjacent area.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Remove the PLUG - BLANKING from the couplings (4) and the smoke detector (1).
(5) Make sure that the couplings (4) have no blockage. If necessary clean the couplings (4) with the CLEANING EQUIPMENT - COMPRESSOR.
(6) Install the new AIPC 26-15-01-01-020 O-RINGS (3)AIPC 26-15-81-01-080 O-RINGS (3) on the couplings (4).
(7) If applicable, install the protective strip (8) on the smoke detector (1).
(8) Install the protective band (9) on the smoke detector (1).
(9) Put the smoke detector (1) in position on the couplings (4).
(10) Make sure that the locator of the smoke detector (1) is correctly installed behind the label on the ventilation duct (5).
(11) Close the clamp (6) on the protective band (9). Tighten the locknut (7).
(12) TORQUE the locknut (7) to between 0.033 and 0.027 m.daN (2.92 and 2.39 lbf.in )
. (13) Remove the CAP-BLANKING from each electrical connector and receptacle.
(14) Make sure that all the electrical connections are clean and in the correct condition.
(15) Connect the electrical connector (2) to the applicable electrical receptacle of the smoke detector (1).
(16) If the protective cap (10) is attached to the harness (11), install it on the applicable electrical receptacle of the smoke detector (1).
(17) Make sure that the protective cap (10) is in the correct position on the smoke detector (1).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 26-15-15-710-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR COND/AVNCS VENT/CTL | 5HQ | D05 |
C. Operational Test
(1) Do the operational test of the avionics smoke detection system from the MCDU. (Ref. AMM TASK 26-15-00-710-001)
5. Close-up(1) Do the operational test of the avionics smoke detection system from the MCDU. (Ref. AMM TASK 26-15-00-710-001)
Subtask 26-15-15-410-050-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close access door 824 (Ref. AMM TASK 52-41-00-410-002).
(3) Remove the access platform(s).
Subtask 26-15-15-862-052-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close access door 824 (Ref. AMM TASK 52-41-00-410-002).
(3) Remove the access platform(s).
B. Put the aircraft back to its initial configuration.
(1) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
(1) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
Smoke Detector