Installation of the Core Engine Fire Detection Elements with the Rail
TASK 26-12-17-400-805-A
Installation of the Core Engine Fire Detection Elements with the Rail
Two persons are necessary to do this task
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 26-12-17-861-070-A Subtask 26-12-17-941-066-A
Subtask 26-12-17-420-066-A
Subtask 26-12-17-860-079-A Subtask 26-12-17-410-070-A
[Rev.10 from 2021]
2026.03.31 23:43:20 UTC
Installation of the Core Engine Fire Detection Elements with the Rail
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobTwo persons are necessary to do this task
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.CP2442) | engine oil |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 450 | ENG 1 THRUST REVERSER & EXHAUST SECTION |
| 460 | ENG 2 THRUST REVERSER & EXHAUST SECTION |
| FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 26-12-00-710-001-A | Operational Check of Loop/Squib |
| TASK 26-12-17-400-804-A | Installation of the Core Engine Fire Detection Elements |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 71-13-00-010-803-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-803-A | Closing of the Fan Cowl Doors |
| TASK 78-30-00-040-807-A | Deactivation of the Thrust Reverser System for Nacelle Maintenance (ICU) |
| TASK 78-30-00-440-807-A | Reactivation of the Thrust Reverser System after Nacelle Maintenance (ICU) |
| TASK 78-36-00-010-806-A | Opening of the Thrust Reverser Cowl Doors |
| TASK 78-36-00-410-806-A | Closing of the Thrust Reverser Cowl Doors |
Subtask 26-12-17-861-070-A Subtask 26-12-17-941-066-A
B. Safety Precautions
(1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Make sure that the WARNING NOTICE(S) are in position to tell persons not to operate:
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Make sure that the WARNING NOTICE(S) is in position to tell persons not to energize FADEC 1(2).
Subtask 26-12-17-865-079-A (1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Make sure that the WARNING NOTICE(S) are in position to tell persons not to operate:
- The ENG/MODE selector switch, and
- The ENG/MASTER 1(2) control switch.
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Make sure that the WARNING NOTICE(S) is in position to tell persons not to energize FADEC 1(2).
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 26-12-17-010-092-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| FOR FIN: 4020KM1 (POWER PLANTDEMOUNTABLE, ENGINE 1) | |||
| 49VU | ENGINE/1/FIRE DET/LOOP A | 7WD1 | A06 |
| 121VU | ENGINE/ENG1/FIRE DET/LOOP B | 8WD1 | Q38 |
| FOR FIN: 4020KM2 (POWER PLANTDEMOUNTABLE, ENGINE 2) | |||
| 49VU | ENGINE/2/FIRE DET/LOOP B | 8WD2 | A07 |
| 121VU | ENGINE/ENG2/FIRE DET/LOOP A | 7WD2 | Q39 |
D. Get Access
(1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL 448AR
Subtask 26-12-17-040-071-A (1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL 448AR
E. Deactivation of the Thrust Reverser System for Maintenance
Subtask 26-12-17-010-093-A WARNING:
YOU MUST DEACTIVATE THE THRUST REVERSER BEFORE YOU DO WORK ON OR AROUND IT. IF YOU DO NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND CAUSE AN INJURY AND/OR DAMAGE.
(1) Make sure that you did the deactivation of the thrust reverser system for maintenance (Ref. AMM TASK 78-30-00-040-807). F. Get Access
(1) Make sure that the thrust reverser cowl-doors are open (Ref. AMM TASK 78-36-00-010-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
461AL 462AR
(2) Make sure that the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE is in position.
4. Procedure(1) Make sure that the thrust reverser cowl-doors are open (Ref. AMM TASK 78-36-00-010-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
461AL 462AR
(2) Make sure that the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE is in position.
Subtask 26-12-17-420-066-A
A. Installation of the Core Engine Fire Detection Elements with the Rail
(1) Lubricate the threads of the bolts (6) and the screws (27) with engine oil (Material No.CP2442) .
(2) Before you install the left fire detection element rail (3) and the right fire detection element rail (22), examine the assembly as follows:
(a) Make sure that the fire loop and responders (2) are correctly installed on the left and right fire detection element rails (3) and (22) (Ref. AMM TASK 26-12-17-400-804).
(b) Make sure that the bolt (17) and nut (18) that connect the left and right rails (3) and (22) are installed but not tightened. This connection is a joint that moves to permit installation of the left and right rails.
(c) Make sure that the 15 loop clamps (5) are installed in the correct position around the left and right rails (3) and (22). Use the record made during the disassembly to get the correct positions.
(3) Use two mechanics to carefully put the core engine fire detection elements in position on the engine. Align the tabs of the loop clamps (5) with the mating engine brackets (4), (7), (8), (9), (10), (11), (12), (13), (14), (15), (16), (19), (20), (21) and (23).
(5) TORQUE the 15 bolts (6) at each of the 15 loop clamps (5) to between 0.79 and 0.68 m.daN (69.91 and 60.18 lbf.in )
.
(6) TORQUE the nut (18) at the joint between the left and right rails (3) and (22) to between 0.79 and 0.68 m.daN (69.91 and 60.18 lbf.in )
.
(7) On the left side of the engine, connect the harness (1) to the left fire detection element rail (3) as follows:
(a) Put the harness (1) in position and put the two ring connectors on the two studs of the responder (2).
(8) On the right side of the engine, connect the harness (1) to the right fire detection element rail (22) as follows:
(a) Put the harness (1) in position and put the two ring connectors on the two studs of the responder (2).
(9) On the left side and on the right side of the engine, complete the connection of the harness (1) to the responders (2) as follows:
(a) TORQUE the larger nuts (24) to between 0.62 and 0.56 m.daN (54.87 and 49.56 lbf.in )
.
(b) TORQUE the smaller nuts (25) to between 0.51 and 0.45 m.daN (45.13 and 39.82 lbf.in )
.
(c) Install the screws (27) and the retainers (26) to attach the left and right harnesses (1) to the responders (2).
(d) TORQUE the screws (27) to between 0.34 and 0.28 m.daN (30.09 and 24.78 lbf.in )
.
Subtask 26-12-17-865-080-A (1) Lubricate the threads of the bolts (6) and the screws (27) with engine oil (Material No.CP2442) .
(2) Before you install the left fire detection element rail (3) and the right fire detection element rail (22), examine the assembly as follows:
(a) Make sure that the fire loop and responders (2) are correctly installed on the left and right fire detection element rails (3) and (22) (Ref. AMM TASK 26-12-17-400-804).
(b) Make sure that the bolt (17) and nut (18) that connect the left and right rails (3) and (22) are installed but not tightened. This connection is a joint that moves to permit installation of the left and right rails.
(c) Make sure that the 15 loop clamps (5) are installed in the correct position around the left and right rails (3) and (22). Use the record made during the disassembly to get the correct positions.
(3) Use two mechanics to carefully put the core engine fire detection elements in position on the engine. Align the tabs of the loop clamps (5) with the mating engine brackets (4), (7), (8), (9), (10), (11), (12), (13), (14), (15), (16), (19), (20), (21) and (23).
NOTE: During installation of the left fire detection element rail, a potential clash exists between the rail and an EBU duct. It may be necessary for a mechanic to clamp the duct by hand to prevent the clash.
(4) Install and hand-tighten the 15 bolts (6) to attach the loop clamps (5) to the engine. (5) TORQUE the 15 bolts (6) at each of the 15 loop clamps (5) to between 0.79 and 0.68 m.daN (69.91 and 60.18 lbf.in )
. (6) TORQUE the nut (18) at the joint between the left and right rails (3) and (22) to between 0.79 and 0.68 m.daN (69.91 and 60.18 lbf.in )
. (7) On the left side of the engine, connect the harness (1) to the left fire detection element rail (3) as follows:
(a) Put the harness (1) in position and put the two ring connectors on the two studs of the responder (2).
NOTE: The larger ring is installed on the larger stud and the smaller ring is installed on the smaller stud. The different sizes are necessary to make sure that the electrical polarity is correct.
(b) Install the two nuts (24) and (25) on the two studs of the responder (2). (8) On the right side of the engine, connect the harness (1) to the right fire detection element rail (22) as follows:
(a) Put the harness (1) in position and put the two ring connectors on the two studs of the responder (2).
NOTE: The larger ring is installed on the larger stud and the smaller ring is installed on the smaller stud. The different sizes are necessary to make sure that the electrical polarity is correct.
(b) Install the two nuts (24) and (25) on the two studs of the responder (2). (9) On the left side and on the right side of the engine, complete the connection of the harness (1) to the responders (2) as follows:
(a) TORQUE the larger nuts (24) to between 0.62 and 0.56 m.daN (54.87 and 49.56 lbf.in )
. (b) TORQUE the smaller nuts (25) to between 0.51 and 0.45 m.daN (45.13 and 39.82 lbf.in )
. (c) Install the screws (27) and the retainers (26) to attach the left and right harnesses (1) to the responders (2).
(d) TORQUE the screws (27) to between 0.34 and 0.28 m.daN (30.09 and 24.78 lbf.in )
. B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 26-12-17-860-080-A Subtask 26-12-17-710-061-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | ENGINE/2/FIRE DET/LOOP B | 8WD2 | A07 |
| 49VU | ENGINE/1/FIRE DET/LOOP A | 7WD1 | A06 |
| 121VU | ENGINE/ENG2/FIRE DET/LOOP A | 7WD2 | Q39 |
| 121VU | ENGINE/ENG1/FIRE DET/LOOP B | 8WD1 | Q38 |
D. Do this test:
(1) On the upper ECAM DU, make sure that the FIRE ENG1(2) LOOP A (B) FAULT message is out of view.
(2) Do an operational check of loop/squib (Ref. AMM TASK 26-12-00-710-001).
5. Close-up(1) On the upper ECAM DU, make sure that the FIRE ENG1(2) LOOP A (B) FAULT message is out of view.
(2) Do an operational check of loop/squib (Ref. AMM TASK 26-12-00-710-001).
Subtask 26-12-17-860-079-A Subtask 26-12-17-410-070-A
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-410-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
461AL 462AR
Subtask 26-12-17-440-057-A Subtask 26-12-17-410-071-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-410-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
461AL 462AR
D. Close Access
(1) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL 448AR
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
Subtask 26-12-17-862-063-A (1) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL 448AR
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
Core Engine Fire Detection Elements with the Rail