Removal of the Pylon Fire-Detector Ramp-Assembly
TASK 26-12-16-000-802-A
Removal of the Pylon Fire-Detector Ramp-Assembly
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 26-12-16-861-052-A ** ON A/C NOT FOR ALL Subtask 26-12-16-941-052-A ** ON A/C NOT FOR ALL
Subtask 26-12-16-020-053-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:42:48 UTC
Removal of the Pylon Fire-Detector Ramp-Assembly
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AFTER SHUTDOWN. THE ENGINE CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
WARNING:
ALWAYS USE APPLICABLE GLOVES TO TOUCH HOT PARTS. HOT PARTS CAN CAUSE INJURY TO PERSONS.
ZONE: 415
ZONE: 425
FIN: 3WD1 ** ON A/C NOT FOR ALL
FIN: 3WD2 ** ON A/C NOT FOR ALL
FIN: 4WD1 ** ON A/C NOT FOR ALL
FIN: 4WD2 ** ON A/C NOT FOR ALL
1. Reason for the JobZONE: 425
FIN: 3WD1 ** ON A/C NOT FOR ALL
FIN: 3WD2 ** ON A/C NOT FOR ALL
FIN: 4WD1 ** ON A/C NOT FOR ALL
FIN: 4WD2 ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | CAP - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 415 | LOWER PYLON |
| 425 | LOWER PYLON |
| FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 36-11-49-000-824-A | Removal of the Environmental Control System (ECS) Interface Duct |
| TASK 36-11-53-000-802-A | Removal of the Overpressure Valve |
| TASK 71-00-00-860-833-A | Procedure to Prevent Engine Motoring |
| TASK 71-13-00-010-802-A | Opening of the Fan Cowl Doors |
| TASK 75-25-49-000-802-A | Removal of the Turbine Cooling Air System |
| TASK 78-30-00-040-805-A | Deactivation of the Thrust Reverser System for Ground Maintenance |
| TASK 78-36-00-010-802-A | Opening of the Thrust Reverser Cowl-Doors |
Subtask 26-12-16-861-052-A ** ON A/C NOT FOR ALL Subtask 26-12-16-941-052-A ** ON A/C NOT FOR ALL
B. Safety Precautions
(1) Do the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
Subtask 26-12-16-865-058-A ** ON A/C NOT FOR ALL (1) Do the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
C. Open, safety and tag this(these) circuit breaker(s):
Subtask 26-12-16-010-060-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 4020KM1 (POWER PLANTDEMOUNTABLE, ENG 1) | |||
| 49VU | ENGINE/1/FIRE DET/LOOP A | 7WD1 | A06 |
| 121VU | ENGINE/ENG1/FIRE DET/LOOP B | 8WD1 | Q38 |
| FOR FIN: 4020KM2 (POWER PLANTDEMOUNTABLE, ENG 2) | |||
| 49VU | ENGINE/2/FIRE DET/LOOP B | 8WD2 | A07 |
| 121VU | ENGINE/ENG2/FIRE DET/LOOP A | 7WD2 | Q39 |
D. Get Access
(1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR
(2) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.
Subtask 26-12-16-040-055-A ** ON A/C NOT FOR ALL (1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR
(2) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.
E. Deactivation of the Thrust Reverser for Maintenance
Subtask 26-12-16-010-061-A ** ON A/C NOT FOR ALL WARNING:
YOU MUST DEACTIVATE THE THRUST REVERSER BEFORE YOU DO WORK ON OR AROUND IT. IF YOU DO NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND CAUSE AN INJURY AND/OR DAMAGE.
(1) Do the deactivation of the thrust reverser system for maintenance (Ref. AMM TASK 78-30-00-040-805). F. Get Access
(1) Open the thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL 462AR
Subtask 26-12-16-020-054-A ** ON A/C NOT FOR ALL (1) Open the thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL 462AR
G. Removal of the Components
(1) Remove the OPV (Ref. AMM TASK 36-11-53-000-802).
(2) Remove the Environment Control System (ECS) L-duct (Ref. AMM TASK 36-11-49-000-824).
(3) If necessary, remove the turbine cooling air-system-pipe (Ref. AMM TASK 75-25-49-000-802).
4. Procedure(1) Remove the OPV (Ref. AMM TASK 36-11-53-000-802).
(2) Remove the Environment Control System (ECS) L-duct (Ref. AMM TASK 36-11-49-000-824).
(3) If necessary, remove the turbine cooling air-system-pipe (Ref. AMM TASK 75-25-49-000-802).
Subtask 26-12-16-020-053-A ** ON A/C NOT FOR ALL
A. Removal of the Pylon Fire-Detector Ramp-Assembly
(2) Remove the two nuts (6) to disengage the two electrical connectors (7) from the two responders (5).
(3) Remove the two nuts (8) to disengage the two electrical connectors (9) from the two responders (5).
(4) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(5) Carefully disengage the four electrical cables (7) and (9) from the four clamps (10).
(6) Remove the screws (1) and the washers (2) from the ramp assembly (4).
(7) Carefully remove the ramp assembly (4) from the structure (3).
CAUTION:
DO NOT USE ELECTRICAL OR PNEUMATIC TOOLS TO LOOSEN OR TIGHTEN THE QUARTER-TURN FASTENER ON THE FIRE DETECTOR CLAMP. ONLY USE A MANUAL SCREWDRIVER. ELECTRICAL OR PNEUMATIC TOOLS WILL CAUSE THE FASTENER TO TURN TOO MUCH AND POSSIBLY TO BREAK.
(1) Turn the quarter-turn fasteners (11) by one quarter of a turn and open the clamps (10). (2) Remove the two nuts (6) to disengage the two electrical connectors (7) from the two responders (5).
(3) Remove the two nuts (8) to disengage the two electrical connectors (9) from the two responders (5).
(4) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(5) Carefully disengage the four electrical cables (7) and (9) from the four clamps (10).
(6) Remove the screws (1) and the washers (2) from the ramp assembly (4).
(7) Carefully remove the ramp assembly (4) from the structure (3).
Pylon Fire-Detectors Ramp-Assembly