W DOC AIRBUS | AMM A320F

Remove Life Raft for In Shop Overhaul


TASK 25-66-41-920-001-A
Remove Life Raft for In Shop Overhaul


ZONE: 200
ZONE: 250
FIN: 7517MM ** ON A/C NOT FOR ALL
1. Reason for the Job
Refer to the MPD TASK: 256600-01
REMOVE LIFE RAFT FOR IN SHOP OVERHAUL.
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
250
AFT PASSENGER COMPARTMENT
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 25-66-00-00
FLOATATION AND SURVIVAL EQUIPMENT - DESCRIPTION AND OPERATION
3. Job Set-up
Subtask 25-66-41-861-051-A ** ON A/C NOT FOR ALL
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 25-66-41-010-050-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) For the location of the life raft(s), refer to Para. Component Location (Ref. AMM D/O 25-66-00-00).
   (2) Open the door/access panel of the related compartment(s).
NOTE: The location of the supplemental life raft(s) is shown with placard(s), which is (are) bonded on the outside of the related compartment(s).
   (3) If necessary, release/open the strap/clamp and remove the supplemental life raft(s) from the aircraft.
4. Procedure
Subtask 25-66-41-280-050-A ** ON A/C NOT FOR ALL
A. Workshop Procedure
   (1) Send the supplemental life raft to the workshop.
5. Close-up
Subtask 25-66-41-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Install serviceable supplemental life raft(s) and if necessary, attach/close the strap/clamp.
   (2) Close the door/access panel of the related compartment(s).
   (3) Make sure that the work area is clean and clear of tools and other items.
Subtask 25-66-41-862-051-A ** ON A/C NOT FOR ALL
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.03.31 23:41:40 UTC