W DOC AIRBUS | AMM A320F

Removal of the Heated Floor Panels at the Emergency Exit Doors


TASK 25-27-51-000-001-A
Removal of the Heated Floor Panels at the Emergency Exit Doors


FIN: 15DS ** ON A/C NOT FOR ALL
FIN: 16DS ** ON A/C NOT FOR ALL
FIN: 5DS ** ON A/C NOT FOR ALL
FIN: 6DS ** ON A/C NOT FOR ALL
1. Reason for the Job
Self Explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 3M (10 FT)
No specific
AR
CAP - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
SCRAPER - NON METALLIC
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
251DG, 252DG
FOR [15DS] (FLOOR PANEL-HEAT.,DOOR AREA)
FOR [16DS] (FLOOR PANEL-HEAT.,DOOR AREA)
251DG, 252DG
FOR [5DS] (FLOOR PANEL-HEAT.,DOOR AREA)
FOR [6DS] (FLOOR PANEL-HEAT.,DOOR AREA)
231GX, 231KX, 232GX, 232KX
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 52-22-00-010-002-A
Opening of the Emergency Exit Doors from the Outside
TASK 53-32-12-000-002-A
Removal of the Cabin Floor Panels
F Heated Floor Panel 15DS (16DS) ** ON A/C NOT FOR ALL
FOR [15DS] (FLOOR PANEL-HEAT.,DOOR AREA)
FOR [16DS] (FLOOR PANEL-HEAT.,DOOR AREA)
TASK 53-32-12-000-002-A
Removal of the Cabin Floor Panels
FOR [5DS] (FLOOR PANEL-HEAT.,DOOR AREA)
FOR [6DS] (FLOOR PANEL-HEAT.,DOOR AREA)
TASK 25-23-47-000-004-A
Removal of the Door Frame Linings of the LH FWD Emergency Exit Door, zone 231
TASK 25-23-47-000-009-A
Removal of the Door Frame Linings of the Right Forward Emergency Exit Door from Zone 232
3. Job Set-up
Subtask 25-27-51-861-050-A ** ON A/C NOT FOR ALL
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 25-27-51-010-050-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Put the ACCESS PLATFORM 3M (10 FT) in position adjacent to the emergency exit.
   (2) Open the emergency exit door from the outside (Ref. AMM TASK 52-22-00-010-002).
   (3) FOR [5DS] (FLOOR PANEL-HEAT.,DOOR AREA), [6DS] (FLOOR PANEL-HEAT.,DOOR AREA)
     (a) Remove the door frame linings 231GX 231KX (Ref. AMM TASK 25-23-47-000-004) or 232GX 232KX (Ref. AMM TASK 25-23-47-000-009) as required.
   (4) FOR [15DS] (FLOOR PANEL-HEAT.,DOOR AREA), [16DS] (FLOOR PANEL-HEAT.,DOOR AREA)
     (a) Remove the floor panel 251DG or 252DG as required (Ref. AMM TASK 53-32-12-000-002).
Subtask 25-27-51-010-050-B ** ON A/C NOT FOR ALL
B. Get Access
   (1) Put the ACCESS PLATFORM 3M (10 FT) in position adjacent to the emergency exit.
   (2) Open the emergency exit door from the outside (Ref. AMM TASK 52-22-00-010-002).
   (3) Remove the floor panel 251DG or 252DG as required (Ref. AMM TASK 53-32-12-000-002).
Subtask 25-27-51-865-050-A ** ON A/C NOT FOR ALL
C. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUDR AREA HTG PNLS-CTL3DSF08
2000VUDR AREA HTG PANELS-DR2-FPH1DSF07
** ON A/C NOT FOR ALL
2000VUDR AREA HTG PANELS-DR2-HTR1DSA08
2000VUDR AREA HTG PANELS-DR2-CTL3DSA06
** ON A/C NOT FOR ALL
2001VUDOOR AREA HTG PNL-DOOR3-HTR11DSF05
2001VUDR AREA HTG PNLS-DOOR 3-CTL13DSF03
4. Procedure
Subtask 25-27-51-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the heated floor panel 5DS (6DS), 15DS (16DS)
   (1) Remove the inner cover plate screws (1).
   (2) Remove the inner cover plate (13).
   (3) Pull the cord (10) up to remove the sealant from between the heated floor panel (4) and the floor.
   (4) Remove the sealant from around the outer cover plate (3) with a SCRAPER - NON METALLIC.
   (5) Remove the outer cover plate screws (1) and (2).
   (6) Remove the outer cover plate (3).
   (7) FOR [5DS] (FLOOR PANEL-HEAT.,DOOR AREA), [6DS] (FLOOR PANEL-HEAT.,DOOR AREA)
     (a) Carefully lift up and support the heated floor panel (4) to get access to the electrical connections installed on the floor structure below the heated floor panel.
   (8) FOR [15DS] (FLOOR PANEL-HEAT.,DOOR AREA), [16DS] (FLOOR PANEL-HEAT.,DOOR AREA)
     (a) Get access to the electrical connections installed on the floor structure below the heated floor panel through the removed floor panels 251DG or 252DG.
   (9) Remove the bolt (7), the washer (6) and the bonding strap (5).
   (10) Disconnect the electrical connector (8).
   (11) Remove the heated floor panel (4).
   (12) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
Subtask 25-27-51-020-050-B ** ON A/C NOT FOR ALL
A. Removal of the Heated Floor Panel 15DS and 16DS
F Heated Floor Panel 15DS (16DS) ** ON A/C NOT FOR ALL
   (1) Remove the screws (1) and the plate (9).
   (2) Pull the cord (7) and remove the sealant (8).
   (3) Remove the sealant from the plate (4) with a SCRAPER - NON METALLIC.
   (4) Remove the screws (1) and (3) and the plate (4).
   (5) Get access to the electrical connections installed on the floor structure below the heated floor panel through the removed floor panels.
   (6) Disconnect the electrical connector (13).
   (7) Put a CAP - BLANKING on each disconnected electrical connector.
CAUTION: MAKE SURE THAT THE ELECTRICAL CONNECTOR(S) IS(ARE) DISCONNECTED BEFORE YOU DISCONNECT THE BONDING STRAP(S).
   (8) Remove the screw (12), the washer (11) and the bonding strap (10).
   (9) Remove the heated floor panel (5).
[Rev.10 from 2021] 2026.03.31 23:33:07 UTC