W DOC AIRBUS | AMM A320F

Installation of the Control Unit


TASK 25-27-34-400-001-A
Installation of the Control Unit


FIN: 14DS ** ON A/C NOT FOR ALL
FIN: 4DS ** ON A/C NOT FOR ALL
1. Reason for the Job
Self Explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
152FW
FOR [14DS] (CTL UNIT-DOOR AREA HEATING)
152FW
FOR [4DS] (CTL UNIT-DOOR AREA HEATING)
132JW
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 25-27-00-740-001-A
Bite Test of the Heated Floor Panel System
TASK 25-55-12-000-003-A
Removal of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65
TASK 25-55-12-400-003-A
Installation of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
F Control Unit 4DS, 14DS ** ON A/C NOT FOR ALL
F Control Unit 14DS ** ON A/C NOT FOR ALL
FOR [14DS] (CTL UNIT-DOOR AREA HEATING)
TASK 25-55-12-000-003-A
Removal of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65
TASK 25-55-12-400-003-A
Installation of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
FOR [4DS] (CTL UNIT-DOOR AREA HEATING)
TASK 25-54-12-000-003-A
Removal of the Sidewall Panels in the Forward Cargo Compartment
TASK 25-54-12-400-003-A
Installation of the Sidewall Panels in the Forward Cargo Compartment
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
3. Job Set-up
Subtask 25-27-34-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
   (2) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position adjacent to the FWD or AFT cargo compartment doors as required.
   (3) FOR [4DS] (CTL UNIT-DOOR AREA HEATING)
     (a) Make sure that the FWD cargo compartment door is open (Ref. AMM TASK 52-30-00-860-001).
     (b) Make sure that the FWD CARGO COMPT light switch 6LU is set to ON.
   (4) FOR [14DS] (CTL UNIT-DOOR AREA HEATING)
     (a) Make sure that the AFT cargo compartment door is open (Ref. AMM TASK 52-30-00-860-001).
     (b) Make sure that the AFT CARGO COMPT light switch 8LU is set to ON.
Subtask 25-27-34-010-052-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) FOR [4DS] (CTL UNIT-DOOR AREA HEATING)
     (a) Make sure that the sidewall panel 132JW is removed (Ref. AMM TASK 25-54-12-000-003).
   (2) FOR [14DS] (CTL UNIT-DOOR AREA HEATING)
     (a) Make sure that the sidewall panel 152FW is removed (Ref. AMM TASK 25-55-12-000-003).
Subtask 25-27-34-860-050-B ** ON A/C NOT FOR ALL
C. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
   (2) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position adjacent to the aft cargo compartment doors as required.
   (3) Make sure that the aft cargo compartment door is open (Ref. AMM TASK 52-30-00-860-001).
   (4) Make sure that the AFT CARGO COMPT light switch 8LU is set to ON.
Subtask 25-27-34-010-052-B ** ON A/C NOT FOR ALL
D. Aircraft Maintenance Configuration
   (1) Make sure that the sidewall panel 152FW is removed (Ref. AMM TASK 25-55-12-000-003).
Subtask 25-27-34-865-051-A ** ON A/C NOT FOR ALL
E. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
122VUELEC/GALLEY/CNTOR7MCS28
** ON A/C NOT FOR ALL
2000VUDR AREA HTG PNLS-CTL3DSF08
2000VUDR AREA HTG PANELS-DR2-FPH1DSF07
** ON A/C NOT FOR ALL
2000VUDR AREA HTG PANELS-DR2-HTR1DSA08
2000VUDR AREA HTG PANELS-DR2-CTL3DSA06
** ON A/C NOT FOR ALL
2001VUDOOR AREA HTG PNL-DOOR3-HTR11DSF05
2001VUDR AREA HTG PNLS-DOOR 3-CTL13DSF03
4. Procedure
Subtask 25-27-34-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Control Unit 4DS, 14DS
F Control Unit 4DS, 14DS ** ON A/C NOT FOR ALL
   (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (2) Clean the component interfaces and the adjacent area.
   (3) Do an inspection of the component interfaces and the adjacent area.
   (4) FOR [4DS] (CTL UNIT-DOOR AREA HEATING)
     (a) Carefully slide the control unit (9) on the adapter assembly (8).
NOTE: Make sure that the locking catch (10) holds the control unit (9) in position.
   (5) FOR [14DS] (CTL UNIT-DOOR AREA HEATING)
     (a) Install the control unit (4) with the brackets (5), the washers (7) and the screws (6) on the support structure (3).
   (6) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (7) Make sure that all the electrical connections are clean and in the correct condition.
   (8) Connect the electrical connector (1).
   (9) Safety the electrical connector (1) with the spring latches (2).
Subtask 25-27-34-420-050-B ** ON A/C NOT FOR ALL
A. Installation of the Control Unit 14DS
F Control Unit 14DS ** ON A/C NOT FOR ALL
   (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (2) Clean the component interfaces and the adjacent area.
   (3) Do an inspection of the component interfaces and the adjacent area.
   (4) Install the control unit (7) with the brackets (4), the washers (5) and the screws (6) on the support structure (3).
   (5) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (6) Make sure that all the electrical connections are clean and in the correct condition.
   (7) Connect the electrical connector (1).
CAUTION: MAKE SURE THAT THE SPRING LATCHES CORRECTLY HOLD THE CONNECTOR IN THE FULLY ENGAGED POSITION. THE SPRING LATCHES PREVENT UNWANTED MOVEMENT OF THE CONNECTOR, AND THUS THE RISK OF ARCING, WHICH CAN CAUSE DAMAGE TO THE UNIT.
   (8) Safety the electrical connector (1) with the spring latches (2).
Subtask 25-27-34-865-052-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
122VUELEC/GALLEY/CNTOR7MCS28
** ON A/C NOT FOR ALL
2000VUDR AREA HTG PNLS-CTL3DSF08
2000VUDR AREA HTG PANELS-DR2-FPH1DSF07
** ON A/C NOT FOR ALL
2000VUDR AREA HTG PANELS-DR2-HTR1DSA08
2000VUDR AREA HTG PANELS-DR2-CTL3DSA06
** ON A/C NOT FOR ALL
2001VUDOOR AREA HTG PNL-DOOR3-HTR11DSF05
2001VUDR AREA HTG PNLS-DOOR 3-CTL13DSF03
Subtask 25-27-34-740-050-A ** ON A/C NOT FOR ALL
C. Do the BITE test of the heated floor panel system (Ref. AMM TASK 25-27-00-740-001).
5. Close-up
Subtask 25-27-34-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) FOR [4DS] (CTL UNIT-DOOR AREA HEATING)
     (a) Install the sidewall panel 132JW (Ref. AMM TASK 25-54-12-400-003).
     (b) Set the FWD CARGO COMPT light switch 6LU to OFF.
     (c) Close the FWD cargo compartment door (Ref. AMM TASK 52-30-00-860-002).
   (3) FOR [14DS] (CTL UNIT-DOOR AREA HEATING)
     (a) Install the sidewall panel 152FW (Ref. AMM TASK 25-55-12-400-003).
     (b) Set the AFT CARGO COMPT light switch 8LU to OFF.
     (c) Close the AFT cargo compartment door (Ref. AMM TASK 52-30-00-860-002).
   (4) Remove the access platform(s).
Subtask 25-27-34-410-050-B ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the sidewall panel 152FW (Ref. AMM TASK 25-55-12-400-003).
   (3) Set the AFT CARGO COMPT light switch 8LU to OFF.
   (4) Close the aft cargo compartment door (Ref. AMM TASK 52-30-00-860-002).
   (5) Remove the access platform(s).
Subtask 25-27-34-862-050-A ** ON A/C NOT FOR ALL
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.03.31 23:32:56 UTC