W DOC AIRBUS | AMM A320F

Installation of the Heated Floor Panels at the Emergency Exit Doors


TASK 25-27-51-400-001-A
Installation of the Heated Floor Panels at the Emergency Exit Doors


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 15DS ** ON A/C NOT FOR ALL
FIN: 16DS ** ON A/C NOT FOR ALL
FIN: 5DS ** ON A/C NOT FOR ALL
FIN: 6DS ** ON A/C NOT FOR ALL
1. Reason for the Job
Self Explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 3M (10 FT)
No specific
AR
SCRAPER - NON METALLIC
No specific
Torque wrench: range to between 3.7 and 3.3 m.N (32.74 and 29.20 lbf.in ) T
No specific
Torque wrench: range to between 0.46 and 0.38 m.daN (40.71 and 33.63 lbf.in ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.04QAB2)
Coating_- Flexible Structure
(Material No.06AAB1)
Polysulfide Sealant-General Purpose Fillet -
(Material No.06AAC1)
Polysulfide Sealant-General Purpose Interfay -
(Material No.06LCG9)
Non Hardening Jointing Putty-Medium Temp. Area - -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14RAD1)
Cord-- Synthetic fiber Dia: 2.5 mm -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
251DG, 252DG
FOR [15DS] (FLOOR PANEL-HEAT.,DOOR AREA)
FOR [16DS] (FLOOR PANEL-HEAT.,DOOR AREA)
251DG, 252DG
FOR [5DS] (FLOOR PANEL-HEAT.,DOOR AREA)
FOR [6DS] (FLOOR PANEL-HEAT.,DOOR AREA)
231GX, 231KX, 232GX, 232KX
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 25-27-00-740-001-A
Bite Test of the Heated Floor Panel System
TASK 52-22-00-010-002-A
Opening of the Emergency Exit Doors from the Outside
TASK 52-22-00-410-002-A
Closing of the Emergency Exit Doors from the Outside
TASK 53-32-12-000-002-A
Removal of the Cabin Floor Panels
TASK 53-32-12-400-002-A
Installation of the Cabin Floor Panels
F Heated Floor Panel 15DS (16DS) ** ON A/C NOT FOR ALL
FOR [15DS] (FLOOR PANEL-HEAT.,DOOR AREA)
FOR [16DS] (FLOOR PANEL-HEAT.,DOOR AREA)
TASK 53-32-12-000-002-A
Removal of the Cabin Floor Panels
TASK 53-32-12-400-002-A
Installation of the Cabin Floor Panels
FOR [5DS] (FLOOR PANEL-HEAT.,DOOR AREA)
FOR [6DS] (FLOOR PANEL-HEAT.,DOOR AREA)
TASK 25-23-47-000-004-A
Removal of the Door Frame Linings of the LH FWD Emergency Exit Door, zone 231
TASK 25-23-47-000-009-A
Removal of the Door Frame Linings of the Right Forward Emergency Exit Door from Zone 232
TASK 25-23-47-400-004-A
Installation of the Door Frame Linings of the LH FWD Emergency Exit Door, zone 231
TASK 25-23-47-400-009-A
Installation of the Door Frame Linings of the Right Forward Emergency Exit Door in Zone 232
3. Job Set-up
Subtask 25-27-51-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
   (2) Make sure the ACCESS PLATFORM 3M (10 FT) is in position adjacent to the emergency exit.
   (3) Make sure the emergency exit door is opened (Ref. AMM TASK 52-22-00-010-002).
Subtask 25-27-51-010-051-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) FOR [5DS] (FLOOR PANEL-HEAT.,DOOR AREA), [6DS] (FLOOR PANEL-HEAT.,DOOR AREA)
     (a) Make sure the door frame linings 231GX 231KX (Ref. AMM TASK 25-23-47-000-004) or 232GX 232KX (Ref. AMM TASK 25-23-47-000-009) are removed as required.
   (2) FOR [15DS] (FLOOR PANEL-HEAT.,DOOR AREA), [16DS] (FLOOR PANEL-HEAT.,DOOR AREA)
     (a) Make sure the floor panel 251DG or 252DG is removed as required (Ref. AMM TASK 53-32-12-000-002).
Subtask 25-27-51-010-051-B ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) Make sure the floor panel 251DG or 252DG is removed as required (Ref. AMM TASK 53-32-12-000-002).
Subtask 25-27-51-865-051-A ** ON A/C NOT FOR ALL
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUDR AREA HTG PNLS-CTL3DSF08
2000VUDR AREA HTG PANELS-DR2-FPH1DSF07
** ON A/C NOT FOR ALL
2000VUDR AREA HTG PANELS-DR2-HTR1DSA08
2000VUDR AREA HTG PANELS-DR2-CTL3DSA06
** ON A/C NOT FOR ALL
2001VUDOOR AREA HTG PNL-DOOR3-HTR11DSF05
2001VUDR AREA HTG PNLS-DOOR 3-CTL13DSF03
4. Procedure
WARNING: DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
  • FLUSH IT AWAY WITH CLEAN WATER
  • GET MEDICAL AID.
CAUTION: USE ONLY THE SPECIFIED MATERIALS AND OBEY THE INSTRUCTIONS FROM THE MATERIAL MANUFACTURERS. OTHER MATERIALS CAN CAUSE DAMAGE TO THE SURFACE PROTECTION OF THE COMPONENTS AND THE RELATED AREA.
Subtask 25-27-51-910-050-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
   (1) Remove the old sealant from all components and/or adjacent area with a SCRAPER - NON METALLIC.
   (2) Clean the component interface and/or the adjacent area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (4) Do an inspection of the component interfaces and the adjacent area.
Subtask 25-27-51-420-050-A ** ON A/C NOT FOR ALL
B. Installation of the heated floor panel 5DS (6DS), 15DS (16DS)
   (1) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (2) Make sure that all the electrical connections are clean and in the correct condition.
   (3) FOR [5DS] (FLOOR PANEL-HEAT.,DOOR AREA), [6DS] (FLOOR PANEL-HEAT.,DOOR AREA)
     (a) Support the heated floor panel (4) above the installation position.
     (b) Install the bolt (7), the washer (6) and the bonding strap (5).
     (c) Connect the electrical connector (8).
     (d) Lower the heated floor panel (4) in position.
   (4) FOR [15DS] (FLOOR PANEL-HEAT.,DOOR AREA), [16DS] (FLOOR PANEL-HEAT.,DOOR AREA)
     (a) Put the heated floor panel (4) in the installation position.
     (b) Get access through the removed floor panel 251DG or 252DG as required.
     (c) Install the bolt (7), the washer (6) and the bonding strap (5).
     (d) Connect the electrical connector (8).
NOTE: Make sure the drain holes (12) in the heated floor panel (4), align with the drain connections (9).
   (5) Position the 14RAD1Cord-- Synthetic fiber Dia: 2.5 mm - (10) in the gap between the heated floor panel (4) and the floor.
NOTE: Make sure that approximatly 250.0 mm (10.0 in.) comes out at both ends of the heated floor panel.
   (6) Apply Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) to the gap between the heated floor panel (4) and the floor.
   (7) Make a loop of the 14RAD1Cord-- Synthetic fiber Dia: 2.5 mm - (10) ends and press into the Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) .
   (8) Apply a layer of Polysulfide Sealant-General Purpose Interfay - (Material No.06AAC1) to the underside and edges of the inner cover plate (13) and the outer cover plate (3).
   (9) Apply paint Coating_- Flexible Structure (Material No.04QAB2) to the underside and edges of the inner cover plate (13) and the outer cover plate (3).
   (10) Put the inner cover plate (13) and the outer cover plate (3) in the installation positions.
   (11) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the screws (1) and (2).
   (12) Install the screws (1) in the inner cover plate (13) and the outer cover plate (3).
   (13) Install the screws (2) in the outer cover plate (3).
   (14) TORQUE the screws to between 0.46 and 0.38 m.daN (40.71 and 33.63 lbf.in ) T.
   (15) Apply a smooth layer of Polysulfide Sealant-General Purpose Fillet - (Material No.
06AAB1) around the edges of the outer cover plate (3) and between the sides of the heated floor panel (4) and the floor.
Subtask 25-27-51-420-050-B ** ON A/C NOT FOR ALL
B. Installation of the Heated Floor Panel 15DS (16DS)
F Heated Floor Panel 15DS (16DS) ** ON A/C NOT FOR ALL
   (1) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (2) Make sure that all the electrical connections are clean and in the correct condition.
   (3) Put the heated floor panel (5) in the installation position.
   (4) Get access through the removed floor panel as required.
   (5) Install the bonding strap (10), the washer (11) and the screw (12).
CAUTION: MAKE SURE THAT THE BONDING STRAP(S) IS(ARE) CONNECTED BEFORE YOU CONNECT THE ELECTRICAL CONNECTOR(S).
   (6) Connect the electrical connector (13).
   (7) Make sure the drain holes (2) in the heated floor panel (5) align with the drain connections (6).
   (8) Put 14RAD1Cord-- Synthetic fiber Dia: 2.5 mm - (7) in the gap between the heated floor panel (5) and the floor. Make sure that approximatly 250.0 mm (10.0 in.) comes out at both ends of the heated floor panel.
   (9) Apply Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) (8) to the gap between the heated floor panel (5) and the floor.
   (10) Make a loop at the ends of the cord (7) and press it into the sealant (8).
   (11) Apply a layer of Polysulfide Sealant-General Purpose Interfay - (Material No.06AAC1) to the underside and edges of the plates (4) and (9).
   (12) Apply Coating_- Flexible Structure (Material No.04QAB2) to the underside and edges of the plates (4) and (9).
   (13) Put the plates (4) and (9) in positions.
   (14) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the screws (1) and (3) and install them
   (15) TORQUE the screws (1) and (3) to between 3.7 and 3.3 m.N (32.74 and 29.20 lbf.in ) T.
   (16) Apply a smooth layer of Polysulfide Sealant-General Purpose Fillet - (Material No.
06AAB1) around the edges of the plate (4) and the gap between the heated floor panel (5) and the floor.
Subtask 25-27-51-865-052-A ** ON A/C NOT FOR ALL
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUDR AREA HTG PNLS-CTL3DSF08
2000VUDR AREA HTG PANELS-DR2-FPH1DSF07
** ON A/C NOT FOR ALL
2000VUDR AREA HTG PANELS-DR2-HTR1DSA08
2000VUDR AREA HTG PANELS-DR2-CTL3DSA06
** ON A/C NOT FOR ALL
2001VUDOOR AREA HTG PNL-DOOR3-HTR11DSF05
2001VUDR AREA HTG PNLS-DOOR 3-CTL13DSF03
Subtask 25-27-51-740-050-A ** ON A/C NOT FOR ALL
D. Do the BITE test of the heated floor panel system (Ref. AMM TASK 25-27-00-740-001).
5. Close-up
Subtask 25-27-51-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) FOR [5DS] (FLOOR PANEL-HEAT.,DOOR AREA), [6DS] (FLOOR PANEL-HEAT.,DOOR AREA)
     (a) Install the door frame linings 231GX 231KX (Ref. AMM TASK 25-23-47-400-004) or 232GX 232KX (Ref. AMM TASK 25-23-47-400-009) as required.
   (3) FOR [15DS] (FLOOR PANEL-HEAT.,DOOR AREA), [16DS] (FLOOR PANEL-HEAT.,DOOR AREA)
     (a) Install the floor panel 251DG or 252DG as required (Ref. AMM TASK 53-32-12-400-002).
   (4) Close the emergency exit door from the outside (Ref. AMM TASK 52-22-00-410-002).
   (5) Remove the access platform(s).
Subtask 25-27-51-410-050-B ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the floor panel 251DG or 252DG as required (Ref. AMM TASK 53-32-12-400-002).
   (3) Close the emergency exit door from the outside (Ref. AMM TASK 52-22-00-410-002).
   (4) Remove the access platform(s).
Subtask 25-27-51-862-050-A ** ON A/C NOT FOR ALL
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.03.31 23:33:08 UTC