Loading Procedure for 60.4-Inch x 61.5-Inch Unit Load Devices (ULD) in the Lower Deck Aft Cargo-Compartment
TASK 25-52-00-913-004-A
Loading Procedure for 60.4-Inch x 61.5-Inch Unit Load Devices (ULD) in the Lower Deck Aft Cargo-Compartment
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 25-52-00-860-093-A ** ON A/C NOT FOR ALL
Subtask 25-52-00-913-058-A ** ON A/C NOT FOR ALL
Subtask 25-52-00-860-094-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:37:43 UTC
Loading Procedure for 60.4-Inch x 61.5-Inch Unit Load Devices (ULD) in the Lower Deck Aft Cargo-Compartment
WARNING:
MAKE SURE THAT YOU DO NOT CAUSE ACCIDENTAL MOVEMENT OF A ULD DURING THE LOADING PROCEDURE:
- USE SUFFICIENT LOADING PERSONNEL TO DO THE PROCEDURE SAFELY.
WARNING:
DO NOT TOUCH THE POWER DRIVE UNIT:
- UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S)
- DURING OPERATION TO PREVENT INJURY FROM PARTS THAT TURN.
CAUTION:
IF THE COMPARTMENT IS NOT FULL AFTER THE CARGO LOADING PROCEDURE, LIFT THE LATCHES AT ALL THE EMPTY ULD POSITIONS. THIS WILL PREVENT ACCIDENTAL MOVEMENT OF A ULD, IF ULD LATCHES BECOME DEFECTIVE DURING FLIGHT. ACCIDENTAL MOVEMENT OF A ULD CAN CAUSE DAMAGE TO EQUIPMENT.
NOTE: When the joystick of the control panel is released, it moves to the neutral position and the PDUs stop.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | LOADER - PLATFORM |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 25-52-00-913-001-A | Operation of the Manually Operated Components of the Cargo Loading System (CLS) of the Lower Deck Forward and Aft Cargo-Compartments |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 25-52-00-860-093-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
(3) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(4) Set the light switch to on.
(5) Lower the manually operated pawls of the YZ-latches of the door-sill latches.
(6) Lower the entrance guide and lock it.
(7) On the control panel of the Cargo Loading System (CLS):
(a) Set the SYST PWR switch to the ON position.
(b) Make sure that the SYST ON lamp comes on.
4. Procedure(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
CAUTION:
MAKE SURE THAT THE LOADER PLATFORM AND THE AIRCRAFT DOOR SILL ARE CORRECTLY ALIGNED BEFORE YOU LOAD/UNLOAD A ULD.
THIS PREVENTS DAMAGE TO THE AIRCRAFT DOOR SILL AND/OR THE ULD.
(2) Put a LOADER - PLATFORM in position at the entrance to the aft cargo compartment. (3) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(4) Set the light switch to on.
(5) Lower the manually operated pawls of the YZ-latches of the door-sill latches.
(6) Lower the entrance guide and lock it.
(7) On the control panel of the Cargo Loading System (CLS):
(a) Set the SYST PWR switch to the ON position.
(b) Make sure that the SYST ON lamp comes on.
Subtask 25-52-00-913-058-A ** ON A/C NOT FOR ALL
A. (1) Put the manually operated components of the CLS in their correct positions for the loading of 60.4-inch x 61.5-inch ULDs (Ref. AMM TASK 25-52-00-913-001).
(2) Lower all the latches installed on the cargo compartment floor.
Subtask 25-52-00-913-059-D ** ON A/C NOT FOR ALL (2) Lower all the latches installed on the cargo compartment floor.
B. (1) Move the ULD into the ball mat area and stop the ULD at a position above the first transversal Power Drive Unit (PDU).
(2) Push the joystick on the control panel to the IN position. Hold it in this position until the ULD touches the YZ-latches on the continuous side guides opposite the door area.
(3) Push the joystick on the control panel to the FWD position. Hold it in this position until the ULD is in its load position.
(4) Release the joystick when the ULD touches the endstops or the XZ-latches in its load position.
(5) Lift the pawls of the XZ-latches installed aft of the ULD in its load position.
(6) Make sure that the ULD is engaged into the latches.
Subtask 25-52-00-913-060-D ** ON A/C NOT FOR ALL (2) Push the joystick on the control panel to the IN position. Hold it in this position until the ULD touches the YZ-latches on the continuous side guides opposite the door area.
(3) Push the joystick on the control panel to the FWD position. Hold it in this position until the ULD is in its load position.
(4) Release the joystick when the ULD touches the endstops or the XZ-latches in its load position.
(5) Lift the pawls of the XZ-latches installed aft of the ULD in its load position.
(6) Make sure that the ULD is engaged into the latches.
NOTE: The pawls of the XZ-latches also have the function of endstops.
C. (1) Make sure that all the pawls of the XZ-latches installed aft of the load position 33 are lifted.
(2) Move the ULD into the ball mat area and stop the ULD at a position above the first transversal Power Drive Unit (PDU).
(3) Push the joystick on the control panel to the IN position. Hold it in this position until the ULD touches the YZ-latches on the continuous side guides opposite the door area.
(4) Push the joystick on the control panel to the AFT position. Hold it in this position until the ULD moves aft.
(5) Release the joystick when the ULD touches the endstops in its load position.
(6) Lift the pawls of the XZ-latches, installed forward of the ULD in its load position.
Subtask 25-52-00-913-061-A ** ON A/C NOT FOR ALL (2) Move the ULD into the ball mat area and stop the ULD at a position above the first transversal Power Drive Unit (PDU).
(3) Push the joystick on the control panel to the IN position. Hold it in this position until the ULD touches the YZ-latches on the continuous side guides opposite the door area.
(4) Push the joystick on the control panel to the AFT position. Hold it in this position until the ULD moves aft.
(5) Release the joystick when the ULD touches the endstops in its load position.
(6) Lift the pawls of the XZ-latches, installed forward of the ULD in its load position.
D. (1) Make sure that all the pawls of the XZ-latches installed forward and aft of the load position 41 are lifted.
(2) Move the ULD into the ball mat area and stop the ULD at a position above the first transversal Power Drive Unit (PDU).
(3) Push the joystick on the control panel to the IN position. Hold it in this position until the ULD touches the YZ-latches on the continuous side guides opposite the door area.
(4) Make sure that the pawls of the XZ-latches installed in position 41, in forward and aft of the ULD, stay lifted and above the edge of the ULD floor.
(5) Release the joystick.
(6) Lift the pawls, of the door-sill latches.
5. Close-up(2) Move the ULD into the ball mat area and stop the ULD at a position above the first transversal Power Drive Unit (PDU).
(3) Push the joystick on the control panel to the IN position. Hold it in this position until the ULD touches the YZ-latches on the continuous side guides opposite the door area.
(4) Make sure that the pawls of the XZ-latches installed in position 41, in forward and aft of the ULD, stay lifted and above the edge of the ULD floor.
(5) Release the joystick.
(6) Lift the pawls, of the door-sill latches.
Subtask 25-52-00-860-094-A ** ON A/C NOT FOR ALL
A. Put the Aircraft back to its Initial Configuration
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Lift the pawls of the YZ-latches of the door-sill-latches.
(3) On the control panel of the CLS, set the SYST PWR switch to the OFF position.
Subtask 25-52-00-410-080-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Lift the pawls of the YZ-latches of the door-sill-latches.
(3) On the control panel of the CLS, set the SYST PWR switch to the OFF position.
B. Close Access
(1) Unlock the entrance guide and lift it.
(2) Set the light switch to off.
(3) Remove the loader platform.
(4) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
Subtask 25-52-00-862-072-A ** ON A/C NOT FOR ALL (1) Unlock the entrance guide and lift it.
(2) Set the light switch to off.
(3) Remove the loader platform.
(4) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
Aft Cargo Compartment for 60.4-Inch x 61.5-Inch ULDs