Remove XZ-Latches ACT for Detailed Inspection
TASK 25-50-00-200-015-A
Remove XZ-Latches ACT for Detailed Inspection
Refer to the MPD TASK: 255000-10
REMOVE XZ-LATCHES ACT FOR DETAILED INSPECTION
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 25-50-00-010-084-B ** ON A/C NOT FOR ALL
Subtask 25-50-00-020-054-A ** ON A/C NOT FOR ALL
Subtask 25-50-00-410-078-A ** ON A/C NOT FOR ALL Subtask 25-50-00-410-079-B ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:14:20 UTC
Remove XZ-Latches ACT for Detailed Inspection
ZONE: 150
1. Reason for the JobRefer to the MPD TASK: 255000-10
REMOVE XZ-LATCHES ACT FOR DETAILED INSPECTION
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 1 | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 150 | AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 25-52-34-000-004-A | Removal of the Fixed XZ-Latch for ACT |
| TASK 25-52-34-400-004-A | Installation of the Fixed XZ-Latch for ACT |
| TASK 28-11-27-000-001-A | Removal of the Additional Center Tank (ACT) |
| TASK 28-11-27-400-001-A | Installation of the Additional Center Tank (ACT) |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 25-50-00-010-084-B ** ON A/C NOT FOR ALL
A. Get Access
(1) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) in position at the opening of the aft cargo-compartment door.
(3) If the Cargo Loading System (CLS) installed:
(a) Put the WARNING NOTICE(S) on the control panel of the cargo loading system to tell persons not to use it.
Subtask 25-50-00-010-085-A ** ON A/C NOT FOR ALL 4. Procedure(1) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) in position at the opening of the aft cargo-compartment door.
(3) If the Cargo Loading System (CLS) installed:
(a) Put the WARNING NOTICE(S) on the control panel of the cargo loading system to tell persons not to use it.
Subtask 25-50-00-020-054-A ** ON A/C NOT FOR ALL
A. Remove the XZ-Latch for the ACT (Ref. AMM TASK 25-52-34-000-004) and/or (Ref. AMM D/O 25-52-34-00).
Subtask 25-50-00-210-088-A ** ON A/C NOT FOR ALL B. Detailed Inspection of the XZ-Latch
(1) Examine each XZ-latch and the adjacent area for cracks, corrosion and other damage.
(2) Make sure that all the fasteners related to the XZ-latch are in the correct condition.
Subtask 25-50-00-420-055-A ** ON A/C NOT FOR ALL (1) Examine each XZ-latch and the adjacent area for cracks, corrosion and other damage.
(2) Make sure that all the fasteners related to the XZ-latch are in the correct condition.
C. Install the XZ-Latch for the ACT (Ref. AMM TASK 25-52-34-400-004) and/or (Ref. AMM D/O 25-52-34-40).
5. Close-upSubtask 25-50-00-410-078-A ** ON A/C NOT FOR ALL Subtask 25-50-00-410-079-B ** ON A/C NOT FOR ALL
B. Close Access
(1) If the CLS installed:
(a) Remove the WARNING NOTICE(S).
(2) Remove the access platform(s).
(3) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(1) If the CLS installed:
(a) Remove the WARNING NOTICE(S).
(2) Remove the access platform(s).
(3) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).