W DOC AIRBUS | AMM A320F

Operational Check of Loop/Squib


TASK 26-12-00-710-001-A
Operational Check of Loop/Squib


ZONE: 210
1. Reason for the Job
Refer to the MPD TASK: 261200-01
OPERATIONAL CHECK OF LOOP/SQUIB
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 31-60-00-860-001-A
EIS Start Procedure
TASK 31-60-00-860-002-A
EIS Stop Procedure
3. Job Set-up
Subtask 26-12-00-861-050-A
A. Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
Subtask 26-12-00-860-050-A
B. Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
Subtask 26-12-00-865-050-A
C. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUENGINE/2/FIRE DET/LOOP B8WD2A07
49VUENGINE/1/FIRE DET/LOOP A7WD1A06
** ON A/C NOT FOR ALL
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B2WE1Q44
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B2WE2Q42
** ON A/C NOT FOR ALL
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A1WE1Q43
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A1WE2Q41
** ON A/C ALL
121VUENGINE/ENG2/FIRE DET/LOOP A7WD2Q39
121VUENGINE/ENG1/FIRE DET/LOOP B8WD1Q38
** ON A/C NOT FOR ALL
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B2WE1Q44
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B2WE2Q42
** ON A/C NOT FOR ALL
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B2WE1Q43
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A1WE1Q42
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B2WE2Q41
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A1WE2Q40
4. Procedure
Subtask 26-12-00-710-050-A
A. Do this test
ACTION
RESULT
1.On the ENG/APU FIRE panel 1WD:
  • push and hold the ENG 1(2) TEST pushbutton switch.
On the ENG/APU FIRE panel 1WD:
  • on the ENG 1(2)/FIRE pushbutton switch, the FIRE legend comes on.
  • on the ENG 1(2)/AGENT 1 and AGENT 2 pushbutton switches, the SQUIB and DISCH legends come on.

On the ENG panel 115VU:
  • on the ENG/1(2) FIRE/FAULT annunciator, the FIRE legend comes on.

After some seconds:
  • the continuous repetitive chime operates.

On the F/O and CAPT glareshield panels 130VU and 131VU:
  • the MASTER WARN lights flash.

On the upper ECAM DU:
  • the ENG 1(2) FIRE warning comes into view.

On the lower ECAM DU:
  • the ENGINE page automatically comes into view.
2.On the ENG/APU FIRE panel 1WD:

  • release the ENG 1(2) TEST pushbutton switch.
  • all the annunciator lights go off
  • the continuous repetitive chime stops
  • on the upper ECAM DU, the warning goes out of view
  • on the lower ECAM DU, the ENGINE page goes out of view.
5. Close-up
Subtask 26-12-00-860-051-A
A. Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
Subtask 26-12-00-862-050-A
B. De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.03.31 23:42:17 UTC